HomeMy WebLinkAboutWoodard and Curran Monthly Update December 21, 2012_201401230916595263TOWN OF NANTUCKET, MASSACHUSETTS Monthly Update WOODARD & CURRAN 1 of 3 DECEMBER 21, 2012 Projects 223970 Madaket Wastewater Treatment Facility & Collection System Phase 1 - Preliminary Design Phase Progress Last Month: Met with GSA/Surveyor on-Island to facilitate layout FAA property bounds/needs Worked with Town Administration on FAA site purchase Record and complied process data from the WWTF Began hydraulic capacity analysis off WWTF Began treatment capacity analysis of WWTF Commence hydraulic and treatment capacity analysis This Month: Schedule Projected completion date – December 31, 2013 Financial Phase 1 Budget - $348,630 Spent - $ 155,775 Town Action (s) Required: Completion date amendment execution Draft 2013 ATM Warrant Article for FAA land acquistion 225139 CWMP Update Progress Last Month: Continued discussions with SMAST NLC & Applied Coastal for Hummock Pond MEP $50,000 Contract Last sampling completed week of December 17th Follow up on all WQ testing for Hummock & Sesechacha Ponds Continued discussions with Health Director on Fertilizer Management program Identified two duct discharge pipes to Nantucket Harbor Town of Nantucket, Massachusetts Project Update December 21, 2012 WOODARD & CURRAN 2 of 3 Review AECOM “stormwater” data, mapping & outfall locations Develop limited stormwater scope Discussions with Town Administration about Work Plan for Sewer Plan Work (SPW) group Developed Town & Siasconset Sewer District Parcels Connected Not Connected Working to QA/QC on developed existing/build out flows in Town Sewer District and throughout all Needs Areas Jetties follow up Attend 12/17 Special BOS Quarterly meeting with SPW Group This Month: Continue public outreach activities Finalize flows and loads from updated needs/study areas Continue working with Natural Resources – Hummock Pond MEP Work with Natural Resources, Marine & Coastal Resources and Division of Marine Fisheries on stormwater Work with SMAST on stormwater in MEP Finalize summary on landfill Review and evaluate summary on 2008 Sewer Act Incorporate sewer priority list provisions with 2008 Sewer Act Continue with CWMP Update report writing Continue coordination with Sewer Planning Work Group as directed by Administration Schedule Projected completion date – December 2013 Financial Budget - $571,000 Spent: $ 167,509 Town Action (s) Required: Continue to refine Sewer Planning Work Group “charge”, develop work plan and time line Encourage NLC and SMAST to consummate $50,000 Applied Coastal MEP Contract Town of Nantucket, Massachusetts Project Update December 21, 2012 WOODARD & CURRAN 3 of 3 225140 Phase IIB Sewer Rehabilitation Project Progress Last Month: Processed two Addenda prior to December 12th bid opening Attended the Bid Opening on December 12th Received 5 bids for project. Apparent Low Bidder identified as C.C. Construction Conducted reference review Prepared and Submitted “request to award” package to MassDEP on December 21st h This Month: . Monitor contractor DBE (MBE/WBE) package approval process Preparing 5 copies of contract for execution with the Town upon receipt of the Approval to Award from MassDEP Set up and hold internal Town pre-construction meetings Set up and hold pre-construction conference with contractor Town Departments, utilities and other stockholders Set up DBE resident representative protocols and start residency Meet with Town Staff to set up monthly drawdown/payment to vendors protocols/schedules Schedule Projected completion date – December 2014 Financial Budget - $921,700 Spent - $288,128 Town Action (s) Required: Execute C.C. Construction Contract What to look for this month: Site visit to Surfside WWTF for assessment of capacity bottlenecks. Completion of FAA Site Survey by GSA vendor MassDEP approval to award Phase IIB contract to C.C. Construction/execute contract Initiate Phase IIB construction paperwork, mobilization, full on-site presences Begin “close coordination” process among involved Town Departments