HomeMy WebLinkAbout2016-7-13Minutes for July 13 2016 adopted July 26
CONSERVATION COMMISSION
PUBLIC MEETING
2 Bathing Beach Road
Nantucket, Massachusetts 02554
www.nantucket-ma.gov
Wednesday, July 13, 2016 4:00 P.M.
4 Fairgrounds Road, Training Room
Commissioners: Ernie Steinauer (Chair), Andrew Bennett (Vice Chair), Ashley Erisman, David LaFleur,
None
Ben Champoux, Ian Golding, Joe Topham
Continued to July 27, 2016 without objection.
w
Called to order at 4:02 p.m.
4. Windy Point Trust — 5 Hulbert Avenue (29.2.3 -5) SE48 -2897
�J
Staff in attendance: Joanne Dodd, Natural Resources Office Administrator; Terry Norton Minutes Taker
r
None
Attending Members: Steinauer, Erisman, LaFleur, Champoux, Golding, Topham
�
G
Absent Members: Bennett
331-
n
Late Arrivals: LaFleur, 4:03 p.m.; Golding, 4:05 p.m.
Steven Cohen, Cohen & Cohen Law PC — Other private parties use the walkway but it is not for public
r
Earlier Departure: None
Public
n
Discussion (4:18)
Erisman — It shouldn't go over the dune She's opposed to this; there is a path.
Agenda adopted by unanimous consent
--
*Matter has not been heard
C"
I. PUBLIC MEETING
Staff
Have everything needed to close.
A. Public Comment — None
Motion to Close. (made by: LaFleur) (seconded by: Champoux)
Vote
II. PUBLIC HEARING
A. Notice of Intent
1. Edwin Snider RT —1 Brock's Court (42.3.4 -84) SE48 -2834 (07/27/16)
2. Edwin Snider RT —1 Brock's Court (42.3.4 -84) SE48 -2835 (07/27/16)
3. *Holt — 98 Squam Road — (12 -36) SE48 -2898
Sitting Steinauer, Erisman, LaFleur, Champoux, Golding, Topham
Recused None
Documentation Site plans, topographical maps, photos, MNH sign off letter, departmental reports, and correspondence.
Representative Arthur D. Gasbarro, Nantucket Engineering & Survey — Submitted revised plans at the table moving
pool 5 feet away from the wetlands to allow the fence to be squared off and the pergola being replaced by
a cabana. Resource areas are a bordering vegetated wetland and isolated vegetated wetland; work is within
the 50 -foot buffer zone. Temporary dewatering will be outside the 100 -foot buffer zone. Will ask for a
waiver based on 2 -foot separation from ground water. Asked for a continuance for two weeks.
Public Cormac Collier, Executive Director Nantucket Land Council — Noted that a 2014 aerial photo showed
the garage and the lawn were not there; the last permit through ConCom was for the dwelling and
walkway. When new information arises, the ConCom can retroactively address items within the buffer
zones; would like the ConCom to address that. Would also like to know why the isolated vegetated
wetland wasn't flagged and why there is lawn within the 25 -foot buffer and when the garage was built.
Discussion (4:03) Steinauer — Mr. Carlson would have to be consulted in regards to whether or not the previous work was
permitted.
Golding — Would like to have a site visit.
Staff
None
Motion
Continued to July 27, 2016 without objection.
Vote
N/A
4. Windy Point Trust — 5 Hulbert Avenue (29.2.3 -5) SE48 -2897
Sitting
Steinauer, Erisman, LaFleur, Champoux, Golding, Topham
Recused
None
Documentation
Site plans, topographical maps, photos, MNH sign off letter, departmental reports, and correspondence.
Representative
Jeff Blackwell, Blackwell & Assoc — The revised plans show a raised boardwalk. Asking for 2" boards
with 1/2 inch spacing.
Steven Cohen, Cohen & Cohen Law PC — Other private parties use the walkway but it is not for public
use; it is in an abutters way.
Public
None
Discussion (4:18)
Erisman — It shouldn't go over the dune She's opposed to this; there is a path.
Steinauer — This would be an improvement over walking through the dune.
Champoux — At the last meeting, he noted that a permitted boardwalk would have been required it be
elevated.
Topham - Agrees it should be elevated.
Staff
Have everything needed to close.
Motion
Motion to Close. (made by: LaFleur) (seconded by: Champoux)
Vote
Carried unanimously
Page 1 of 3
Minutes for Tuly 13 2016 adopted Tuly 26
5. * Five on a Dime — 8 Pilgrim Court (41- 217.3, 217.4 & Portion of 217) SE48 -2899
Sitting
Steinauer, Erisman, LaFleur, Champoux, Golding, Topham
Recused
None
Documentation
Site plans, topographical maps, photos, MNH sign off letter, departmental reports, and correspondence.
Representative
Dan Malloy, Site Design Engineering — This is for a house and grading in an area previously approve for
alteration. Resource area is a wetland on abutting property. Ground water depth varies around 10 feet in
the area of the proposed work.
Public
None
Discussion (4:30)
Steinauer — Confirmed that everything within the 50 -foot buffer is natural vegetation.
Erisman — Asked about the proposed lighting.
Malloy — Presently only looking at low landscape lighting for the pool.
Golding — Would like to know how irrigation will be handled.
Steinauer — They would have to go by the best management practices in regards to irrigation.
Discussion about whether or not there is a need to mitigate drainage.
Steinauer — This can be conditioned to include drainage.
Golding — Wants the pool conditioned to be drained outside the 100 -foot buffer.
Staff
Have everything needed to close.
Motion
Motion to Close. (made by: Golding) (seconded by: LeFleur)
Vote
Carried unanimously
6. * Laz Family NT — 20 Waquoit Road (90 -5) SE48- (07/27/16)
7. *78 Wauwinet Road LLC — 78 Wauwinet Road (14 -18) SE48 -
Sitting
Steinauer, Erisman, LaFleur, Champoux, Golding, Topham
Recused
None
Documentation
Site plans, topographical maps, photos, MNH sign off letter, departmental reports, and correspondence.
Representative
Arthur D. Gasbarro, Nantucket Engineering & Survey — For work on a lawn and patio in the buffer to
bordering vegetated wetlands. Most work is outside the 100 -foot buffer but subject to Massachusetts
Natural Heritage review. Looking to preserve the natural trees and vegetation in the area. Outside the 100 -
foot buffer, ground water is below 12 feet. Don't have Massachusetts Natural Heritage sign off.
Requested a two -week continuance.
Public
None
Discussion (4:43)
Erisman — Asked if there would be any brush cutting.
Gasbarro — To some degree to clear land for construction, but screening from the road will be preserved.
Staff
None
Motion
Continued to July 27, 2016 without objection.
Vote
N/A
III. PUBLIC MEETING
A. Minor Modifications
1. Nantucket Bam LLC — 3 North Avenue (42.4.4 -17) SE48 -2710
Sitting Steinauer, Erisman, LaFleur, Champoux, Golding, Topham
Recused None
Documentation Site plans, topographical maps, photos, MNH sign off letter, departmental reports, and correspondence.
Representative Arthur D. Gasbarro, Nantucket Engineering & Survey — This is within land subject to coastal storm
flowage behind the Nantucket Hotel; the minor modification is to permit a sewer line to the food grinder
shed that was omitted from the plan. It is outside a 25 -foot buffer to a surrounding wetland. There is
invasive species work associated with the permit.
Public None
Discussion (4:51) None
Staff Have everything needed to close.
Motion Motion to Close and Issue. (made by: Champoux) (seconded by: Topham)
Vote Carried unanimously
B. Certificates of Compliance
1. Four Saratoga LLC —14 Tennessee Ave (60.1.2 -6) SE48 -2506 (07/27/16)
2. Thompson —14 Fargo Way(14 -17) SE48 -2645 (07/27/16)
3. Girvin — 9 Jonathan Way (75 -41) SE48 -1102 Reissue
4. Girvin — 9 Jonathan Way (75 -41) SE48 -1630 Reissue
Sitting Steinauer, Erisman, LaFleur, Champoux, Golding, Topham
Staff None
Discussion (4:54) None
Motion Motion to Reissue both SE48 -1102 and SE48 -1630. (made by: Golding) (seconded by: Topham)
Vote Carried unanimously
Page 2of3
Minutes for July 13 2016 adopted July 26
5. Elliott Low Beach Road (92.4 -319) SE48 -202
Sitting Steinauer, Erisman, LaFleur, Champoux, Golding, Topham
Staff This certificate is from 1982.
Discussion (4:55) None
Motion Motion to Issue. (made by: Champoux) (seconded by: LaFleur)
Vote Carried unanimously
C. Orders of Condition (5:56)
1. Windy Point Trust — 5 Hulbert Avenue (29.2.3 -5) SE48 -2897
Sitting Steinauer, Erisman, LaFleur, Champoux, Golding, Topham
Staff None
Discussion Steinauer — This is straight forward.
Motion Motion to Issue as drafted. (made by: Champoux) (seconded by: LaFleur)
Vote Carried 5- 1 / /Erisman opposed
2. Five on a Dime — 8 Pilgrim Court (41- 217.3, 217.4 & Portion of 217) SE48 -2899
Sitting Steinauer, Erisman, LaFleur, Champoux, Golding, Topham
Staff Will modify Condition 20 per Mr. Champoux's request.
Discussion Champoux — Asked to have this conditioned to maintain the vegetation between the retaining wall and
the north line.
Steinauer — Condition 21: roof drainage is to be infiltrated.
Golding — Would like Condition 22 to include that irrigation and lawn maintenance will be held to BMP
standards.
Steinauer — That is a standard condition.
Motion Motion to Issue as amended. (made by: Golding) (seconded by: LaFleur)
Vote Carried unanimously
D. Extension Requests
1. Waters Edge N.T —16 Medouie Creek Road (20 -26) SE48 -2577
Sitting Steinauer, Erisman, LaFleur, Champoux, Golding, Topham
Staff None
Discussion (5:00) Arthur D. Gasbarro, Nantucket Engineering & Survey — Asking for three 1 -year extensions due to delays
from a long litigation period. Phragmites management is proceeding well; it was a very thick stand and is
now sporadic shoots. Monitoring reports were prepared for board review. Explained how the Phragmites
were /are being treated.
Erisman — Asked if it is possible for pictures of how the work is being done to be included in the
monitoring reports.
Motion Motion to Issue the three 1 -year extensions. (made by: Champoux) (seconded by: Topham)
Vote Carried unanimously
E. Monitoring Reports
1. Fargo Way R.T —10 Fargo Way (14 -15 & 61) SE48 -2647
2. APG /DRS — 80 & 84 Wauwinet Road (14 -89.2 & 11 -28) SE48 -2749
3. Waters Edge N.T —16 Medouie Creek Road (20 -26) SE48 -2577
F. Other Business
1. Approval of Minutes: 06/29/2016 — Approved by unanimous consent.
2. Enforcement Actions
a.None at this time.
3. Reports:
a. CPC, Golding
b. Mosquito Control Committee, Erisman
4. Commissioners Comment
a. Steinauer — The Hummock Pond Road Bikepath wedand replication area at Pumpkin Pond has knotweed growing on
the bank. The Town will be informed. Need a special herbicide application license to remove any invasive species
from a public right -of -way, which includes the bike path.
5. Administrator /Staff Reports
a. None
Motion to Adjourn: 5:17 p.m.
Submitted by:
Terry L. Norton
Page 3 of 3