AIRPORT COMMISSION MEETING
January 11,2022
The meeting was called to order at-5:00 pm by Chairman Arthur Gasbarro with the following
Commissioners present.,Jeanette Topham,Andrea Planzer and Phillip Marks III.
This meeting was,conducted remotely by video conference via Zoom app and posted after the
meeting on the Town of Nantucket YouTube Channel.
Airport employees,present were Thomas Rafter,Airport Manager,Noah Karberg,Assistant Airport
Manager,Katy Perales, Office Manager and Boyana Stoykova-Nelson,Administrative Assistant.
Also Present: Rich Lasdin,McFarland Johnson Inc
Mr. Gasbarro read the Town's virtual meeting statement.
Mr. Gasbarro announced the meeting was being audio and video recorded.
Mr. Gasbarro asked for comments on the agenda;:hearing none,the agenda was adopted.
Mr. Gasbarro asked for comments on the Draft Minutes dated 12/14/21. Mr. Rafter made a
clarification that the Mooney Association expressed interest to hold an event in the fall of 2023
opposed to 2022 as stated in the minutes. Mr. Gasbarro approved the change and asked for update
of the minutes.
Ms. Topham made a Motion to approve the draft minutes dated 12/14/21. Second by Ms.Planer.
and Passed unanimously by the following roll-call vote:
Ms. Topham—Aye
Mr. Gasbarro—Aye
Ms.Planzer—Aye
Mr.Marks—Aye
Ms.Topham made a Motion to ratify the 12/15/21 and the 1/5/22 Warrants.Second by Ms.Planzer
and Passed unanimously by the following roll-call vote:
Ms. Topham—Aye
Mr. Gasbarro—Aye
01/11/2022 Airport Commission Meeting . Page 1 of 8
Ms. Planer—Aye
Mr.Marks—Aye
Public Comment
None
011122-01 Public Hearing to Consider Proposed Revisions to Airport's Rates and Charges
At 5:07PM,Mr. Gasbarro opened the public hearing after reading an open statement.
Mr.Bouscaren joined the meeting at 5:10PM.
Mr. Karberg reviewed a presentation on the Rate and Charges Public Hearing regarding the
following:
• Stakeholder Consultations- Airline meeting was held on 11/12/21. Revised rate sheet
provided 12/10/21. Draft Final Pro Formas provided1/4/22.
• Terminal Cost Center Focus.-Support year-round services via waived fees.
• Aeronautical Fees-.Signatory Operators
• . Aeronautical Fees-Non-signatory Operators
• Assessment Change for Ticket Counters
• Assessment Change for Common Space
• Establish.Bag Fee
• Assessment Change for Ramp Fee
• Correction of Remain Over Night(RON)Fee
• Use, Service, and Administrative Fees
• Vehicle Parking
• Advertising
Public Comment:
Mr.Cestari,Southern Airways,updated the Commission on their current and planned future service
and explained that these changed to the rates and:charges would help support the expansion of these
services:
Ms. Trebincevic, Delta Airlines, made a request to change the way that the common space is
calculated. Ms. Trebincevic suggested that the office fee must be calculated based off the actual
assessment opposed to the minimum requirement of 250 square feet(sf)office space.
Mr. Seadler, American Airlines, agreed with the 20/80 combination for the common space and
made a request to change the minimum requirement of 250sf.for office space to be based on actual
assessment. Mr. Seadler requested more information about the Baggage Fee and how it was
determined.
Mr. Karberg explained that American Airlines and Delta Airlines have less than 250sf of office
space, but there's no more office space available. Mr. Karberg noted that an error was made, and
the counter square footage will be added to each of their minimums and the airlines will meet their
minimum assessment. Mr. Karberg stated that the issue was reconciled and will meet everyone's
01/11/2022 Airport Commission Meeting Page 2 of 8
satisfaction.Mr.Karberg explained that the Baggage fees are not subject for a five(5)year waiver.
Baggage fees will be assessed as they are in the Rates and Charges immediately. Mr. Karberg
continued by explaining that the Ramp fees will be assessed and staged in over five(5)years. Mr.
Karberg explained why certain fees are waived for Signatory Operators.
Commissioner and Airport Administrative Comments:
Mr. Gasbarro suggested to consider a change of the minimum standard requirement for
office/counter space.
• Mr. Rafter agreed that it would be fair to charge the actual assessment and modify the
minimum standards.
• After a brief discussion and by unanimous consent the Airport Commissioners will modify
the Draft Rates and Charges to strikethrough the minimum office/counter space charge.
Mr. Marks made a Motion to approve the Rates and Charges as proposed with the one change
discussed regarding the minimum'area size on the offices.;Second by Ms. Topham and Passed
unanimously by the following roll-call vote: • _y -
Ms.Topham—Aye
Mr. Gasbarro—Aye
Ms.Planer-Aye
Mr.Bouscaren-Aye
Mr.Marks;—Aye
011122-02 Terminal Airline Tenant Rates and Charges Revisions Ramp Fee:Phase-In Period
Policy :.
Mr. Seadler, American Airline, asked why the Airport would waive any of the rent fee charges if
there's such an acceleration of cost on the airfield side.
Mr. Karberg explained that the Signatory operators bring operating revenue:to the Airport year-
round. Mr. Karberg added that the Signatory..Airlines are operating very small and light aircrafts
which don't impact the'ramp the same way as bigger aircrafts.
Hearing no other comments Mr. Gasbarro closed the Public Hearing at 5:35 PM
Ms. Topham made a Motion to close the Public.Hearing. Second by Ms. Planzer and Passed
unanimously by the following roll-call vote:
Ms. Topham—Aye
Mr. Gasbarro—Aye
Ms.Planzer—Aye
Mr.Bouscaren-Aye
Mr.Marks—Aye
Pending Leases/Contracts — Mr. Rafter presented for approval the following,lease agreements
and contracts:
+ Massachusetts Electric Company dba National Grid—Landowner consent agreement
to allow Nantucket Energy,LLC to connect solar array on 25 Bunker Road.
+ The Hertz Corporation—Rental Car lease agreement in the amount of$ 77,825.00.
01/11/2022 Airport Commission Meeting Page 3 of 8
Five(5)year lease with one(1),five(5)year extension option.Plus$1500 Annual business
fee,10%gross sales, and Customer Facility Charges(CFO's):
+ Thrift Cars Inc. DBA Nantucket Windmill Auto Rental—Rental car Lease agreement
in the amount of$ 76,200.00. Five (5) year lease with one (1), five (5) year extension
option. Plus $1500 Annual business fee,10% gross sales, and CFC's.
+ Nantucket Auto Rental DBA Nantucket Island Rental Car- Rental Car Lease
agreement in the amount of$ 74,975.00. Five (5) year lease with one (1), five (5) year
extension option.Plus $1500 Annual business fee,10% gross,sales, and CFC's.
• TRAC Builders Inc. — Contract amendment for change order No.2 in the amount of
$236,332.48 for Fuel Farm Rehabilitation, Phase III. Electrical changes due to differing
field conditions.New contract amount, including amendment is$3,530,402.28.
+ Lawrence Lynch Corporation- Contract amendment for change order No: 2 in the
amount of$123,73 0.00 for Taxiway E project.New contract amount,including amendment
is $19,242,084.50.
Ms. Topham made a Motion to approve the pending leases-and contracts as presented, Second by
Mr.Marks and Passed unanimously-by the following roll-call vote:
Ms. Topham-Aye
Mr. Gasbarro—Aye
Ms. Planer.—Aye
Mr. Bouscaren=Aye
Mr.Marks:—Aye ;.
Pending Matters Mr.Rafter reported on:,
+ 091019-01 Capital Approval Process/Home Rule Petition—Airport Administration had a
meeting With Senator"Cyr's 'chief staff was held last Wednesday.'January 5, 2022. The
petition is still in the Senate..
+ 071420-03 Per- a Polyfluoroalkyl Substances (PFAS) Investigation Update- Mr. Karberg
gave an update on:the following:
a. Activity Report- 500`-samples were collected from 77`wells. Quarterly POET
monitoring samples have been received and are displayed in current period
columns in the activity report. All POETS continue to perform with effluent at No
Detect(ND)levels..Th e consultant team has-been monitoring a home on
Madaqueshain Valley Road(MVR)that was under but near 20 parts per trillion
(PPT)as well as located adjacent to-a home with a high reading. The most recent
sampling resulted in detection of over 20 PPT, so this home will be added to our
water service connection list. The residents had already been receiving bottled
water and will be receiving a curb stop,and the licensed site professional(LSP)
has already made contact regarding the update.
b. Task Order/Phase 2 Status- Soil data was received from the airport landside
fence boundary along Monohanset Road. This sampling was done to inform the.
water main crossing location. In 4 locations there are S-1 level exceedances for
PFAS in shallow soil. The immediate outcome advised by this data was to move
the water main crossing point up approximately 400 feet to the northeast on
Monohanset Road.A future outcome will be more specific soil delineation as
advised by the LSP within the Phase investigatory work: for now, our focus has
been on water main impacts and review of incoming groundwater data. -
c. PFAS Investigation Status Update-Consultant Presentation 2/8/22-The
consultant team is assembling received data in advance of a February presentation
01/-11/2022 Airport Commission Meeting Page 4 of 8
to the Commission. We expect to receive a draft of that presentation later this
month for review—it will be our first time seeing the data. We have the following
outreach plan for the Commission's meeting presentation:
• Notice to Town and Department of Environmental Protection
(DEP).
• Post information to website after meeting
• Allow public question period after Commissioner's questions
and comments.
d. Immediate Response Action (IRA)- Next IRA Status Report and next
Massachusetts Contingency Plan (MCP) report interval are due at the end of
February which will reflect presentation data.
Mr: Bouscaren asked if Mr.Karberg if had met in person with Mr.Peter McKay.Mr.Karberg
answered that he sent out an email but didn't get any respond back,but the offer is still available.
e. Water Service Project—No homes are substantially completed yet.McFarland
Johnson Inc. (Mg):and Robert)3. Our(RBO)arraigning for interior plumbing
work to occur.Two(2)homes on Nobadeer Way still require curb stop
installation. Wannacomet Water Company is.coordinating with Longfm LLC who
remain.busy. We have authorized a separate mobilization for RBO to complete the
interior plumbing for homes that are ready. Three(3)homes:off Skyline Drive are
anticipated to be finished in February. MJI is coordinating the water service
agreements.We will seek a change order to the RBO contract for private side
excavation,plumbing and site restoration for the home on Madaquesham valley
Road(MVR).
f. Water Main Project-Mr.Karberg shared'a figure of the Water Main Project. On
Skyline Drive the main is constructed, connected to Woodland,pressure tested,
and,Chlorine tested. Curb stops,are being installed currently:;The deteriorating
patch at the intersection Of-Woodland/Skyline to be repaired with concrete. On
MVR.them_ain from the corner of Evergreen Way and.Airport Road has been
constructed along Moriohanset Rd,onto airport property, and across the Runway
six(RW6)approach(APR).Anticipating daytime RW6/24 closures for trenching
in the glide slope critical area during the week of January 24,2022.The work
continues east and onto MVR.:We are currently re-noticing night work and.
emergency access procedure.
g. Public Communication—The website has been updated with project schedule
and look ahead,which can be found at www.ack-pfas.com. Communication with
residents continues.
Mr.Marks asked if we are seeing any of the migration that we were expecting to see in the water
flow. .
Mr.Karberg explained that based on the data provided,the migration is in consistent levels.
011122-03 Ratify MassDOT Grant Award-ALP 72-Reconstruct Taxiway E(State Portion:
Taxiway F and Aprons/Taxi lanes) -$344,237.60 Mr. Gasbarro reported the request of the
ratification for a MassDOT Grant Award AIP 72 for Taxiway E in the amount of$344,237.60.
Ms. Topham made a Motion to ratify the MassDOT Grant Award in the amount of$344,237.60.
Second by Ms.Planzer and Passed by the following roll call vote-
Mr.Bouscaren-Aye
01/11/2022 Airport Commission Meeting Page 5 of 8
Ms.Planzer-Aye
Mr.Marks-Aye
Ms. Topham-Aye
Mr. Gasbarro-Aye
011122-04 Ratify TSA Other Transactional Agreement"Baggage Belt Reimbursement"-
$155,606.60-Mr. Gasbarro reported the request of the ratification for a TSA Other Transactional
Agreement"Baggage Belt Reimbursement" in the amount of$155,606.60.
Mr.Bouscaren made a Motion to ratify the TSA Other Transactional Agreement"Baggage Belt
Reimbursement" in the amount of$155,606.60. Second by Ms.Planzer and Passed by the
following roll call vote-
Mr.Bouscaren-Aye
Ms. Planzer-Aye
Mr.Marks-Aye.
Ms. Topham-Aye
Mr. Gasbarro-Aye
011122-05 Ratify FAA Concession Rent Relief Airport Rescue Grant Agreement,AIP 79-
$115,509-Mr. Gasbarro reported the request of the ratification for a FAA Concession Rent
Relief Airport Rescue Grant Agreement in the amount of$115,509. •
Ms. Planzer made a Motion to ratify the FAA Concession Rent Relief Airport Rescue Grant
Agreement in the amount of$115509.Second by Mr Marks and Passed by the following Roll
call vote-
Mr.Bouscaren-Aye
Ms.Planzer-Aye
Mr.Marks-'Aye
Ms. Topham-Aye
Mr. Gasbarro-Aye
Finance: Mr.Rafter reported on:
+ 011122-06 Capital Committee Update—Meeting was held on Tuesday, 1/4/22
regarding the housing project. The model for the Crew Quarters.Project that MJI created
was presented to the committee and all question were answered.
+ On Wednesday 1/12/22,the adopted budged will be presented to the Select Board.
Manager's Report—Mr.Rafter reported:
Project Updates
+ Taxiway E- Change orders were discussed at the last meeting with the engineers. Still
anticipate a March 2022 completion.
+ Security Project Phase II-Contractor addressed gate issues.The subcontractor will finish the
doors in February 2022.
• Fuel Farm Rehabilitation- Work continues. The skids for the new Fuel Farm are due in
January. Still anticipate a February/March 2022 completion.
+ Runway 12-30 Decommissioning-The contractor from the Taxiway E project has expressed
interest in completing the work in the Spring.
+ Crew Quarters-RFQ for Owners Project Manager(OPM)has been posted for bids.
01/11/2022 Airport Commission Meeting Page 6 of 8
+ Hangar Development-Meeting was held with the contractor for Mr.Hagedorn's hangar.They
plan to begin construction next week. The hangar is anticipated to be completed by March
2022.
Exhibit A—Task order to clean up and identify a number of the parcels.
+ Water Main Project-Mr.Karberg shared an update on this project in the PFAS Investigation
Update earlier in the meeting.
RFP/IFB Bid Status—Mr.Rafter reported the procurements being worked on include:
+ Security System Maintenance Program-This Invitation for Bid(IFB)is being developed
that will result in a contract for the maintenance of the new security system.
+ Terminal Space Optimization- CHA was selected as the OPM. In the process of
negotiating the contract.
• HVAC Terminal Project-Working with town to discuss potential next steps.
• OPM Crew Quarters-Request for Qualifications (RFQ) is being posted for an OPM for
the Crew Quarters project and is due on January 25,2022.
+ Concession space in the-seasonal Hold room - Request for Proposal (RFP) is being
developed.
Operations—Mr.Rafter reported:
• Town of Nantucket is seeking two(2)additional Law enforcement officers for the Airport.
+ Last week was the first snow of the year. The Maintenance Department did great job
removing the snow.and'getting the airport open in timely manner.
Statistics—Mr:Rafter reviewed the November 2021 statistics:
+ Operations.are down 1.16%from November 2020; and up 20.49%o from last FYTD.
• Enplanements are up 33.30%from November 2020; and up'157.68%'from last FYTD.
+ Jet A Gallons are down 0.89%from November 2020; and-up 42.04%from last FYTD.
+ Jet A Gallons are up 33.69%from December;2020.
• AvGas Gallons are up 658%from November 2020;and up 17.09%o,from last FYTD.
• AvGas Gallons are-up 12.57%from December 2020.
+ Freight is down 1203%fromzNovember 2020;and up 18.79%o from:last FYTD.
+ 1 Noise Complaints Was:filed for November-2021 compared to 0 in November 2020.
Personnel Report-Mr.Rafter Reported:
+ Preston Harimon has accepted the Compliance.Manager position..
+ In process of filling open positions in the Maintenance and Operations Department.
Commissioners Comments
+ Mr. Gasbarro would like to know when the anticipated completion date of the Fuel Farm
Rehabilitation Project is. Mr. Rafter explained that the initial schedule was behind about
two (2) weeks because of the delivery delay of the skids. Anticipated completion is late
February/early March 2022.
+ Mr. Gasbarro attended the Conservation Commission meeting, and the consultants on
behalf of the Airport filed a Notice of Intent Application that is related to relocation of the
perimeter road and the fence near the coastal dune bank along Nobadeer beach. The
application is moving forward.
Public Comment
None
01/11/2022 Airport Commission Meeting Page 7 of 8
Having no further business for Open Session, Mr. Marks made a Motion to go into Executive
Session,under G.L. Chapter 30A,Section 21A,not to return to Open Session,to review Executive
Session Minutes as enumerated on the Agenda; Clause 3: To discuss strategy with respect to
collective bargaining, where the Chair has determined that an open session may have detrimental
effect on the bargaining position of the Airport Commission. Clause 3: To discuss strategy with
respect to the litigation regarding,Walsh,where the Chair has determined that an open session may
have detrimental effect on the litigating position of the Airport Commission.
Second by Ms. Topham and Passed unanimously,by the following roll-call vote:
Mr.Bouscaren-Aye
Ms.Planzer-Aye
Mr.Marks-Aye
Ms. Topham-Aye
Mr. Gasbarro-Aye
Meeting adjourned at 6:08 pm.
Respectfully submitted,
Boyana Stoykova-Nelson,Recorder
Master List of Documents Used -
1/11/22 Agenda including Exhibit 1(Handout)
12/14/21 Draft Minutes -
12/15/21 Warrant Signature Pages ...
1/5/22 Warrant Signature Pages
Rates and Charges Public Hearing:Presentation
Rates and Charges Redline Revision(handout)
Mr. Cestari's letter to Mr.Karberg(handout)
Terminal Airline Tenant Rates and.Charges revisions Ramp Fee Phase-In Period Policy
Massachusetts Electric Company, dba National Grid—Landowner Consent Agreement
The Hertz Corporation-Lease Agreement : -
Thrift Cars Inc.,dba Nantucket Windmill Auto-Lease agreement(handout)
Nantucket Auto Rental, dba Nantucket Island rental Car—Lease agreement
TRAC Builders Inc.—Contract Amendment
Lawrence Lynch Corp.—Contract Amendment
PFAS Investigation Status
Updated Watermain Installation Figure(handout)
MassDOT Grant Award-AIP 72-Reconstruct Taxiway E
TSA Other Transactional Agreement"Baggage Belt Reimbursement"
FAA Concession Rent Relief Airport Rescue Grant Agreement,AIP 79
November 2021 Monthly Statistical Report
01/11/2022 Airport Commission Meeting Page 8 of 8