HomeMy WebLinkAbout2016-11-2Minutes for November 2 2016 adopted Nov. 16
CONSERVATION COMMISSION N A N T U C K E
PUBLIC MEETING TOWN CLERK
2 Bathing Beach Road
Nantucket, Massachusetts 02554 2916 NOV 17 PM 12' 17
w-ww nantucket- ma.gov
Wednesday, November 2, 2016 4:00 P.M.
4 Fairgrounds Road, Training Room
Commissioners: Andrew Bennett(Chair), Ashley Erisman(Vice Chair), Ernie Steinauer, David LaFleur,
Ben Champoux, Ian Golding, Joe Topham
Called to order at 4:03 p.m.
Staff in attendance: Jeff Carlson, Natural Resources Coordinator; Terry Norton, Town Minutes Taker
Attending Members: Bennett, Erisman, Steinauer, LaFleur, Champoux, Golding, Topham
,Absent Members: None
Late Arrivals: Erisman, 4:07 p.m.
Earlier Departure: None
Agenda adopted by unanimous consent
*Matter has not been heard
1. PUBLIC MEETING
A. Public Comment — Carlson announced that supplemental information deadline for the next meeting is Thursday, Nov 10.
11. PUBLIC HEARING
A. Notice of Intent
1. Edwin Snider RT — 1 Brock's Court (42.3.4 -84) SE48- 2834(Cont 11/16/2016)
2. Sunset House, LLC — 15 Hallowell Lane (30 -10) SE48 -2924 (Cont 11/16/2016)
3. Nantucket Islands Land Bank —17 Commercial Wharf & Unnumbered lot New Whale Street (42.2.4 -7 &8) SE48 -2885
(Cont 12/14/2016)
4. Alan A. Shuch Trustee — 45 Quidnet Road (21 -21) SE48 -2928
Sitting Bennett, Steinauer, LaFleur, Champoux, Golding, Topham
Recused None
Documentation Site plans, topographical maps, photos, NINH sign off letter, departmental reports, and correspondence.
Representative Bob Emack
Sarah Alger, Sarah F. Alger P.C.
Public None
Discussion (4:06) None
Staff This was waiting for determination from Massachusetts Natural Heritage; they provided a letter of no take
and no adverse impact under wetland act.
Have everything needed to close.
Motion Motion to Close. (made by: LaFleur) (seconded by: Champoux)
Vote Carried unanimously
5. Reyes — 19 East Creek Road (55 -60) SE48 -2929
Sitting Bennett, Erisman, Steinauer, LaFleur, Champoux, Golding, Topham
Recused None
Documentation Site plans, topographical maps, photos, NT IN sign off letter, departmental reports, and correspondence.
Representative Paul Santos, Nantucket Surveyors — Reviewed NOI for demolition and reconstruction of a single- family
dwelling; resource areas: creek, saltmarsh, land subject to coastal storm flowage, and coastal bank. This
was held for Department of Environmental Protection (DEP) number and Massachusetts Natural
Heritage determination. There had been questions about the existing garage; it was a permitted part of the
original plan. Foundation will be piles and meet flood zone standards. The driveway currently exists and
will not change; the site is on Town sewer and water.
Steven Cohen, Cohen & Cohen Law PC — They broke up the massing to mitigate the impact on wetland
scenic views and put much of the new massing toward the front moving it away from the wetlands. The
proposed building is conceptual that has no Historic District Commission (HDC) approval. The current
structure is slab on grade.
Public Cormac Collier, Executive Director Nantucket Land Council — They have serious reservations about the
project, about pulling down the 1600 square foot (SF) house and replacing it with a larger house. He feels
some aspects of the existing property are not in compliance with the original Order of Conditions. The
scenic view is a serious consideration; this board should also look at the affect on scenic views from the
abutting Town property.
Discussion (4:07) Golding — This design is more elegant and does take the scenic view into consideration but the mass is
considerably larger than the existing.
Erisman — This plan has more windows and doors; there would be an impact on the wetland from interior
night lighting. Feels the impact of construction needs to be considered; this is right at the wetland.
Page 1of4
Minutes for November 2 2016 adopted Nov. 16
B. Requests for Determination of Applicability
8. Irene Parent — 139 Polpis Road (44 -7.2)
Sitting Bennett, Erisman, Steinauer, LaFleur, Champoux, Golding, Topham
Recused None
Documentation Site and topographical plans, photos, requisite departmental 1 reports and correspondence.
Representative Bob Emack — An isolated wetland boarders Polpis Road and there is an isolated vegetated wetland off
site approved in 2010. The work is to brush cut a path.
Public None
Discussion (5:09) Erisman — risked if Mr. Emack had filed with Massachusetts Natural Heritage.
Staff Bruce Perry, Laurentide Environmental, LLC, confirmed the wetland boundaries.
There is a small sliver about 2 -feet wide within ConCom jurisdiction.
Filing with Massachusetts Natural Heritage is under the NOI; it's not normally required here.
Recommend issue with Positive 2A confirming boundaries and Negative 3 for work within the buffer.
Motion Motion to Approve as recommended. (made by: Steinauer) (seconded by: LaFleur)
Vote Carried unanimously
III. PUBLIC MEETING
A. Certificates of Compliance
1. Vento — 87 Eel Point Rd (32 -11) SE48 -2328
Sitting Bennett, Erisman, Steinauer, LaFleur, Champoux, Golding, Topham
Staff For installing of coir material. Recommend issue as an invalid order as they have another Order of
Conditions that supersedes thus.
Discussion (5:14) None
Motion Motion to Issue as an invalid order. (made by: LaFleur) (seconded by: Steinauer)
Vote Carried unanimously
2. Reiskin — 34 Codfish Park Road (73.1.3 -53) SE48 -2697
3. Reiskin — 34 Codfish Park Road (73.1.3 -53) SE48 -2512
Sitting Bennett, Erisman, Steinauer, LaFleur, Champoux, Golding, Topham
Staff These both are related to renovation & expansion of construction and installation of a septic system. Both
are complete and in compliance
Discussion (5:15) None
Motion Motion to Issue both SE48 -2697 and SE48 -2512. (made by: Champoux) (seconded by: Steinauer)
Vote Carried unanimously
B. Orders of Condition
1. Alan A. Shuch Trustee — 45 Quidnet Road (21 -21) SE48 -2928
Sitting Bennett, Erisman, Steinauer, LaFleur, Champoux, Golding, Topham
Staff Conditioned that work is to be done by hand; no materials within the 50 -foot setback; the silt fence is to
be supplemented by hay bales upland of the silt fence. Condition 20 states work is to be done on the
structure if the water level of the pond gets within 10 feet of the structure.
Discussion (5:17) None
Motion Motion to Approve as drafted. (made by: Golding) (seconded by: Champoux)
Vote Carried unanimously
2. Thirty -Six Pocomo Road N.T — 36 Pocomo Road (14 -79) N yN -126
Sitting Bennett, Erisman, Steinauer, LaFleur, Champoux, Golding, Topham
Staff Conditions discussed would include: a performance bond or filing for an extension; survivorship of trees
and shrubs at 95 %; quantifying that there is no loose soil; submission of weekly work logs and weekly
onsite inspections even through the winter; silt fence and haybales; and no roto - tilling of love grass.
Discussion (5:18) Erisman — Should have something about removal of invasive species if found.
Bennett — Asked about marking the 25.
Steinauer — Suggested mowing the love grass and spraying with Rodeo® herbicide; that saves the soil.
Cited how the Airport did a restoration project that is now beautiful.
Champoux — There isn't enough time now to mow and treat. The excavator should take the least amount
of soil possible though there might not be a way to quantify that. Reiterated the need to remove the love
grass roots.
Motion None at this time.
Vote Carried
C. Monitoring Reports
1. Nantucket Barn, LLC — 3 North Avenue(42.4.4 -17) SE48 -2710
2. Nantucket Conservation Foundation — Dike Road /Polpis Harbor (20 -25) SE48 -2156
Page 3 of 4