Loading...
HomeMy WebLinkAboutWoodard and Curran Monthly Update October 1, 2012_201401230917012295TOWN OF NANTUCKET, MASSACHUSETTS Monthly Update WOODARD & CURRAN 1 of 3 OCTOBER 1, 2012 Projects 223970 Madaket Wastewater Treatment Facility & Collection System Phase 1 - Preliminary Design Phase Progress Last Month: Continued under Madaket Amendment No. 1 assessing alternative routes and identification of construction challenges for each proposed route. Continued work with Madaket site surveys – Massachusetts Historical Commission (PAL). Reviewing scope and budget for botanist oversight as required by NHESP. This Month: Continue assessing alternative routes Continue Massachusetts Historical Commission site survey Surfside assessment to begin October 2012. Schedule Projected completion date – December 31, 2012 (Unchanged) Financial Phase 1 Budget - $348,630 Spent - $ 136,000 225139 CWMP Update Progress Last Month: Incorporating BOH records into GIS Working on HP MEP Met with Sewer Planning work group and developed schedule moving forward Finalized updated needs/study areas map Working to develop existing/build out flows in Town Sewer District Developing flows/loads in existing needs areas Finalized BOH ACO Town of Nantucket, Massachusetts Project Update October 1, 2012 WOODARD & CURRAN 2 of 3 This Month: Continue public outreach Finalize flows and loads from updated needs/study areas Finalize SMAST Water Quality contract to Town – Sesechacha Work with BOH to implement Septic ACO template Worked with Town’s Energy Consultant and NatGrid for NatGrid to continue evaluations for energy efficiencies. Working with Marine & Coastal Resources – Hummock Pond MEP Schedule Projected completion date – December 2013 Financial Budget - $571,000 Spent: $112,100 Town Action (s) Required: Develop mission statement with members of CWMP Sewer Planning Work Group, setup schedule and format for Group and Public meetings, develop list of CWMP topics for discussion Town to review and confirm maps of needs areas. 225140 Phase IIB Sewer Rehabilitation Project Progress Last Month: Prepared updated Probable Construction Cost Estimate for DPW and Wannacomet Water Company. Continued field investigations and survey for design Continue to coordinate with Wannacomet Water Company Continued preparation of draft specifications. Submitted Notice of Intent and attended Conservation Commission meeting and received Order of Conditions for project. Finalized Street and Sidewalk Committee meetings Submitted Project Notification form to Massachusetts Historical Commission Attended September 12, 2012 Board of Selectmen meeting Completed survey of Fair Street Submitted 30% plans and specifications to MADEP for review under the SRF program requirements. This Month: Attendance at October 15, 2012 Neighborhood Meeting Town of Nantucket, Massachusetts Project Update October 1, 2012 WOODARD & CURRAN 3 of 3 Schedule Projected completion date – December 2014 Bidding process to begin October 31, 2012 Financial Budget - $921,700 Spent - $128,900 Town Action (s) Required: Finalize memo summarizing Street and Sidewalk Committee meetings. 225140 Sheep’s Pond Road Support Progress Last Month: Finalized Scope of Work and received Notice to Proceed for support associated with Natural Heritage and Endangered Species permitting and survey. Began Botanical Review for project area. This Month: Continue and finalize Botanical Review for project area. Schedule Projected completion date – December 2012 Financial Budget - $7,000 Spent - $4,500 What to look for this month: Phase IIB survey work along Westminster Ave., Hussey St. and to continue. Additional Services Developed an approach to assist DPW Director with Surfside/Siasconset operations and plant facilities challenges and submitted proposal to the Town.