HomeMy WebLinkAbout2015-5-13Minutes for flay 13 2015 adopted May 27
CONSERVATION COMMISSION
CONSERVATION COMMISSION
2 Bathing Beach Road
Nantucket, Massachusetts 02554
www.nantucket- ma.gov
Wednesday, May 13, 2015 4:00 P.M.
4 Fairgrounds Road, Training Room
Commissioners: Ernie Steinauer (Chair), Sarah Oktay (Vice- chair), Andrew Bennett,
Michael Glowacki, Ashlev Erisman, David LaFleur, Ben Champoux
Called to order at 4:13 p.m.
Staff in attendance: Jeff Carlson, Natural Resources Coordinator
Attending Members: Steinauer, Oktay, Bennett, Erisman, Champoux
Absent' embers: Glowacki, LaFleur
Late Arrivals: None
Earlier Departure: None
Town Counsel: George Pucci, Kopelman & Page P.C.
Agenda adopted by unanimous consent
*Matter has not been heard
I. PUBLIC MEETING
A. Public Comment — None
11. PUBLIC HEARING
A. Notice of Intent
1. SBPF — Baxter Road Area (Multiple) SE48 -2581 (Revetment project) (Cont 05/27/2015)
2. Duke 57, LLC — 55 Duke Road Lot 16 (56- 185.1) SE48 -2730 (Cont 05/27/2015)
3. APG/ DRS Realty Trust — 80 & 84 Wauwinet Road (11 -89.2, 28) SE48 -2749 (Cont 05/27/2015)
4. Four Saratoga, LLC — 14 Tennessee Avenue (60.1.2 -6) SE48 -2773 (Cont 05/27/2015)
5. Polpis Harbor, LLC — 250 Polpis Road (26 -27) SE48 -2779
Sitting Steinauer, Oktay, Bennett, Erisman, Champoux
Recused None
Documentation Supporting documents and plans.
Representative Mark Rits, Site Design Engineering — This was continued for outstanding concerns by the commission
and Bruce Perry, most especially unpermitted cutting under the previous owner. He has submitted a
revised plan detailing what has been done. They have removed the waiver for the tennis court fence in lieu
of a privet hedge inside the 50 -foot buffer. Indicated where infiltration systems will be and location of the
pipes draining into the wetlands. Showing the areas inside the 25 -foot buffer that were cut and will be
replanted with mixed species notated in their letter. Area A is west of the house extending into the
bordering vegetated wetlands and 25 -foot buffer will also be replanted.
Kevin Dale, Vaughan, Dale, Hunter and Beaudette, P.C.
Public Bruce Perry, Conservation Commission Consultant
Discussion (4:14) Erisman — Asked about the material to be used in the driveway.
Rits — Pervious shell or gravel. The existing drive is shifting east out of the 25 -foot buffer.
Oktay — Asked about the existing to new septic field, verifying what that is going to.
Rits — They will all be redirected. One is from a sump pump and one is from the downspouts. They will be
redirected into the infiltration system. They are now requesting only 2 waivers: to perform the revegetation
work in the bordering vegetated wetlands and the 25 -foot buffer and to replace the pier foundation for the
grand - fathered structure.
Erisman — Asked if there will be any new replanting or delineation of the 25 -foot line. Cutting is right up
to the line and it looks like work will push into that boundary.
Rits — They will demarcate everything during work with a silt fence. If the commission wishes, they will
place protruding wooden posts at regular intervals around the 25 -foot buffer.
Erisman — Also wants to ensure that any degradation that might happen on the 25 -foot buffer will be
replanted.
Staff — A permanent marker that can be conditioned in the Order of Conditions to protect the buffer zone.
Have used boulders, granite pillars, and wooden posts.
Champoux — Stated he would like that included in the Order of Conditions.
Rits — Brian Madden spoke with Bruce Perry about the delineation issues.
Champoux — Asked if Mr. Perry is comfortable with the reestablished lines.
Perry — Stated that he is comfortable with the delineation of lines as indicated on the plans. He has
submitted an amended inspection report for the file.
Page 1of4
Minutes for Mav 13, 2015, adopted May 27
Bennett — He is concerned about structure obstructing the view of Polpis Harbor. He would like to see the
Historic District Commission application plans.
Rits — He will get those plans for the commission.
Oktay — Asked if the applicant can take photos of the view shed from the Polpis Road Bike Path.
Rits — Reviewed the topography and how the view shed should not be affected. The only impact might be
the new house.
Erisman — Asked if all trees on the property are being removed all the way to the 25.
Rits — Most of the vegetation is shrubs. There is one big tree that he believes will remain. Asked for a
contumance.
Staff Reminded the commission to stick to the Performance Standard and the wetland scenic view is very hard
to tie to the standards.
Motion Continued to May 27 without objection.
Vote N/A
6. Nantucket Land Bank —158 Orange Street (55 -61.1) SE48- (Cont 5/27/2015)
7. * Squam Partners LLC — 89 Squam Road (13 -3) SE48 -2785
Sitting Steinauer, Oktay, Bennett, Erisman, Champoux
Discussion (429) None
Staff Missed this in the list at the beginning but it has been requested this be continued.
Motion Continued to May 27 without objection.
Vote N/A
8. *9 North Road LLC — 9 North Road (43- 131.1) SE48 -2786
Sitting Steinauer, Oktay, Bennett, Erisman, Champoux
Recused None
Documentation Supporting documents and plans.
Representative Mark Rits, Site Design Engineering — The original order was for a single - family residential development
part of a larger subdivided lot all within Massachusetts Natural Heritage habitat. This property is under
new ownership and the applicant has requested the Massachusetts Natural Heritage reconfigure the
building envelope to take advantage of the topography. They will be asking for a partial certification on
the original order. The resource areas are an off -site bordering vegetated wetlands and Policy 91.2.1
coastal bank. The property lies between the 50- and 100 -foot buffers. Work within the 100 -foot buffer
will be retaining walks, grading, and a pervious patio and a corner of the garage all within the 100 -foot
buffer. There is no work in the 50 -foot buffer and no waivers are requested. There is a small section of
FElL1 flood zone within the MNH do- not - disturb area; no work is proposed there. Septic is well outside
the 100 -foot buffer.
Public None
Discussion (4:30) Erisman — Asked if they will be adding fill.
Rits — Explained the grading plan. Fill material will be from the on -site. lost of the grading is outside
ConCom jurisdiction.
Staff Have everything needed to close.
Motion Motion to Close. (made by: Bennett) (seconded by: Oktay)
Vote Carried unanimously
9. *Michael Ryan 16 East Lincoln Avenue (42.4.1 -45) SE48 -
Sitting Steinauer, Oktay, Bennett, Erisman, Champoux
Recused None
Documentation Supporting documents and plans.
Representative None
Public None
Discussion (4:35) None
Staff This is to raise a dwelling straight and add steps to be flood -zone compliant. There is no grading. Waiting
for the DEP file number.
Motion Continued to May 27 without objection.
Vote N/A
B. Amended Orders of Conditions
1. Town of Nantucket /SBPF — 85 -105 Baxter Road *Thompson- 14 Fargo Way (14 -17) SE48 -2645 (Cont 5/27/2015)
111. PUBLIC MEETING
A. Request for Determination of Applicability
1. Wright- 40 Pocomo Road & Medouie Creek Road (14,19- 37,01) (Cont 5/27/2015)
Page 2 of 4
Minutes for May 13 2015 adopted -flay 27
B. Minor Modifications
1. Hulbert Ave Acquistion LLC- 43 Hulbert Avenue (29 -17) SE48 -2755
Sitting Steinauer, Oktay, Bennett, Erisman, Champoux
Recused None
Documentation Supporting documents and plans.
Representative None
Public None
Discussion (4:37) None
Staff As a result of the HDC review, the dwelling is being reduced in size and one porch eliminated thus
reducing its area inside the 50 -foot buffer. Recommends this be approved as a minor modification.
-lotion Motion to Approve. (made by: Oktay) (seconded by: Champoux)
Vote Carried unanimously
2. Butler — 84 Baxter Road (49 -37) SE48 -2756
Sitting Steinauer, Oktay, Bennett, Erisman, Champoux
Recused None
Documentation Supporting documents and plans.
Representative Paul Santos, Nantucket Surveyors — The minor modification is to incorporate the landscaping plan into
the NOI. There is a bordering vegetated wetland along west and north property lines. The proposal
includes removal of lawn area within the 25 -foot buffer and are also asking permission to remove a
Russian Olive between the lawn and wetland. It would be removed by hand.
Public None
Discussion (4:38) Oktay — Asked if the applicant is asking to use fertilizers.
Santos — No; just to replant part of the 25 -foot zone.
Champoux — Asked the size of the Russian Olive.
Santos — About 4 inches.
Champoux — That will require use of machinery, probably pulling out with a cable from a distance.
Staff Recommends this be approved as a minor modification.
Motion Motion to Approved. (made by: Bennett) (seconded by: Oktay)
Vote Carried unanimously
C. Certificates of Compliance (4:42)
1. Nantucket Land Bank- 72 Washington Street (42.2.3 -17) SE48 -2741
Sitting Steinauer, Oktay, Bennett, Erisman, Champoux
Staff This was to remove the dwelling and plant beach grass. There is the ongoing condition of a monitor
report.
Discussion None
Motion Motion to Issue with the on -going condition. (made by: Champoux) (seconded by: Oktay)
Vote Carried unanimously
2. Walsh- 22 Massasoit Bridge Road (58 -2) SE48 -964
Sitting Steinauer, Oktay, Bennett, Erisman, Champoux
Staff Was for construction of the building bisected by the 100 -foot buffer. Recommend issue with no on -going
conditions.
Discussion None
Motion Motion to Issue. (made by: Oktay) (seconded by: Champoux)
Vote Carried unanimously
3. 105 Eel Point Road Trust- 105 Eel Point Road (32 -5) SE48 -2546
Sitting Steinauer, Oktay, Bennett, Erisman, Champoux
Staff This was to move the structure away from an eroding coastal bank. This was moved to outside the 100 -
foot buffer. The only condition was to report the amount of nourishment used and plantings in the
vacated location. Recommends issue with on -going monitoring.
Discussion None
Motion Motion to Issue with on -going conditions. (made by: Oktay) (seconded by: Erisman)
Vote Carried unanimously
4. Welsh- 101 Eel Point Road (32- 7) SE48 -2572
Sitting Steinauer, Oktay, Bennett, Erisman, Champoux
Staff This was also a house move outside the bank. The on -going condition requirement is for photo
monitoring of the beach grass in the vacated location. Recommends issue with on -going monitoring.
Discussion None
Motion Motion to Issue with no -going conditions. (made by: Champoux) (seconded by: Oktay)
Vote Carried unanimously
Page 3 of 4
Minutes for Mav 13, 2015, adopted Mav 27
5. Jennings- 341 Madaket Road (60.2.4 -64.2) SE48 -1755
Sitting Steinauer, Oktay, Bennett, Erisman, Champoux
Staff This order was for abandonment an existing well and installation a new well and construction of a
pervious driveway. No on -going conditions and it is done in compliance. Recommend issue.
Discussion None
Motion Motion to Issue. (made by: Oktay) (seconded by: Bennett)
Vote Carried unanimously
6. Mitchell- 11 Medouie Creek Road (20 -30 & 37) SE48 -1812 (Reissue)
Sitting Steinauer, Oktay, Bennett, Erisman, Champoux
Staff The original certificate was misplaced. This is a reissue. It is in compliance.
Discussion None
Motion Motion to Reissue. (made by: Oktay) (seconded by: Bennett)
Vote Carried unanimously
D. Orders of Condition
1. 9 North Road LLC — 9 North Road (43- 131.1) SE48 -2786
Sitting Steinauer, Oktay, Bennett, Erisman, Champoux
Staff Did not add any conditions as this is a very straight - forward proposal.
Discussion (4:49) None
Motion Motion to Issue as drafted. (made by: Oktay) (seconded by: Champoux)
Vote Carried unanimously
2. Michael Ryan — 16 East Lincoln Avenue (42.4.1 -45) SE48 -
Sitting Steinauer, Oktay, Bennett, Erisman, Champoux
Staff As this is straight forward and only continued for the DEP number, he will draft a positive order.
Discussion Commissioners agree with a positive order.
Motion None
Vote N/A
E. Enforcement Actions — None
F. Other Business
1. Approval of Minutes: April 29, 2015 — Motion to Approve as amended. (made by: Champoux) (seconded by:
Bennett) Carried unanimously
2. Reports:
a. CPC, Erisman — nothing to report.
b. NP &EDC, Bennett — nothing to report.
c. Mosquito Control Committee, Oktay — nothing to report.
3. Commissioners Comment:
a. Oktay — As a future agenda item, suggested the board reconsider the ConCom application fees to be raised to meet
the amount of work staff is doing in regards to the increase in monitoring reports.
b. Oktay — The Worcester Polytechnical Institute has listed all the erosion control projects on the island. Suggested
the commissioners should visit those sites to ensure those are in compliance.
c. Steinauer — Out in Quidnet, there are a couple of sets of steps north of the access road. He does not remember
permitting those. Staff — Will look into it.
d. Steinauer — The Pumpkin Pond Replication looks good this year.
e. Oktay — An issue near the Galley Restaurant on a recently completed project seems to cut into the dunes. Staff —
He has looked into it and it is in compliance.
4. Administrator /Staff Reports:
a. Environmental presentations are scheduled for May 14, 2015 at 4 Fairgrounds Road Conference Room: 10:00 a.m.
the 2014 Town -wide Water Quality Report. 6 -7 p.m. UMass Boston Field Station Bathymetric Profile of the
Ocean.
G. Executive Session
1. Exemption 3: To Discuss Strategy with Respect to Potential Litigation Concerning the Appeal of Order of Conditions SE48 -
2610 issued to the Sconset Beach Preservation Fund and the Town of Nantucket, where an Open Meeting May have a
Detrimental Effect on the Litigation Position of the Conservation Commission.
Motion to go into Executive Session under Exemption 3. (made by: Oktay) (seconded by: Champoux)
Voice vote: Erisman — aye; Oktay — aye; Steinauer — aye; Champoux — aye; Bennett — aye.
Entered Executive Session at 5:05 p.m.
Exited Executive Session at 6:29 p.m.
Motion to Adjourn: 6:30 p.m.
Submitted by:
Terry L. Norton
Page 4 of 4