Loading...
HomeMy WebLinkAboutFire Station Proposal presentation to Selectmen April 24, 2017April 26, 2017Project UpdateNantucket Fire StationThe Vertex Companies, Inc.1 Ibid onAs a result of the bid in June of 2016, the Work Group was established to review the project program and process to date.  After review of the project to date and the decision to NOT change the existing design program, the Work Group charged the project team with two (2) tasks:1. Redesign the HVAC system from a geothermal system, connected to the existing Police Station, to a Variable Refrigerant Flow (VRF) system; and2.  Bid the project through Modular ProcurementThe Vertex Companies, Inc.Work Group2 IntroductionThe Vertex Companies, Inc.Bid results3Description Budget June ’16 March ’17Construction Budget$14,433,125 $15,707,000 $15,678,000Designer Fees $976,000 $976,000 $976,000OPM Fees $458,860 $458,860 $458,860Other Soft Costs (FFE, etc.) $440,140 $440,140 $440,140Soft Cost Contingency (2%) $37,500 $37,500 $37,500Const. Contingency (4.5%) $654,375$654,375$654,375Total Project Budget $17,000,000 $18,273,875 $18,244,875Less appropriation‐$17,000,000‐$17,000,000Plus paving & landscaping Included $750,000Plus add’l Design Fees Included$243,500Shortfall$1,273,875 $2,238,375 •Modular bid was received in March of 2017 ‐DellbrookJKS was the sole respondent•Project was overbudget•Town notified by the AG’s office that the project was protested•Discussions with the AG illustrated multiple concerns regarding delivery of a project of this scope via modular constructionThe Vertex Companies, Inc.Modular procurement4 The Vertex Companies, Inc.Next Steps5•Bid the project in Fall of 2017 or the Spring of 2018?•Costs still escalating at approximately 10% per year•International Building Code (IBC) will be changing in June 2017; six‐month grace period for projects in design or bidding•Spring of 2018 Bid will likely require additional redesign for compliance with new code The Vertex Companies, Inc.Next Steps6Schedule Item Fall 2017 Spring 2018 Prequalification   Place ad in the Central Register for Prequalification of FSBs and GCs 05/11/17 10/12/17 Ad runs in the Central Register, local paper and CommBuys 05/17/17 10/18/17 Prequalification responses due 06/07/17 11/08/17 Invitations to Bid are forwarded to prequalified firms 07/05/17 12/06/17 Bidding   Place ad in the Central Register for FSB and GC bids 08/03/17 01/04/18 Ad runs in the Central Register, local paper and CommBuys 08/09/17 01/10/18 Filed Sub Bids due 08/30/17 01/31/18 GC Bids due 09/20/17 02/21/18 DCAMM reference checks complete 10/11/17 03/14/18 Nantucket Town Meeting 10/17/17 03/24/18   The Vertex Companies, Inc.Cost trend7020000004000000600000080000001000000012000000140000001600000018000000ConstructionNantucket Fire Station20082015201620172008 – Fire estimate ‐$9,400,0002015 – Fire estimate ‐$14,433,1252016 –Bid results (conventional) ‐$15,707,0002017 –Bid results (modular) ‐$16,671,500