Loading...
HomeMy WebLinkAboutWoodard and Curran Monthly Update November 6, 2013_201401230917008701TOWN OF NANTUCKET, MASSACHUSETTS Monthly Update WOODARD & CURRAN 1 of 4 NOVEMBER 6, 2013 Projects 223970 Madaket Wastewater Treatment Facility & Collection System Phase 1 - Preliminary Design Phase Progress Last Month: Met with Town Appraisers Continued with Surfside Discharge Bed Reload Evaluation Revised flow and load projections to include the Miacomet needs area flow and loads and revised the Surfside WWTF Capacity Analysis This Month: Revise the Surfside WWTF Capacity Analysis Evaluate options for providing additional aeration capacity for future needs Request and evaluate additional process data to address Town’s concern with anoxic tank capacity at future conditions Schedule Projected completion date – December 31, 2013 Financial Phase 1 Budget - $348,630 Spent - $ 309,216 Town Action (s) Required: Work with assessor on FAA site Provide additional process data to be requested by Woodard & Curran 225139 CWMP Update Progress Last Month: Reviewed Hummock Pond MEP Draft – Modeling Scenarios Plan for SMAST Public Meeting to present results of Hummock Pond MEP Draft When Received SMAST Initiated Model Runs in Nantucket Harbor Town of Nantucket, Massachusetts Project Update November 6, 2013 WOODARD & CURRAN 2 of 4 Reviewed Draft Stormwater Plan for Nantucket Harbor Reviewed Draft Public Outreach Plan for Fall/Winter 2013 with DPW Director Continued with Report Compilation Responded to SPWG List of Questions This Month: Coordinate and participate in a site visit to meter equipment power usage as part of the Energy Efficiency Study. Tentatively scheduled for November 20 & 21 or December 4 & 5. Compile and Review Draft Report Sections Review of Draft Stormwater Plan for Nantucket Harbor MEP with DPW Director Schedule Projected completion date – December 2013 Financial Budget - $616,000 Spent: $ 381,920 Town Action (s) Required: None 226494 Jetties Support Update Progress Last Month: All Activities on Hold During Government Shutdown This Month: Prepare agenda for meeting with Town, SSA and Hyline to discuss construction scheduling in late October, early November 2013 Coordinate With ACOE on Design Schedule Schedule Projected Jetties Reconstruction Bid-Winter 2014 Projected Contractor Bid Award early May 2014. Financial Budget - $20,000 Spent: $ 18,614 Town Action (s) Required: None Town of Nantucket, Massachusetts Project Update November 6, 2013 WOODARD & CURRAN 3 of 4 224428 Miacomet Pond Watershed Study Progress Last Month: Internal Kick off meeting for project team Data Collection and Compilation This Month: Kick off meeting with Town Additional data collection and compilation Watershed delineation Field investigations Schedule Projected completion date – March 21, 2014 Financial Engineering Budget - $125,800 Spent - $1,279 Town Action (s) Required: Provide Woodard & Curran copies of relevant documents 225140 Phase IIB Sewer and Water Main Rehabilitation Project Progress Last Month: Worked to continue on Ash Lane through 10/7, and moved onto Academy Lane and Gay Street for sewer and water replacement during week of 10/14. Met with Steam Ship Authority held on 10/30/13 to coordinate truck deliveries and minimize conflicts during construction on Broad Street. Woodard & Curran to work with Steamship Authority to issue notices informing of upcoming construction. This Month: Sewer and water construction is ongoing on Academy Lane, and will move on to Westminster Lane. Water and sewer construction to begin on Fair Street week of 11/11/13. Schedule Projected completion date – October 2014 Financial Engineering Budget - $921,700 Spent - $660,529 Construction Bid - $3,504,911 (including change orders), Spent - $1,609,817 Town Action (s) Required: Work with Woodard & Curran to coordinate with local businesses and residents during construction Provide support as needed in field for utility identification Town of Nantucket, Massachusetts Project Update November 6, 2013 WOODARD & CURRAN 4 of 4 225839 Surfside WWTF Assessment and Upgrades Progress Last Month: Attended meeting with DPW Director and the Surfside WWTF Chief Operator to review the recommendations and probable costs for the Corrosion Control, Headworks Screen, Odor Control System and Vactor unloading area. This Month Revise screenings assessment to develop conceptual layout and cost for complete headworks replacement. Evaluate incorporating vactor dump station into headworks Provide Corrosion Control Study Report for comment Develop plan for additional operational assistance to pilot running the plant with one train of the advanced treatment system off-line. Schedule Projected completion date – December 2014 Financial Budget - $110,000 Spent -$ 81,100 Town Action (s) Required: None What to look for this month: Construction on Phase II B Water and Sewer Replacement on Westminster St. and Fair St.