HomeMy WebLinkAboutLandfill OM Inspection 2018.5.24Important:When completing this form on a computer, use only the Tab key to move your cursor –not the Return key. Instructions Use this form to record and report the results of a Third-Party Operation and Maintenance Inspection conducted pursuant to 310 CMR 19.018.Be sure to obtain the most recent version of this form.All applicable sections of the submitted form must be completed to be accepted by MassDEP. Pursuant to 310 CMR 19.018(8)(a), the third-party inspector and facility owner/operator must sign this Third-Party Inspection Report form and submit the completed report to the appropriate MassDEP regional office and one copy of each completed report to the board of health of the municipality in which the facility is located. In the event that this inspection report contains a recommendation for corrective action(s), the owner/operator shall also submit the information required by 310 CMR 19.018(8)(c)2. Forms and instructions are available online: Note:This form d oes notid entifyallofthe requ irements applic able to eac hsolid waste managementfacility;otherrequ irements and /orpolicies mayapplyto the operation,maintenance and monitoringforeac hfac ility. I.Facility Information Facility Type (check one): Transfer Station/Handling Facility C&D Waste Processor or C&D Waste Transfer Station Municipal Waste Combustor Active Landfill Closed Landfill Other:Specify Facility: Nantucket Landfill Facility Name Nantucket MA 02554 City/Town State ZIP Code (508)228-4283 172753 Telephone Number Regulated Object Account Number FMF Number Operator: Waste Options Nantucket, LLC Operator Name (Doing Business As/Company Name) (508)228-4283 nathanwidell@comcast.net Telephone Number Email Address 188 Madaket Road Mailing Address Nantucket MA 02554 City/Town State ZIP Code Permittee: Town of Nantucket/Waste Options Nantucket, LLC Permittee Name (Entity Identified on Facility Permit) 188 Madaket Road Mailing Address Nantucket MA 02554 City/Town State ZIP Code Responsible Official for the Facility: Nathan Widell, CFO/General Manager nathanwidell@comcast.net Responsible Official Name (Individual)Responsible Official Email Address Waste Options Nantucket, LLC (508)228-4283 Responsible Official Company Name Responsible Official Telephone Number Page 1 of 14 MassDEP Use Only Rec ’d Date: FM F#: RO #: Reviewer: C omments: Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management II.Third-Party Inspector Michael Quatromoni SITEC Environmental, Inc. Third-Party Inspector Name Company Name SW48-0000077 06/30/19 MassDEP Third-Party Inspector Identification Number MassDEP Third-Party Inspector Expiration Date (MM/DD/YYYY) (781)319-0100 mquatromoni@sitecenv.com Telephone Number Email Address 769 Plain Street, Unit C Mailing Address Marshfield MA 02050 City/Town State ZIP Code Construction and Demolition Waste (C&D Waste) Processing Facility or C&D Waste Transfer Station Only: Identify the qualified individual that conducted the observation of incoming waste loads and collection of samples of suspect asbestos- containing materials during the inspection [pursuant to 310 CMR 19.018(6)(f)].If the entire inspection was conducted by the third-party inspector listed above, then check the box and enter only the Asbestos Inspector Certification Number. Same as above.Provide Asbestos Certification Number !MA Dept. of Labor Standards Asbestos Inspector Certification Number Asbestos Inspector Name Company Name Telephone Number Email Address Mailing Address City/Town State ZIP Code III.Inspection Details A.FREQUENCY Indicate the scheduled inspection frequency for this facility as required by 310 CMR 19.018(6)(b), or a more frequent schedule set forth in the Facility Permit/Other Approval: Bi-Monthly Quarterly Semi-Annual Annual Biennial Other (include permit/approval type and date of issuance): B.DATE,TIME & PERSONNEL C.CONDITIONS Page 2 of 14 N NE Inspection Date (MM/DD/YYYY):05/24/2018 Inspection Start Time:10:00 AM PM Facility Representatives in Attendance During Inspection:JP Carron II, Facility Manager Air Temperature:A pproximately 60 degrees F.Wind Direction (direction from which the wind is blowing): NWWeather:Clear Dry Partly Cloudy Rain Cloudy Snow W SW Wind S E SEWind Speed:Calm Breeze Moderate Strong Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management IV. Pre-Inspection Preparation A.FACILITY-SPECIFIC O&M REQUIREMENTS During each third-party inspection, the third-party inspector shall examine and evaluate the facility’s solid waste activities, equipment, operations, practices,procedures, and records relevant to the type of third-party inspection being conducted in order to determine the facility’s compliance with all applicable requirements as set forth in 310 CMR 19.018(6)(a)1. B.SOLID WASTE PERMITS, PLANS, APPROVALS & ORDERS List all relevant solid waste permits,plans,approvals,orders or other enforcement actions issued to the facility by the Department that contain specific practices, procedures and other requirements still in effect for the operation, maintenance and monitoring or closure/post-closure of the facility.Where applicable,provide the plan or issue date for each item.For enforcement actions, include the document number,effective date, and status of implementation by the facility. Discussion: Permit Approval with Conditions, Authorization to Operate a Lined Landfill, Phase 2B Cell #1, October 28,2008. Operation & Maintenance Plan, Phase 2A/2B Expansion,Revision 3, September 8,2008 Page 3 of 14 Inspector Initials Therefore, pursuant to 310 CMR 19.018(6)(a)1, prior to conducting a third-party facility operation and maintenance inspection, the third-party inspector shall, without limitation, complete all of the following: Review and become familiar with the regulations set forth at 310 CMR 19.000 –M assachu setts S olid W aste Regu lations. Identify, review and become familiar with all solid waste permits, plans, approvals, and orders (or other enforcement documents issued to the facility by the Department), and the solid waste requirements applicable to the operation and maintenance of the facility. Relevant requirements may include, without limitation, specific practices and procedures for the operation, maintenance and monitoring of the facility, waste acceptance/storage limits, and other requirements related to the facility’s solid waste activities. Without limitation, these facility-specific requirements may be contained in the Facility Permit, Authorization to Construct, Authorization to Operate, Operation and Maintenance Plan, Closure/Post-Closure Plans and Approvals, Facility Modification Approvals, Beneficial Use Determinations, Administrative Consent Orders, and other determinations, authorizations or enforcement actions issued by the Department. I,Michael Quatromoni , have identified, reviewed and understand all of the aforementioned requirements !MQ that are applicable to this facility and the following are my observations and recommendations related tothe facility-specific requirements. Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management V. Performance Standards Examine and evaluate the facility’s solid waste activities, equipment, operations, practices,procedures and records relevant to the type of solid waste facility. Using the tables below, identify all areas evaluated by the inspector during the inspection by checking the box in the first column. Describe all deviations noted during the inspection in the third column.Provide recommendations for corrective action to return to compliance with the applicable performance standard in the fourth column. A.TRANSFER STATION, HANDLING FACILITY, OR MUNICIPAL WASTE COMBUSTOR (INCLUDING C&D FACILITY) Page 4 of 14 Facility Type Performance Standards Transfer Station/Handling Facility (Including C&D Facility) Complete Section A. If C&D Handling/ Processing Facility, then also complete Section B. Municipal Waste Combustor Complete Section A. Active Landfill Complete Sections C. and F. If active ash landfill, then also complete Section D. Closed Landfill Complete Sections E. and F. Evaluated Performance Standard Deviation(s) Comments/Observations and Recommended Corrective Action(s) 19.205(1) Storm Water Controls. 19.205(2) Equipment. 19.205(3) Weighing Facilities. 19.207(1) General.Discuss in Section VI.Discuss in Section VI. 19.207(2) Supervision of Operation. 19.207(3) Access to Facilities. 19.207(4) Security. 19.207(5) Posting of Handling Facility. 19.207(6) Unloading of Refuse. 19.207(7) Special Wastes. 19.207(8) Banned/Restricted Wastes. 19.207(9) Hazardous Waste. 19.207(10) Household Hazardous Waste and Waste Oil Collections. 19.207(11) Bulky Waste. 19.207(12) Liquid Wastes. Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management B.CONSTRUCTION AND DEMOLITION (C&D) WASTE PROCESSING FACILITY OR C&D WASTE TRANSFER STATION Page 5 of 14 Attach analytical reports. Evaluated Performance Standard Deviation(s) Comments/Observations and Recommended Corrective Action(s) 19.207(13) Bird Hazards. 19.207(14) Dust Control. 19.207(15) Vector Control. 19.207(16) Control of Wind-blown Litter. 19.207(17) Staffing. 19.207(18) Employee Facilities. 19.207(19) Accident Prevention/Safety. 19.207(20) Fire Protection. 19.207(21) Recycling Operations. 19.207(22) Records for Operational and Plan Execution. 19.207(23) Screening and/or Fencing. 19.207(24) Open Burning. 19.207(25) Inspections. 19.207(26) End-of-Life Mercury-added Products. None Evaluated Performance Standard Deviation(s) Comments/Observations and Recommended Corrective Action(s) 19.206(1) Enclosed Operations. 19.206(2) Storage. 19.206(3) Contact Water. Suspect Asbestos-Containing Material (ACM) Inspection and Management Protocol. Sample collection of suspect ACM from incoming loads.Discuss sample results: ! Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management C.ACTIVE LANDFILL Page 6 of 14 Evaluated Performance Standard Deviation(s)Comments/Observations and Recommended Corrective Action(s) 19.130(1) General.Discuss in Section VI.Discuss in Section VI. 19.130(2) Operator Supervision.None The Operations Manager is on-site daily. 19.130(3) Special Wastes.None There was no special waste observed at the Landfill during the inspection. 19.130(4) Banned/Restricted Wastes.None The Landfill only receives residual waste from the Co-Compost Facility. Inspections for waste ban items or other restricted materials are performed at the Co-Compost Facility. Banned/restricted waste is not placed in Landfill. 19.130(5) Hazardous Waste.None Hazardous waste is not accepted. There was none observed during the inspection. 19.130(6) Bulky Wastes.None There is no bulky waste disposal at the Landfill,Just baled residuals. 19.130(7) Liquid Wastes.None No liquid waste accepted or observed during inspection. 19.130(8) Solid Waste Handling.None Residual waste from the Co-Compost Facility is baled. Bales are positioned within the active landfill area in lifts using heavy equipment. 19.130(9) Bird Hazards.None No putrecible waste is being placed in Landfill that would attract birds. 19.130(10) Equipment and Shelter.None Ample equipment owned and operated by Waste Options on-site to perform operations. Equipment is maintanied on- site. 19.130(11) Staffing.None Adequate staff present to perform operations. 19.130(12) Employee Facilities.None Employee facilites are available within on- site buildings. 19.130(13) Accident Prevention/Safety.None Safety clothing such as high visibility vest are worn. 19.130(14) Spreading and Compacting of Solid Waste. None The Landfill is a bale-fill. The compacted bales are placed in lifts within the Landfill using heavy equipment. There has been no loose waste placed within the Landfill. 19.130(15) Cover Material.None Soil from the Phase 1 reclamation project is used for daily cover. Non-recyclable glass received at the MRF is also used as daily cover in accordance with MassDEP Policy along with posi-shell on the slopes. 19.130(16) Vector, Dust and Odor Control.None There is no putrecible waste disposed of within the Landfill. Vectors are not an issue. No dust issues observed or odors detected. 19.130(17)None Disposal operation is a bale-fill. No loose Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Page 7 of 14 Evaluated Performance Standard Deviation(s)Comments/Observations and Recommended Corrective Action(s) Litter Control.litter observed. 19.130(18) Top Slope and Side Slopes.None Bales of residual waste are neatly positioned within the Landfill. Bales are stepped inward on side slopes. 19.130(19) Storm Water Drainage.None Site stormwater runoff is directed to the on-site retention basin adjacent to the Landfill. Stormwater that comes in contact with waste or daily cover material is contained within the Landfill and is managed as leachate. 19.130(20) Erosion Control.None No erosion issues observed. Bales had been covered with daily cover soil. 19.130(21) Boundary/Elevation Markers.None The boundary of the active disposal area, Phase 2B, is clearly visible along the perimeter berm. A site benchmark is located nearby at the northerly side of Phase 2A. 19.130(22) Access Roads.None Access roads to the active Landfill are in good condition. 19.130(23) Security.None There are no security issues identified. The entrance has a locking gate and fencing is in place at select locations to restrict access when closed. 19.130(24) Posting of the Landfill.None Signs are ported at the site entrance. 19.130(25) Open Burning.None No open burning is conducted and no fires have been reported. 19.130(26) Fire Protection and Control.None Water for fire protection is available nearby. Stockpiles of soil are located adjacent to Phase 2B to extinguish a fire in the event one should occur. A water truck is also available on-site. 19.130(27) Convenience and Recycling Drop-off Areas at Landfills. NA The drop-off area is located at the MRF and is not associated with the Landfil operation. 19.130(28) Waste Oil Collections at Landfills. NA Waste oil is not collected at this Facility from off-site generators. Waste oil generated from heavy equipment maintenance is stored and periodically shipped off-site by licensed hauler. 19.130(29) Household Hazardous Waste Collections at Landfills. NA Household hazardous waste is not accepted at the facility. 19.130(30) Leachate Collection, Treatment and Disposal. None Leachate from the Phase 2B Landfill area is collected in 2 above ground tanks situated at the northerly end of Phase 2A. Leachate is transported to the Town of Nantucket's Surf-Side Wastewater Treatment Plant for disposal. Leachate transportation to the treatment plant is conducted by the Town. Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management D.ASH LANDFILL Page 8 of 14 Evaluated Performance Standard Deviation(s)Comments/Observations and Recommended Corrective Action(s) 19.130(31) Phase Completion of the Landfill. NA Active disposal operations are being conducted on the plateau of the Phase 2B Landfill. Additional disposal capacity is under construction for the Phase 3A Landfill area. 19.130(32) Disruption of Landfilled Areas.None Active mining within the Phase 1 Landfill is onging at the easterly side of the landfill. 19.130(33) Construction of Buildings.NA No buildings have been constructed on landfilled areas. 19.130(34) Records for Operational and Plan Execution. None Accurate records are maintained in the on-site office trailer. 19.130(35) Inspections.None Third party inspections will continue to be conducted. 19.130(36) Re-circulation of Leachate.NA Leachate is not recirculated. It is trucked off-site to the Town of Nantucket to the Surf-Side Waste Water Treatment Plant for disposal. 19.130(37) End-of-Life Mercury-added Products.NA Only residuals from the Co-Compost Facility go into the Landfill for disposal. Mercury added products are not an issue at this landfill. Evaluated Performance Standard Deviation(s)Comments/Observations and Recommended Corrective Action(s) 19.131(1) General.Discuss in Section VI.Discuss in Section VI. 19.131(2) Fugitive Emissions. 19.131(3) Ash Moisture Content. 19.131(4) Spreading/Compacting of Ash. 19.131(5) Vehicle Washdown / Wheelwash / Other Measures. Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management E.CLOSED LANDFILL Page 9 of 14 Evaluated Performance Standard Deviation(s)Comments/Observations and Recommended Corrective Action(s) 19.016 Post-closure Use. 19.142(1) General.Discuss in Section VI.Discuss in Section VI. 19.142(2) Post-closure Period. 19.142(3) Post-closure Period Waiver. 19.142(4) Post-closure Period Extension. 19.142(5) Post-closure Requirements. 19.142(6) Inspection Requirements. 19.142(7) Additional Measures. 19.142(8) Termination of the Post- Closure Period. 19.143(1) Applicability. 19.143(2) Submission of Post-closure Use Plans. 19.143(3) Criteria for Approval of Post- closure Use. 19.143(4) Post-closure Construction. Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management F.ADDITIONAL LANDFILL REQUIREMENTS Continue to Next Page ! Page 10 of 14 NO NO NO NO YES NO Evaluated Performance Standard Comments/Observations and Recommended Corrective Action(s) 19.132 Environmental Monitoring Requirements.Groundwater, surface water and landfill gas monitoring is conducted by the Town of Nantucket in accordance with the Environmental Monitorng Plan. Analytical results are submitted to the MassDEP by the Town.Is the monitoring of surface water, ground water, landfill gas and any other media as determined by the Department, including without limitation, soil and sediment, being conducted on the schedule established in the permit or as otherwise required by the Department? YES Are the analytical results of the environmental monitoring submitted to the Department within 60 days after the date of sample collection or as otherwise specified by the Department? YES 19.133 Maintenance of Environmental Control and Monitoring Systems. Environmental monitoring devices, groundwater monitoring wells and landfill gas probes, are maintained by the Town of Nantucket. These devices are inspected by the sampling team retained by the Town to ensure they are not damaged. There have been no damaged monitoring devices reported by the Town. Are the facility operations conducted in a manner which protects all environmental control systems as approved in the Operation and Maintenance plan and monitoring systems as approved in the Operation and Maintenance plan or permit? YES Is regular maintenance of all landfill environmental control systems performed as approved in the Operation and Maintenance plan or permit? YES Has the Department been notified of the existence and extent of damaged or destroyed environmental control systems, monitoring devices, or surface water sampling location markers in accordance with 310 CMR 19.133(1) (c) and/or 19.133(1)(e)? N/A (if no damage to report) Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management F.ADDITIONAL LANDFILL REQUIREMENTS –Continued Page 11 of 14 NO NO NO Evaluated Performance Standard Comments/Observations and Recommended Corrective Action(s) 19.121(4) Landfill Gas Recovery Operation and Maintenance Requirements. Waste Options does not operate an active landfill gas recovery system at this facility. Due to the nature of the waste buried, landfill gas generation is minimal. Landfill gas management is through passive ventilation.Is condensate generation kept to a minimum and condensate recirculation, if proposed, performed in accordance with the permit? YES NO Are the sampling and analysis of condensate conducted on the schedule established in the permit or as otherwise required by the Department? YES Are the analytical results of condensate monitoring reported to the Department as established in the permit or as otherwise required by the Department? YES Is an annual report on the operation of the landfill gas recovery facility submitted to the Department as specified in the permit? YES Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management VI.Inspection Observations A.FACILITY CONDITION AND OPERATIONS Examine and evaluate the facility condition and operations as observed during the inspection, including the following: Describe any evidence of the following conditions observed at the time of the inspection: •Unpermitted discharges to air,water, land or other natural resources of the Commonwealth; and •Dust, odors, litter, and/or other nuisance conditions. Document and discuss all deviations from any specific requirements for the facility that are not addressed in the previous section (S ec tion V.–P erformanc e S tand ard s ), including without limitation, the requirements set forth in the facility’s operation and maintenance plan,orders or other enforcement documents,and other solid waste permits,approvals,and authorizations issued to the facility by MassDEP. List the types and estimated quantities of all waste and materials stored at the facility at the time of the inspection. Provide a narrative that describes the overall status of the general condition, operation and performance of the facility as observed at the time of the inspection. aAttach photographs taken during the inspection that depict the general condition and operation of the facility.At a minimum, include photographs,as applicable,of the waste unloading (tipping)area,waste storage areas,recyclable material storage and,for transfer stations, the waste reloading activity. Discussion: There was no evidence of unpermitted discharges to air, water, land or other natural resources observed during the inspection nor were there dust, odor or litter nuisance conditions identified. There were no deviations from any approvals, plans or Consent Orders observed during the inspection. The Phase 2B Landfill is operated as a bale-fill for residuals from the on-site Co-Compost Facility.When bales are delivered to the Landfill for disposal, they are placed directly within the lined Landfill cell.There is no waste stored at the Landfill prior to disposal. There is little activity at the Landfill on a daily basis.Baled residuals are brought to the Landfill for disposal when a sufficient quantity has accumulated within the Co-Compost Facility building. The Phase 2B Landfill was in good condition at the time of inspection.Operations are in conformance with the ATO and the O&M Plan. There were no residuals being disposed of at the time of the inspection. The liner system associated with the Phase 3A Expansion is complete and construction is underway for the Phase 2B Berm Completion.Geosynthetic liner system materials are being installed. B.RECORD REVIEW Examine and evaluate the facility’s record-keeping.Without limitation, document the status of the facility’s compliance with, and any deviations from, the record-keeping required by 310 MCR 19.000; the facility’s operation and maintenance plan; orders or other enforcement documents issued to the facility;and other solid waste permits,approvals,determinations and authorizations issued to the facility by the Department, including the following: Discuss the evaluation of the Facility’s “daily log”such as, daily tonnage records. List and discuss any special incidents that have occurred since the previous inspection such as exceedances of the facility’s permitted waste acceptance limits, nature and outcome of complaints reported to the facility operator (including the identity of the complainant,if known),fires,emergencies,or other disruptions to the routine operation of the facility. Discussion: Records are maintained at the office including truck scale receipts for incoming and outgoing materials.Records are also maintained for the quantity of residual waste brought to Phase 2B for disposal.To the best of my knowledge,there have been no special incidents or complaints reported in the recent past. Page 12 of 14 Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management VII.Summary and Recommendations Pursuant to 310 CMR 19.018(6)(a)4., where a third-party inspector observes that the operation or maintenance of the facility deviates from the aforementioned applicable requirements,he or she shall document all such deviations and recommend corrective actions for the facility to take to return to compliance. A.INSPECTION RESULTS Based on the examinations and evaluations conducted in Sections V. and VI., please summarize the inspection results by checking one of the following determinations: No deviations from the applicable performance standards or additional requirements listed at 310 CMR 19.018(6) were identified during this inspection. If no deviations were identified during the inspection, check this box and proceed to Section VII.B. Deviations from the applicable performance standards or additional requirements listed at 310 CMR 19.018(6)were identified during this inspection and are discussed further in this report. If deviations were identified during the inspection, check this box and ensure that each deviation and the recommended corrective actions are discussed in the applicable section(s) below. B.STATUS OF PREVIOUS RECOMMENDATIONS FOR CORRECTIVE ACTION If a previous inspection report identified deviations with recommendations for corrective action, please describe the action(s) taken since the last inspection to return the facility to compliance with the applicable requirements. Discussion: None C.RECOMMENDATIONS FOR CORRECTIVE ACTION Based on the results of this inspection, please list all deviations noted during the inspection and provide recommendations for corrective action to return to compliance with the applicable requirement. Recommendations: None D.ADDITIONAL COMMENTS Comments: None VIII.Additional Information Checklist Attach the following additional information,as applicable, to complete the inspection report.* Attach photographs taken during the inspection that depict the general condition and operation of the facility, as required in Section VI.A. For C&D Waste facilities only, attach the analytical results, as required in Section V.B. *Note:P u rsu antto 310C M R 19.018(8),M assDEP mayrequ estadd itionalinformation. Continue to Certification Statement on Next Page ! Page 13 of 14