HomeMy WebLinkAboutCWMP Update to Board of Selectmen April 24, 2013_201401230916304949Board of Selectmen Town AdministrationWOODARD & CURRANPHASE IIB / CWMP UPDATE ‐ QUARTERLY UPDATEApril 24, 2013 Phase IIB – Downtown Sewer RehabProject Status–Bids Received On Wednesday, December 12, 2012–Total Of 5 Bids Received ‐ C.C. Construction, Inc. from S. Dennis, MA Low  Bidder–C.C. Construction Bid Price ‐ $3,494,320.87 for the Base Bid and Alternate  1 Work–Bid Price ‐ Well Within the Town’s Available Budget –Construction Start Mid‐January 2013 –End May 2014–Construction Shut‐downs – Contractor Responsible for Issues & Repairs• Daffodil Days –April 2012 & 2013• May 15 to October 2, 2013• Christmas Stroll – December 2012 Phase IIB – Downtown Sewer RehabSpring 2013 Update–Main Street• Sewer Complete – Cobbles Replaced This Season–Fair Street / North Water Street• Pipe Burst Complete –Road Patched For Summer and Resurfaced In  Fall–Hussey Street / Whalers Lane• Sewer and Water Complete ‐ Road Patched For Summer and  Resurfaced in Fall–Centre Street / India Street• Sewer Complete–Quince Street• Water Complete – Sewer Completed in Fall–Sea Street / Gay Street• Manhole to be Replaced Phase IIB – Downtown Sewer RehabFall 2013 Work Plan–Broad Street / Easy Street• Sewer, Water and Stormwater–South Street• Sewer and Stormwater–Academy Lane• Sewer and Water–Ash Lane / Ash Street / East Chestnut Street• Sewer  Phase IIB Site  Map Phase IIB – Downtown Sewer RehabNew Items–The Jetties• Source of Sea Water at WWTF• Significant Source of Inflow Identified –Old Brick Manholes• Clay Pipe Replaced With Plastic Pipe by Pipe Bursting• Manholes to be Replaced–Madison Alley• Damaged, Leaking Pipe Identified• Pipe Burst Successful –Avoided Major Impacts–Issues• Existing Utilities –Unforeseen Challenges• Field Conditions –Loss of Time and Need for Additional Resources• Record Information of Service Ties – Limited• Clay Soils Encountered–Budget• Within Expectations CWMP Update StatusProgress to Date–Delineated Updated Map of Needs / Study Areas• Coordinated Town‐wide Efforts–Board of Health• Review of Records 2004 to Present–Hummock Pond Estuary Study• Implementation & Schedule–Preliminary Summer / Winter Flow Estimates• All Study  / Needs Areas / Town Sewer District Build Out Study Area  ‐ Needs Area Update Map Town Sewer District UpdateTown Sewer District (TSD)– Utilized Town’s Sewer User Billing Records• Delineate Parcels Within TSD Connected• Delineate Parcels Within TSD NOT Connected• Breakdown Future Developable ParcelsResults– Users NOT Receiving Bills• Lost Revenue• Nitrogen Load Issues in Nantucket Harbor– Town Needs to Evaluate and Correct Billing Data• Relook at Build Out Flows / Correct MEP Nitrogen Load Town Sewer  District Map Flows and Loads Update2004 CWMPCWMP UpdateDesign Flows with 2nd  DwellingsAverage Daily  FlowNeed / Study AreaWinterSummerWinterSummerMadaket169,516293,00791,850158,800WarrensLanding27,49747,56218,50032,000HummockPondSouth38,20066,070HummockPondNorth56,73097,980Somerset63,139108,79451,63089,030Monomoy69,936120,55148,89084,550Shimmo57,10798,67535,94062,150Town Sewer District Build Out358,569612,704Total Flows700,3091,203,284 Capacity Analysis UpdateSurfside Wastewater Treatment Facility– Design & Groundwater Discharge Permit  ‐ 3.5MGD– On‐Going Due Diligence to Verify• Hydraulic Capacity• Biological Treatment Capacity• Groundwater Disposal Bed Capacity– Assess Need and Potential for WWTF Expansion• CWMP Study / Needs  Areas / Existing Flows ‐ Final Flows and Loads• Madaket / Warrens Landing Cross Island Alternative  CWMP Update ‐ On‐Going Work– Hummock Pond Estuary – Sesechacha Pond– Total Maximum Daily  Loads (TMDLs)• Nantucket Harbor• Polpis Harbor• Madaket Harbor• Long Pond– Board of Health Tasks– Stormwater– Alternatives Analysis– FAA Site– Town Sewer District– Island‐Wide Water  Quality Testing– Alternatives Discussion– Ocean Outfall Moving ForwardCWMP Update–Coordinate Efforts Through DPW–Continue with MassDEP Approved Scope of Work–Coordinate Efforts With SMAST•Sesechacha Pond Study•Hummock Pond Estuary Study•Additional Model Run Scenarios–Alternatives Evaluation–Stormwater Evaluation–Surfside WWTF Evaluation–Energy Initiative–Continue Public Outreach Required Town Actions•Town Sewer District Evaluation–Sewer Connection Policy–Local Regulation 69.00 ‐ Implement and Enforce•Financing (Future)–Appropriate Policies•Fertilizer Management–Education and Implementation•Septic ACO Program–Educational  and Implementation–Needs Areas Expansion•Stormwater Management–Prepare Master Plan•Public Outreach–Consensus Building QUESTIONS & ANSWERSWOODARD & CURRANPHASE IIB / CWMP UPDATE –QUARTERLY UPDATEApril 24, 2013