HomeMy WebLinkAbout2013-1-13Minutes for Jana 23 2013 adopted Mar . 13
pHTUCKF CONSERVATION COMMISSION
+3 �
2 Bathing Beach Road
Nantucket, Massachusetts 02554
www nantucket- ma.eov
yC�PoNATE���1 Wednesday, January 23, 2013 4:00 P.M.
2d Training Room, 4 Fairgrounds Road pp�(r� pp� pp
Commissioners: Ernie Steinauer (Chair), Sarah Oktay (Vice-chair), John Braginton - Smith, JetidtfE Yv4g,
Andrew Bennett, Ian Golding, Michael Glowacki 9nil Mao or om
Called to order at 4:00 p.m. NAATU g FIT TOWN CLERK
Staff in attendance: Jeff Carlson, Natural Resources Coordinator; Terry Norton, mu s aker
Attending Members: Oktay, Kerberg, Braginton- Smith, Bennett, Golding, Glowacki
Ian Golding remote participation.
Absent Members: Steinauer
Agenda adopted by unanimous consent
"Matter has not been he rd
L PUBLIC MEETING
A. Public Comment
None
II. PUBLIC HEARING
A. Notice of Intent
1. Sunset House LLC —15 Hallowell Lane (30 -10) SE48 -2508
Sitting Oktay, Karberg, Braginton- Smith, Bennett, Golding, Glowacki
Recused None
Documentation Supporting documents and plans.
Representative Arthur D. Gasbarro, Blackwell and Associates Inc — Request hold for end of public
hearing. ho_. ,,1 Redevelopment of existing residential site. Submitted revised plans
showing resource areas. Reduced landscaping and fill in 25 -foot buffer, no pump will
be required in the drainage system, propose a secondary drainage system with shorter
profile, will provide sub - surface storage of water. Catch basin will prevent run -off to
abutting property. Isolated land subject to flooding resource area is not shown on
plan set at Elevation 9. Some filling at Elevation 10 within the resource area; volume
calculated and create sub - surface void to hold displaced water outside 50 -foot buffer
zone for coastal dune and vegetated wetlands but within land subject to flooding
resource area Will create a beach -grass buffer zone. Reviewed changes in plans for
reducing landscaping and installation of new septic. Contend that the overall project
represents a net benefit. By connecting the roof leaders to this system, it reduces the
transport of any pollutants by surface flow, especially from current existing
conditions. Also, this system has the ability to provide infiltration from both the sides
and the bottom of the system. The bottom of the system will be very close to ground
water.
Response to abutter comments: Driveway will change moving away from Mr. Peter's
property and that will allow the water to flow into the catch basin. Can provide more
drainage. The septic footprint is changed and the system will be a SeptiTec® pre-
treat system with infiltrated chamber storage, willing to make changes as long as
qualify under Title 5.
Requested a continuance to 2/6.
Arthur Reade, Reade Gullicksen Hanley & Gifford LLP
Lisa Botticelli, Botticelli & Pohl
Page I o£]0
Minutes for Ianuary 23. 2013. adooted Mar. 13
Public
Sarah Alger, Sarah F. Alger P.C. for 13 Hallowell Lane
Paul Santos, Nantucket Surveyors for 13 Hallowell Lane — Reviewed Mr. Kim Peters
concerns which are centered on the isolated land subject to coastal flooding which
crosses the property line. Photos from October 30 & 31 submitted at the table.
Contends that the current proposal fills up to one foot, pulling the elevation 9 & 10
loosing that storage; grading is such that all the water, though coming into the basin,
has nowhere to go and pooling of water will continue. The location of the structure
drives the location of the septic; the approved septic is a standard infiltration system.
Kim Peters, 13 Hallowell Lane — Secondary structure is driving the raising of the
grade and creates the requirement for the stone retaining wall. It is also causing the
encroachment into the land subject to coastal flooding.
Discussion
Golding — On the letter with existing versus proposed conditions, the math doesn't
seem to add up; should be a loss of 1800 square feet (SF).
Gasbarro — Presently 2516 SF of the 25 -foot buffer are disturbed; in the proposed,
only 1700 SF will be disturbed.
Oktay — New proposal shows no change in the storm water volume.
Gasbarro — It shows a storage - capacity increase of 50 cubic feet of water.
Glowacki — Asked about land subject to coastal flooding at Elevation 9.
Gasbarro — That is based on personal observation of flooding at the site and
numerous occasions. The flagpole at elevation 10 is the bench mark for flooding and
water has never reached that point.
Bennett — Asked about the area increase of the main house.
Gasbarro — Explained the changes to the structure and proposed retaining wall.
Golding — Prior concerns expressed were about possible leakage into Reed Pond.
Asked if the commissioners is satisfied that this proposal resolved the concern.
Oktay — It looks like roof-water and storm -water runoff will be treated and will all
run underground.
Glowacki — Abutters concern is based on Regulation 304.B.2 & 6. Sure the applicant
will want to respond to the abutters' concerns.
Braginton -Smith — Most of the water of concern to Mr. Peters is coming from
Gosnold Road. There is a lot of clay soil so causes flooding along the roads.
Expressed the opinion that the biggest problem is from road runoff.
Oktay — Asked about the ability to create a gravel infiltration trench to help channel
runoff.
Bennett — If collecting runoff from the perc area and moving into a system on the
other side of a new grovel driveway; the perc area is not being reduced. The driveway
would have to be lower.
Staff
There is no set criteria for determination; it is based solely upon direct observation of
the presence or absence of flooding. The proposal is on track to meet standards for
isolated land subject to coastal flooding. A project like this typically requires
monitoring and oversight in dealing with this land subject to flooding. With the
second area of isolated land subject to coastal flooding on the east side, it should be
looked at as a watershed approach as the performance standard reads; also have to
respect the fact that the resource area has the protection of buffer zones as it relates to
the leach field.
Motion
Continued to 2/6 without objection.
Vote
N/A
Page 2 of 10
Minutes for January 23. 2013, adopted Mar. 13
�wocm�
2. JAWS Hummock Pond N.T. — 289 Hummock Pond Rd (83 -4) SE48 -2517
Sitting
Oktay, Braginton - Smith, Bennett, Golding, Glowacld
Recused
Karberg
Documentation
Supporting documents and plans.
Representative
Stan Humphries, Laummitic Environmental, LLC — Submitted a revised plan. No
longer proposing a 450 angle of fence, a standard zig -zag sand -drift fence, posts are
8 -inch round with 50/50 ratio of slats to openings. This is now a dune nourishment
project. This is a water dependent use so requires no waiver.
Public
Bruce Perry, Third -party Consultant Conservation Commission — Flagging looks
fine. Applicant described this as a dune restoration project; it is more of a bank
stabilization project as the dune has not existed in some time. With an erosion rate of
9 feet a year, the fence will be in the middle of the beach in a couple of years. Need
to address on -going mitigation.
Discussion
Golding — Asked if there is a failure criterion.
Oktay — Failure criterion was discussed in regards to a distance from the bank.
Braginton -Smith — Went with the 25 -foot rule.
Oktay — Need failure criteria language in the order. Asked if there was an exposure
rate above that
Humphries — Only discussed the set back from the bank. Willing to accept a
triggering mechanism.
Bennett — Okay with the 25 -foot role.
Braginton -Smith — Right now there is a lot of loss as far as what was high beach,
but okay with the 25 -foot rule. The bank won't erode as quickly as the beach.
Oktay — Suggest having a waiver on hand.
Staff
Looking strictly at a coastal bank and coastal beach resource areas then the barrier
beach line and the pond. It was discussed that before failure is declared, the applicant
would come back before the board to review what happened and decide the best
course of action from there. high -tide line in November it was 20 to 25 feet from
position of project; but that moves. The commission has the ability to grant a waiver
when one is not requested. Can require quarterly monitoring.
Motion
Motion to Close. (Bennett) seconded
Vote
Carried 5 -0
�m:a o91
3. Dunn — 74 Millbrook Road (57 -3) SE48 -2524
Sitting
Oktay, Braginton- Smith, Bennett, Golding, Glowacki
Recused
Karberg,
Documentation
Supporting documents and plans.
Representative
Arthur D. Gasbarro, Blackwell and Associates Inc
Public
None
Discussion
None
Staff
Septic upgrade, was waiting for Massachusetts Natural Heritage comments; but their
time has expired. Have everything needed to close.
Motion
Motion to Close. ( Braginton- Smith) seconded
Vote
Carried 5 -0
Page 3 of 10
Minutes for January 23. 2013, adopted Mar. 13
(W I, o)
4. * Nanmcket Land Bank — 27 North Cambridge Street (38 -24) SE48 -2527
Sitting
Oktay, Karberg, Braginton - Smith, Bennett, Golding, Glowacki
Recused
None
Documentation
Supporting documents and plans.
Representative
Bruce Perry, Nantucket Land Bank — A tight -tank was installed in 2004. Propose to
move structures off property, build a 10X20 deck with benches inside footprint of
house, maintain existing walking paths, and create, outside 100 -foot buffer, a
connecting driveway with neighboring lot. Net benefits include: reduction of amount
of lawn, remove invasive species and dead Japanese pines. Can place the deck
outside the 25 -foot buffer. Phmgmites can be removed by clip and drip as part of the
invasive species removal. The water side loop of the driveway will be abandoned.
Paths are sandy and will be maintained as such and trim back the rosa rugosa.
Request continuance.
Public
None
_
Discussion
Karberg — Asked what the plan was for reseeding where the houses were. Perry —
Fill and reseed t
o fill in and reduce lawn area. Will come back in spring with the landscape plan.
Oktay — Would prefer the deck be outside the 25 -foot buffer, but it is disturbed
ground
Staff
None
Motion
Continued to 2/6 without objection.
Vote
N/A
5. *Nantucket Land Bank — 21 Sesachacha Pond Road (21 -17) SE48 -2525
Sitting
Oktay, Karberg, Braginton- Smith, Bennett, Golding, Glowacki
Recused
None
Documentation
Supporting documents and plans.
Representative
Bruce Perry, Nantucket Land Bank — Split rail fence along property line, which
involves doing work within coastal bank and coastal beach due to encroachments by
abutter. All work will be done by hand. There will be an opening in the fence where
there is bare sand. The waiver request is for no reasonable alternative as there is no
way to be outside the resource area. Tried the no -build by surveying it and staking it;
it didn't work.
Public
None
Discussion
Golding — Sympathize with the Land Bank's dilemma, but would prefer not to see a
fence. Asked why once the abutter was informed a fence would be necessary.
Perry — Had the property surveyed and the survey stakes were removed; the abutter
continued to landscape Land Bank property. This abutter has not been responsive to
Land Bank requests to stay off its property.
Oktay — One section of split rail fence already exists in the 0- to 25 -foot buffer. It is
in the resource area.
Glowacki — The no -build alternative does not seem to meet the program for this
project.
Staff
This property is all resource area all the time. This requires a waiver. Clarifies the no-
build alternative requirement. Have everything needed to close.
Motion
Motion to Close. (Bennett) seconded
Vote
Carried Unanimously
Page 4 of 10
Minutes for January 23. 2013, adopted Mar. 13
(W 34 23)
6. `Nantucket Land Bank — 28, 30A, 30B Washington Street (42.3.2- 231,232,233) SE48 -2526
Sitting
Oktay, Karberg, Braginton- Smith, Bennett, Golding, Glowacki
Recused
None
Documentation
Supporting documents and plans.
Representative
Bruce Perry, Nantucket Land Bank — Presented background on the property. This
Notice of hs[ent is for removal of structures on lots 28 and 30B. Will move managed
areas outside of the resource areas and allow natural vegetation to grow back.
Request an annual dormant- season prating between the street and harbor no more
than waist high, and will maintain handicapped boardwalk going down to the beach.
Public
None
Discussion
Oktay — Asked for assurance that truck traffic should not impact resource area.
Perry — The work will be done from the road and existing parking areas.
Staff
All silt fencing most be installed; applicant is required to provide 72 -hour notice.
Have everything needed to close.
Motion
Motion to Close. (Bennett) seconded
Vote
Carried Unanimously
(oga;aa)
B. Amended Orders of Conditions
1. *Mertz —
8 Ames Ave (60.2.4 -56) SE48 -2548
Sitting
Oktay, Karberg, Bragimon- Smith, Bennett, Golding, Glowacki
Recused
None
Documentation
Supporting documents and plans.
Representative
Mike Connelly, Charles W. Hart & Associates Surveyors Inc. — Clarification of
foundation of previously approved addition. Due to the wind shear, the building
requires hold - downs.
Public
None
Discussion
Oktay — Expressed the belief that this is clearly a minor modification.
Staff
According to the minutes of the previous hearings, there was concern about the piles
that were there and the soil integrity. It is an amended because of the change in scope
from piles to a crawl space; so amended orders are clearer.
Motion
Motion to Approve. (Bennett) seconded
Vote
Carried Unanimously
(peon)
III. PUBLIC MEETING
A. Requests for Determination of Applicability
1. *Steamship Authority — Steamship Wharf (42.4.2 -13)
Sitting
Oktay, Karberg, Braginton - Smith, Bennett, Golding, Glowacki
Recused
None
Documentation
Supporting documents and plans.
Representative
None
Public
None
Discussion
None
Staff
Technically this is in the buffer zone; request is to replace rubber on bulkhead face
_
plates as well as the brackets. Recommend a Negative 2 & 3 to allow the work.
Motion
Motion to Approve. ( Glowacki) seconded
Vote
Carried Unanimously
Page 5 of 10
Minutes for January 23. 2013, adopted Mar. 13
tmsna>
2. *Nantucket Land Bank — 171 R Hummock pond Road (65 -1)
Sitting
Oktay, K irberg, Braginton -Smith, Bennett, Golding, Glowacki
Recused
None
Documentation
Supporting documents and plans.
Representative
None
Public
None
Discussion
None
Staff
Looking to remove a structure located more than 120 feet from resource area.
Recommend a Negative 4.
Motion
Motion to Approve. ( Glowacki) Seconded
Vote
Carried Unanimously
(f11:5' W1
B. Minor Modifications
1. *Hale —117
Madaket Road (40- 60.3 &56) SE48 -1970
Sitting
Oktay, Braginton -Smith, Bennett, Golding, Glowacki
Recused
Karberg
Documentation
Supporting documents and plans.
Representative
Paul Santos, Nantucket Surveyors — Looking to add 738 SF onto the cottage, the
porch and a small section of the addition would fall within the 100 -foot buffer.
Public
None
Discussion
None
Staff
Recommend approval as a minor modification.
Motion
Motion to Approve. ( Glowacki) seconded
Vote
Carried 5 -0
tm:y:wt
C. Certificates of Compliance
1. *Grey Lady Trust — 46 Meadowview Drive (56 -298) SE48 -2331
Sitting Oktay, Karberg, Braginton -Smith, Bennett, Golding, Glowacki
Recused None
Documentation Supporting documents and plans.
Representative None
Public None
Discussion None
Staff Septic within buffer; is constructed as approved and recommend issued.
Motion Motion to Issue. (Bennett) seconded
Vote Carried Unanimously
�ocs�eo�
2. *Verney — 25 Capaum Pond Road (40 -10) SE48 -2439
Sitting Oktay, Karberg, Braginton -Smith, Bennett, Golding, Glowacki
Recused None
Documentation Supporting documents and plans.
Representative None
Public None
Discussion None
Staff Small addition built as proposed; recommend issued.
Motion Motion to Issue. ( Glowacki) seconded
Vote Carried Unanimously
Page 6 of 10
Minutes for January 23. 2013. adopted Mar. 13
<olss sl
3. *Kielley —
26 Gosnold Road (30 -89) SE48 -943
Sitting
Oktay, Karberg, Braginton - Smith, Bennett, Golding, Glowacki
Recused
None
Documentation
Supporting documents and plans.
Representative
None
Public
None
Discussion
None
Staff
Septic system; recommend issue.
Motion
Motion to Issue. ( Glowacki) seconded
Vote
Carried Unanimously
ups o
4. *Hale —117
Madaket Road (40- 60.3 &56) SE48 -1914
Sitting
Oktay, Braginton - Smith, Bennett, Golding, Glowacki
Recused
Karberg
Documentation
Supporting documents and plans.
Representative
None
Public
None
Discussion
None
Staff
Permit for existing stone path; recommend issue.
Motion
Motion to Issue. (Bennett) seconded
Vote
Carried 5 -0
cal M SS1
5. *Thomewill — 48 Dukes Road (56 -246) SE48 -1094
Sitting
Oktay, Karberg, Braginton- Smith, Bennett, Golding, Glowacki
Recused
None
Documentation
Supporting documents and plans.
Representative
None
Public
None
Discussion
None
Staff
Construction of dwelling within 100 -foot buffer; all else in compliance. Recommend
issue.
Motion -
Motion to Issue. (Bennett) seconded
Vote
Carried Unanimously
(OL959)
D. Orders of Conditions (If the public hearing is closed — for discussion and/or issuance)
1. O'Brien —18
Medouie Creek Road (20 -27) SE48 -2513
Sitting
Oktay, Braginton - Smith, Bennett, Golding, Glowacki
Recused
Karberg
Documentation
Supporting documents and plans.
Representative
None
Public
None
Discussion
None
Staff
Included waiver for no adverse impact/no reasonable alternative. Added condition
that all materials are stored outside the 50 -foot set back from the coastal bank.
Motion
Motion to Issue. (Bennett) seconded
Vote
Carried 5 -0
Page 7 of 10
Minutes for January 23, 2013, adopted Mar. 13
(m.z�n)
2.Murray -23
Bank Street (73.1.3 -55) SE48 -2521
Sitting
Oktay, Karberg, Braginton -Smith, Bennett, Golding, Glowacki
Recused
None
Documentation
Supporting documents and plans.
Representative
None
Public
None
Discussion
None
Staff
Redevelopment on site, technically within 50 feet of bottom of local coastal bank;
reasonable alternative
granted waivers under no adverse impact/no reasonable alternative and on opposite
Motion to Approve. (Braginton -Smith) seconded
side of a previously altered public way. Add conditions about fertilizer /irrigation and
Carried 5- 0/Karberg abstain
that all materials are stored outside the 50 -foot set back from the coastal bank.
Motion
Motion to Issue. (Braginton -Smith) seconded
Vote
Carried Unanimously
3. Geschke Family N.T. — 78 Monomoy Road (43- 119 &311) SE48 -2523
Sitting
Oktay, Karberg, Braginton -Smith, Bennett, Golding, Glowacki
Recused
None
Documentation
Supporting documents and plans.
Representative
None
Public
None
Discussion
None
Staff
Small bumpout on coastal bank. Required waiver under no adverse impact/no
reasonable alternative
Motion
Motion to Approve. (Braginton -Smith) seconded
Vote
Carried 5- 0/Karberg abstain
4. Zecher Shimmo
Trust — 34 Shinano Pond Road (43 -124) SE48 -2522
Sitting
Oktay, Karberg, Braginton -Smith, Bennett, Golding, Glowacki
Recused
None
Documentation
Supporting documents and plans.
Representative
None
Public
None
Discussion
None
Staff
2 "a -floor addition and move path. Required waiver under no adverse impact/no
reasonable alternative
Motion
Motion to Issue. ( Glowacki) seconded
Vote
Carried 5- 0/Karberg abstain
�mum�
5. Dunn — 74 Millbrook Road (57 -3) SE48 -2524
Sitting
Oktay, Karberg, Braginton -Smith, Bennett, Golding, Glowacki
Recused
None
Documentation
Supporting documents and plans.
Representative
None
Public
None
Discussion
Typo in regards to "abandonment" to be corrected.
Staff
Abandonment of existing septic within resource area and running of leach field
outside of ConCorn jurisdiction. Waiver granted under net benefit for abandonment
of septic within the 25 -foot buffer.
Motion
Motion to Issue. ( Glowacki) seconded
Vote
Carried5- 0/Karberg abstain
Page 8 of 10
Minutes for Jan a.v 23 2013 adopted Mar . 13
6. *Nantucket Land Bank — 27 North Cambridge Street (38 -24) SE48 -2527
Continued 2/6
Staff— Had written an order but will revise to include new information.
(m m sas
7. * Nanmcket Land Bank — 21 Sesachacha Pond Road (21 -17) SE48 -2525
Sitting
Oktay, Karberg, Braginton - Smith, Bennett, Golding, Glowacki
Recused
None
Documentation
Supporting documents and plans.
Representative
Brace Perry, Nantucket Land Bank — Can provide more detailed drawings. Explained
how he had done created the maps.
Public
None
Discussion
Glowacki asked if a scale drawing was part of the application standards. Discussion
about how scale maps and drawings are provided. Golding asked how the
commission would be looking at this application if the abutter was submitting and
also asked who have this land to the Land Bank. Perry answered that it was given to
the Land Bank by the previous owner after the Land Bank acquired the next lot
abutting Mass Audubon property.
Staff
Installation of split rail fence down the coastal bank and a coastal beach. Required
waiver. Added conditions all work to be done by hand and fence will allow passage
of pedestrians along the coastal beach.
Motion
Motion to Issue. ( Glowacki) Seconded
Vote
Karberg - Aye
Braginton -Smith - Aye
Bennett - Aye
Golding - Nay
Glowacki — Aye
Oktay - Aye
(MU m)
8. *Nantucket Land Bank — 28, 30A, 30B Washington Street (42.3.2- 231,232,233) SE48 -2526
Sitting
Oktay, Karberg, Braginton- Smith, Bennett, Golding, Glowacki
Recused
None
Documentation
Supporting documents and plans.
Representative
None
Public
None
Discussion
None
Staff
Removal of structures, re- vegetation of lawn areas, continued vista pruning during
dormant season, and maintenance of existing boardwalk/deck in land subject to
coastal storm flooding buffer zone of coastal dune and coastal beach. Add conditions
about fertilizer /irrigation and provide a brief monitoring report using photos to show
how vegetation has grown back at beginning and end of growing season. The waiver
involved was net benefit for the reduction in structures and re- vegetation.
Motion
Motion to Issue. ( Glowacki) seconded
Vote
Carried Unanimously
Page 9 of 10
Minutes for January 23. 2013, adopted Mar. 13
( @'.13 =ae)
9. Discussion of other closed notice of intent public hearings —
JAWS Hummock Pond N.T. — 289 Hummock Pond Rd (83 -4) SE48 -2517
Sitting
Oktay, Karberg, Braginton - Smith, Bennett, Golding, Glowacki
Recused
None
Documentation
Supporting documents and plans.
Representative
None
Public
None
Discussion
Oktay pointed out that this site is very exposed.
Staff
Sand -drift fence similar to NOI issued for abutter; will pattern off that order of
conditions.
Motion
None
Vote
None
E. Other Business
1. Reports:
L Project Reports
ii. CPC — Glowacki: have a lot of money available for open space.
iii. NP &EDC — Bennett: nothing to report
iv. Mosquito Control Committee — Braginton- Smith: has not met
v. Coastal Management Plan — Oktay: next meeting 1/28 at 5 p.m.
vi. Other/Miscellaneous Reports - None
2. Commissioners Comment — None
3. Administrator /Staff Reports
L Staff Reports -None
ii. Minutes —None
F. Public Hearing
1. Town of Nantucket Wetlands Regulations Revisions — Staff explained that since this is a public
hearing, if a member misses more than one hearing, he /she cannot sit back on. With Mr.
Steinauer out, has been holding off opening the hearing to allow his participation. Glowacki
suggested holding a special meeting for this. Other commissioners agreed that was a good idea.
Motion to Hold. ( Glowacki) seconded. Carried Unanimously
Motion to Adjourn at 6:26 p.m.
Submitted by: