HomeMy WebLinkAboutJun 20 23 Town and County of Nantucket
ROADS AND RIGHT OF WAY COMMITTEE m Cys-
Posted Meeting of N .
June 20, 2023,at 4:00 pm
Held by Zoom Videoconferencing and Live in the 131 Pleasant Street Conference RooB't rY"".A"
FINAL AND APPROVED MINUTES
1_ Call to Order,Approval of the Agenda,Approval of Minutes,and Public Comments_
A- Chair Bill Grieder called the meeting to order at 4:1 7 pm;Zoom connection problems,
rectified by Charles Douglas,NCTV 18, delayed the meeting's beginning_ In attendance
were Committee Members Rick Atherton (left at 4:30 pm),Nelson"Snookie"Eldridge, Ed
Gillum (joined at 4:26 and left at 4:56 pm), Bill Grieder,Nat Lowell,Allen Reinhard,and
Lee Saperstein;there was a quorum at all times_ All participants were established by roll
call.
Absent: Ed Gillum, Rob Ranney, and Phil Smith.
The meeting was recorded and can be viewed on the Town's You Tube site (on Town's main
web page as"Watch Meetings Live", select"Playlists"then look for"Roads and Right of
Way„),
httos://www_voutu be_com/watch?v=r1J Gd 1 r8k0a8alist=PL49s Kopv7VAi AArzhvn U415D
TnhiVDj 18cindex 35_
B_ Approval of the Agenda_ The agenda was approved unanimously by acclamation_
C. Public Comments_
There was none.
D. Approval of the minutes of-the meeting of May 16,2023.
Allen Reinhard moved approval of the minutes of the meeting of May 16, 2023, Snoolcie
Eldridge seconded, and before the vote was taken, Rick Atherton recused himself because he
did not attend the May meeting_ The committee then voted unanimously by roll-call vote to
approve them_
2_Any Follow-Up to Public Access at 1.8,51-55 Nobadeer Ave Surfside_
Bill Grieder noted that the blockage of-the paper road alongside 18 Nobadeer Avenue was due
1
to construction;Nat Lowell observed that clean-up was underway.
The way between 51 and 55 Nobadeer Avenue is the pre-existing Hawthorne Street, according
to Lee Saperstein (see May 2023 minutes),that goes down to the shore. It does need to have a
footpath defined by cutting of the overgrowth in the street. Bill Grieder will talk with the DPW
about a maintenance schedule for all of the public footpaths; a separate work order will be
sought for Hawthorne Street. [Action: Bill Grieder to talk to DPW about maintenance of the
public footpaths.]
3. Review and Update Roads & ROW Ongoing Projects List.
Bill Grieder introduced this agenda item by saying that it was time to review the projects' list.
Discussions are presented in normal font and the previously distributed list is in italics.
Roads &ROW Ongoing Projects List as of 6/15/23
Public Way Monument Project: (Lee&Allen & Snookie)
Update file of existing monuments
• In progress (Update?)
Install remaining monuments at Sconset Footpath, Hulbert Ave., and other locations
• Need scheduling with DPW (DPW Update?)
Land Bank to install monuments at Westchester St. Ext. & Crooked Lane
• Allen Reinhard coordinating with Land Bank (Update?)
Bill Grieder asked Allen Reinhard about progress in re-establishing the West Chester Street
footpath alongside of Land Bank property,to which the reply was that it is a work in
progress. As noted above, Bill Grieder also suggested that the DPW be asked to create a
schedule for installing remaining monuments and to order new ones if needed.
Public Way Access Maintenance
See discussion above in Agenda Item 2.
• Create DPW work order to clear Hawthorne Street to beach
o (Between 51 and 55 Nobadeer Avenue) (DPW Update?)
• Reestablish access at 18 Nobadeer Avenue
o To be completed during homeowner construction project (Update?)
Sidewalk Projects: (Lee&Allen)
Wauwinet Road Bike Path
• In progress (Transportation
Planner Update?)
2
Cliff Road Coffin Park to bike path at Sherburne Turnpike
• Request sent to Selectboard to add to future sidewalk list (Transportation
Planner Update?)
Pleasant St. Gardner Perry Lane to Williams St.
• In progress (Transportation
Planner Update?)
Lovers Lane Bike path/road reconstruction
In progress (Transportation
Planner Update?)
Follow implementation of downtown sidewalk improvements
• Updates provided by DPW representative to RROW
(DP
W Update?)
Bike/Pedestrian connection from Surfside to Hummock Pond to
Madaket paths
• Land takings completed—needs Town Meeting funding
Wauwinet Road Bike Path
• Status (Transportation
Planner Update?)
Prospect Street sidewalk from Milk Street to Madaket bike path
• Unfeasible due to Quaker Cemetery footprint. (remove from
j
Bill Grieder suggested that the last item could be called"Milk Street to Caton Circle." Allen
Reinhard noted that the sidewalk should be extended to the corner of the Quaker Cemetery,
which is upper Vestal Street. Pedestrian and bicycle traffic then can go around the cemetery
and get to the Madaket bicycle path via Winn Street. This item should be edited but not
removed. Nat Lowell added that Winn Street is a major block to the smooth flow of traffic
around the cemetery and should have high priority for a fix.
Bill Grieder observed that the Wauwinet Road multi-use path is moving forward. There has
been, also,progress for funding rebuilding work on Lovers Lane. The project's expense is
greater than the sum budgeted and the Town is deliberating dividing the project into separate
pieces or seeking approval at Town Meeting for additional funds. He noted, also,that there
are five items needing an up-date from the Manager of Transportation Programs, which
suggests that he should be invited to an upcoming meeting of the committee.
Sidewalk work along Pleasant Street is in progress. Allen Reinhard reminded the committee
that it had done valuable work in its sidewalk survey and that the Town has budgeted one
million dollars per year for five years to restore downtown sidewalks. Nat Lowell suggested
that there are a lot of relatively simple things that can be done downtown to curbs, crossings,
etc.,that would be of great benefit.
Chapter 91 Monitor Project: (Lee,Rick,Phil)
3
GIS department head Nathan Porter making available
online (Update?)
Chapter 91 Licenses
• Requested ConCom to copy RROW on any received applications or notices
• Nantucket and Madaket Harbors Action Plan Update Committee Ident0
licenses along route for the Harbor Walk
o in progress (Update?)
Although not in attendance, Phil Smith is working with Nathan Porter to highlight beach
access points on a GIS layer. said Bill Grieder.
Nantucket Greenway and Trail System Project:(Allen,Lee)
Nantucket Central Railroad trail map of existing portions of route
• Locations identified at Easy Street, Washington Street extension, Naushop
development and Bayberry Commons to Surfside
Island Trail Map with all walking trails
• In progress " )'
Sconset Bluff Walk Subcommittee Review: (Allen,Ed,Nat)
• Reviewed sign verbiage and locations, maintenance, encroachments
(Update?)
• Attended Sign Advisory Council Meeting:Sconset Civic Association-
submitting signage Update application
Bill Grieder noted that the `Sconset Bluff Civic Association is preparing an edited version
of the bluff path sign for presentation to the Sign Advisory Board; our committee will
support the application.
4. Old,New or Other Business and Member Comments
Nat Lowell suggested, considering the spread sheet for potential road takings,that the
Committee should set up collaborations with the Bicycle and Pedestrian Advisory Committee
and the Traffic Safety Work Group,with a goal to speed up completion of projects.
Bill Grieder asked if anyone had looked carefully at the concession on the Francis Street
Beach. If not, he would go out and look to see if the terms of the lease are being honored.
He also reported that there is an application from 55 Union Street for a curb cut and off-street
parking.
5.Adjourn.
With the agenda completed,Nat Lowell moved,and Snookie Eldridge seconded,
4
adjournment. The vote in favor was unanimous.
Adjournment came at 5:33 pm.
Next meeting: 4:00 July 18,2023
5