•��NTU�M`' NANTUCKET CONSERVATION COMMISSION
S
3� �V
r°
u
Minutes
RAI 9' Wednesday, January 18, 2012
4:00 P.M. on the 2 °d Floor of the Public Safety Facility 4 Fairgrounds Road
All or a portion of this meeting is being recorded.
If you plan to record this meeting yourself please check with the chairman of l�e lt�rrd before you begin
Called to order at 4:06 p.m. D' N
z
Staff in attendance: J. Carlson; Terry Norton, Minutes Taker
Attending Members: Ernst Steinauer (Chair), Sarah Oktay (Vice chair), Jennifer (Karb g, Jim Brescher,
Andrew Bennett, Ian Golding m $—'
Absent Members: John Braginton -Smith � CD rn
Agenda adopted by unanimous consent ° —__0 <
g Z3 rn
z p
*:Matter has not been heard n co
PUBLIC MEETING
r-
1. cn
Public Comment --a
Bill Hunter, for 93/99 Eel Point Road — Update. Staff. Massachusetts Department Environmental
Protection (MADEP) has gotten involved. Golding: want a full chronology of what happened and when.
II. PUBLIC HEARING
A. Notice of Intent
(4:13)
1. Kerr— 46 Wauwinet Road (14 -29) SE48 -2425
Sitting
Steinauer, Oktay, Karberg, Brescher, Bennett, Golding
Recused
None
Documentation
Supporting documents and plans, staff recommendations.
Representative
Peter Ogren, Hayes Engineering Inc. — Request continuance.
Mark Willett, Septi -Tech Sales and Service
Public
Bruce Perry, Third -party Consultant Conservation Commission
Cormac Collier, Nantucket Land Council
Discussion
Oktay — There have been times in the past this Commission has asked for a sign -off
on a septic system from the Board of Health. Is there any wildlife that has to be
considered in respect to the drainage pipe? Concerned about the Hydrology not
changing.
Staff — Request short narrative from representative clarifying the planting plan,
landscaping, fertilization, and irrigation.
Motion
Continued to February 1.
Vote
Without objection
(4:41)
2. UMASS- Boston— 180 Polpis Road (26 -1) SE48 -2430
Sitting
Steinauer, Brescher, Bennett, Golding
Recused
Oktay, Karberg
Documentation Supporting documents and plans, staff recommendations.
Representative Arthur D. Gasbarro, Blackwell and Associates Inc
Public None
Discussion Steinauer — Article 68 Committee is moving toward eliminating organic top -soil;
would be better to stockpile existing topsoil for this use.
Motion Motion to Close. (Bennett) seconded
Vote Carried Unanimously
Page 1 of 6
Minutes for January 18, 2012, adopted Feb. 29
(4:49)
3. Lipp & Berman — 251 Polpis Road (25 -24) SE48 -2436
Sitting Oktay (acting chair), Brescher, Bennett, Golding
Recused Steinauer, Karberg
Documentation Supporting documents and plans, staff recommendations.
Representative Arthur D. Gasbarro, Blackwell and Associates Inc
Public None
Discussion None
Motion Motion to Close. (Bennett) seconded
Vote Carried Unanimously
4. Sixteen Monomoy Road N.T. — 16 Monomoy Road (54 -52) SE48 -2435 (cont to 2/1)
5. Dunphy & Colella— 32 Tennessee Ave. & 9 I St. (60.1.2- 41 &32) SE48 -2438 (cont to 2/1)
(4:52)
6. Verney-25 Capaum Pond Road (40 -10) SE48 -2439
Sitting Oktay (acting chair), Brescher, Bennett, Golding
Recused Steinauer, Karberg
Documentation Supporting documents and plans, staff recommendations.
Representative None
Public None
Discussion None
Motion Motion to Close. (Bennett) seconded
Vote Carried Unanimously
7. Town and County of Nantucket Planning Office — Hummock Pond Road SE48 -2437 (cont to 2/1)
(4:54)
8. *Nantucket
Property Trust — 13 Hallowell Lane (30 -11) SE48 -
Sitting
Steinauer, Oktay, Karberg, Brescher, Bennett, Golding
Recused
None
Documentation
Supporting documents and plans, staff recommendations.
Representative
Arthur D. Gasbarro, Blackwell and Associates Inc. — request continuance
Public
None
Discussion
None
Motion
Continued to February 1
Vote
Without objection
(4:58)
9. *Nantucket
Lot 51 LLC — 90 Eel Point Road (Layout) (39 -2) SE48 -
Sitting
Steinauer, Oktay, Brescher, Bennett, Golding
Recused
Karberg,
Documentation
Supporting documents and plans, staff recommendations.
Representative
Mark Rits, Site Design Engineering — request continuance
Public
Kathryn Pochman, Executive Director Linda Loring Nature Foundation.
Cormac Collier, Nantucket Land Council
Ellen Harde, 83 Eel Point Road
Discussion
None
Motion
Continued to February 1
Vote
Without objection
Page 2 of 6
Minutes for January 125, 2012, adopted Feb. 29
(5:09)
10. *Brewster —
25 Walsh Street (29 -35) SE48 -
Sitting
Steinauer, Oktay, Karberg, Brescher, Bennett, Golding
Recused
None
Documentation
Supporting documents and plans, staff recommendations.
Representative
Mark Rits, Site Design Engineering — request continuance
Public
None
Discussion
Oktay — Question about material of pervious patio.
Motion
Continued to February 1
Vote
Without objection
(5:13)
11. *Nantucket
Hotel Holdings, LLC — 77 Easton Street (42.4.1 -35) SE48 -
Sitting
Steinauer, Oktay, Karberg, Brescher, Bennett, Golding
Recused None
Documentation Supporting documents and plans, staff recommendations.
Representative Mark Rits, Site Design Engineering — request continuance
Public Cormac Collier, Nantucket Land Council
Discussion Golding — Need to ensure the oil tank is above the 100 -year storm surge.
Discussion in regards to existing open order of conditions versus the new request.
Oktay — Want to know the capacity for storm runoff.
Steinauer — Need to establish removal protocol for invasive plants.
Motion Continued to February 1
Vote Without objection
12. Water's Edge N.T. — 16 Medouie Creek Road (20 -26) SE48 -2417 (coat to 2/15)
(5:39) Mary Wawro recording this portion of meeting.
13. `Sconset Beach Preservation Fund — 63 -67 & 79 -83 Baxter Road SE48 -2395
Sitting Steinauer, Oktay, Karberg, Brescher, Bennett, Golding
Recused None
Documentation Supporting documents and plans, staff recommendations.
Written comments from public.
Representative Barry Fogel, Attorney Keegan Werlin LLP
Brian Jones, Regional Director Ocean and Coastal Consultants
Lester Smith Jr., Environmental Scientist Epsilon Associates Inc.
Jamie Feeley
Public Cormac Collier, Nantucket Land Council — address regulatory points
Trey Ruthven, Applied Coastal
Peter Kaizer
D. Anne Atherton
Catherine Stover
Bruce Perry, Third -party Consultant Conservation Commission
Discussion Golding — Had requested a schedule of how many truck loads would deliver sand and
when. Part of this is predicated on delivering, and would like to see a record of past
performance.
Oktay — 1,844 trucks would be required to replenish all lots over 15 days; but that
could change if working against a storm. The goal is to mimic natural erosion. Land
Council letter expressing concerns that existing bank handling weight of crane. Want
to see citations supporting scientist's findings on the effect this has on the mole -crab
population.
Steinauer — How do you know you're falling behind in replenishing sand? Another
concern of this commission is not only sand at the project, but also the down -drift
sand which needs to be maintained.
Page 3 of 6
Minutes for January 125, 2012, adopted Feb. 29
(6:16)
'Sconset Beach
Bennett — Lets say we have failure, we've peppered the bank with screws, dug out the
Preservation
toe of the bank; how much of the bank actual would be lost if all this has to be pulled
Fund
out? (answer: Jamie — basically, the anchors would be trimmed down rather than
Discussion
removed.)
continued
Steinauer — Would like to know where the glacial outwash material begins and beach
sand ends at the base of the banks and that installation of the gabions are going won't
cut into that material.
Oktay — Believe the stability of the bluff will be permanently damaged when the
gabions are removed. Letter from D. Roggeveen brings up some good points that
need to be considered.
Steinauer — If predicting 6 feet of sea -level rise by the end of the century, this project
has a 40 -year life and in that time, rise in water level would higher than this proposal
projects. Could applying more sand address that issue? (answer: Fogel — No, the
project would meet failure sooner.)
Discussion about whether or not this meets the regulator definition of a water -
dependent project.
Discussion about how the included structures qualify for this protection under coastal
bank performance standards.
Discussion of overfill factor and type of material being replaced.
Motion
Continued to February 1
Vote
Without objection
B. Amended Orders of Conditions
*Huckleberry Friend Trust — 7 Huckleberry Lane (32 -60) SE48 -2376 (cont to 2/1)
III.PUBLIC MEETING
A. Minor Modifications
Great Harbor Yacht Club — Washington Street Extension SE48 -1665 (cont to 2/1)
B. Certificates of Compliance
(7:22)
1. *East Creek N.T. — 12 and 14 East Creek Road (55 -52 & 57) SE48 -2379
Sitting Steinauer, Oktay, Karberg, Brescher, Bennett, Golding
Recused None
Documentation Supporting documents and plans, staff recommendations.
Representative None
Public None
Discussion Staff — Waiting for further information
Motion Carried over to Feb. 1
Vote Carried
(7:22)
2. *Tate — 14 Pine Grove Road (67 -389) SE48 -2048
Sitting Steinauer, Oktay, Karberg, Brescher, Bennett, Golding
Recused None
Documentation Supporting documents and plans, staff recommendations.
Representative None
Public None
Discussion None
Motion Motion to Issue. ( Oktay) seconded
Vote Carried Unanimously
Page 4 of 6
Minutes for January 18, 2012, adopted Feb. 29
(8:09)
C. Orders of Conditions (If the public hearing is closed — for discussion and /or issuance)
(7:24)
Sitting
1. *Verney — 25 Capaum Pond Road (40 -10) SE48 -2439
Sitting
Oktay (acting chair), Brescher, Bennett, Golding
Recused
Steinauer, Karberg
Documentation
Supporting documents and plans, staff recommendations.
Representative
None
Public
None
Discussion
None
Motion
Motion to Issue as drafted. (Brescher) seconded
Vote
Carried Unanimously
(7:26)
2. *UMASS- Boston— 180 Polpis Road (26 -1) SE48 -2430
Sitting
Steinauer, Brescher, Bennett, Golding
Recused
Oktay, Karberg,
Documentation
Supporting documents and plans, staff recommendations.
Representative
Sarah Oktay
Public
None
Discussion
Add /reword conditions
Motion
Motion to Issue as amended. (Bennett) seconded
Vote
Carried Unanimously
(7:29)
3. *Cliffhanger
Trust — 83 Eel Point Road (32 -12) SE48 -2429
Sitting
Steinauer, Oktay, Karberg, Brescher, Bennett, Golding
Recused
None
Documentation
Supporting documents and plans, staff recommendations.
Representative
Arthur D. Gasbarro, Blackwell and Associates Inc
Mrs. Hardy
Public
None
Discussion
Conditions and clarification of delineation. Need create two separate orders.
Motion
Motion to Issue as amended under state order only. (Bennett) seconded
Motion to Issue order as shown on plan of record under local order with waiver and
finding. (Brescher) seconded.
Continue this project to Jan. 21 11 a.m. at 2 Bathing Beach Road.
Vote
Carried Unanimously
Not Carried 3 -3
No objections
(8:09)
4. *Lipp & Berman — 251 Polpis Road (25 -24) SE48 -2436
Sitting
Oktay (acting chair), Karberg, Brescher, Bennett, Golding
Recused
Steinauer
Documentation
Supporting documents and plans, staff recommendations.
Representative
None
Public
None
Discussion
Conditions
Motion
Motion to Issue. (Brescher) seconded
Vote
Carried Unanimously
5. Discussion of other closed notice of intent public hearing.
Page 5 of 6
Minutes for January 18, 2012, adopted Feb. 29
D. Enforcement Orders
(8:12)
87 Eel Point Road
Sitting Steinauer, Oktay, Karberg, Brescher, Bennett, Golding
Recused None
Documentation Supporting documents and plans, staff recommendations.
Representative Steve Cohen — Have proposal for February 15. Staff to provide representative with a
list of those contractors involved and commission wants to hear from.
Public None
Discussion MADEP has stepped in. Want a timeline of events.
Motion N/A
Vote N/A
(8:17)
26 Willard Street
Sitting Steinauer, Oktay, Karberg, Brescher, Bennett, Golding
Recused None
Documentation Supporting documents and plans, staff recommendations.
Representative None
Public None
Discussion Have filed for an amended order. Will be at February 1 meeting.
Motion N/A
Vote N/A
E. Other Business
1. Reports:
CPC — Brescher
NP &EDC — Bennett
Fertilizer Use Committee — Steinauer
Mosquito Control Committee — Oktay
2. Other /Miscellaneous Reports
Harbor Plan — Oktay
3. Commissioners Comment
Golding — Haven't seen order of condition for Eel Point Road
Oktay — Would like to schedule Regulation Review Hearing
Steinauer — Almanac Pond Road stream has a culvert. Don't remember the commission permitting
that. Who put it in?
Steinauer — Members of Invasive Specie Committee to meet with the new director DPW.
4. Administrator:
Staff Report — Office is moving to 2 Bathing Beach Road
Approval of Minutes None
Motion to Adjourn at 8:30 p.m.
Page 6 of 6