Loading...
HomeMy WebLinkAbout20131203-TON emerg auth request to ConCom_201404041209198477“PROJECT SITE VICINITY MAP:PREPARED BY:LOCATION MAP:BAXTER ROAD TEMPORARY STABILIZATIONHYBRID GEOTUBE APPLICATION NOI SUBMISSIONBAXTER ROADNANTUCKET, MASSACHUSETTSPREPARED FOR:TOWN OF NANTUCKETNANTUCKET, MASSACHUSETTSNOT TO SCALENOT TO SCALEOne Financial Plaza1350 Main Street, Suite 1012Springfield, Massachusetts 01103(413) 241-6920 Fax (413) 241-6911www.miloneandmacbroom.comLIST OF DRAWINGSSHEET NO.TITLE1TITLE SHEET2EXISTING CONDITIONS3GENERAL PLAN4TYPICAL CROSS SECTION5FLANKING DETAILDESIGNER:DATE:P.E. NO.:BY:MILONE & MACBROOM, INC.PROJECT SITEMilone & MacBroom, Inc. - 2013PROJECTSITEPROJECT SITEDECEMBER 3, 2013James MacbroomDecember 3, 2013430526CONSTRUCTION STAGING AREA7-11CROSS SECTIONS SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKEDNEBDEC. 3, 20132967-111" = 200'EXISTING CONDITIONS - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROAD TEMPORARY STABILIZATION HYBRIDGEOTUBE APPLICATION NOI SUBMISSION0'100'200'01/2"1"EXISTSHEET NO.2 OF 11 15+0016+0017+0018+0019+0020+0021+0022+0023+0024+0025+0026+0027+0028+0029+0030+0031+0032+0033+0034+0035+0036+0037+0038+0039+0040+0041+0042+0043+0044+0044+08.52SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKEDNEBDEC. 3, 20132967-111" = 200'GENERAL PLAN - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROAD TEMPORARY STABILIZATION HYBRIDGEOTUBE APPLICATION NOI SUBMISSIONGENSHEET NO.3 OF 110'100'200'01/2"1" SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKEDNEBDEC. 3, 20132967-11HOR: 1"=20'VERT: 1"=20'TYPICAL CROSS SECTION - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROAD TEMPORARY STABILIZATION HYBRIDGEOTUBE APPLICATION NOI SUBMISSION0'10'20'01/2"1"TYPSHEET NO.4 OF 11 SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKEDNEBDEC. 3, 20132967-11HOR: 1"=20'VERT: 1"=20'TYPICAL FLANKING DETAIL - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROAD TEMPORARY STABILIZATION HYBRIDGEOTUBE APPLICATION NOI SUBMISSION0'10'20'01/2"1"TYPSHEET NO.5 OF 1111/19/2013REVISED DETAIL 30+0031+0032+0033+0034+0035+00SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKEDNEBDEC. 3, 20132967-111" = 40'STAGING PLAN - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROAD TEMPORARY STABILIZATION HYBRIDGEOTUBE APPLICATION NOI SUBMISSIONSTAGINGSHEET NO.6 OF 110'20'40'01/2"1" 23+00-1001020304050607080-10010203040506070800.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0024+00-1001020304050607080-10010203040506070800.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0025+00-1001020304050607080-10010203040506070800.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.00SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKEDNEBDEC. 3, 2013HOR: 1"=40'VERT: 1"=40'CROSS SECTIONS - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROAD TEMPORARY STABILIZATION HYBRIDGEOTUBE APPLICATION NOI SUBMISSION0'20'40'01/2"1"PROJECT NO.2967-11X-SECTION7 OF 11SHEET NO. 26+00-1001020304050607080-10010203040506070800.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0027+00-1001020304050607080-10010203040506070800.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0028+00-1001020304050607080-10010203040506070800.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.00SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKEDNEBDEC. 3, 2013HOR: 1"=40'VERT: 1"=40'CROSS SECTIONS - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROAD TEMPORARY STABILIZATION HYBRIDGEOTUBE APPLICATION NOI SUBMISSION0'20'40'01/2"1"PROJECT NO.2967-11X-SECTION8 OF 11SHEET NO. 29+00-1001020304050607080-10010203040506070800.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0030+00-100102030405060708090-1001020304050607080900.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0031+00-100102030405060708090-1001020304050607080900.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.00SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKEDNEBDEC. 3, 2013HOR: 1"=40'VERT: 1"=40'CROSS SECTIONS - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROAD TEMPORARY STABILIZATION HYBRID GEOTUBE APPLICATION NOI SUBMISSION0'20'40'01/2"1"PROJECT NO.2967-11X-SECTION9 OF 11SHEET NO. 32+00-100102030405060708090-1001020304050607080900.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0033+00-100102030405060708090-1001020304050607080900.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0034+00-100102030405060708090-1001020304050607080900.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.00SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKEDNEBDEC. 3, 2013HOR: 1"=40'VERT: 1"=40'CROSS SECTIONS - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROAD TEMPORARY STABILIZATION HYBRIDGEOTUBE APPLICATION NOI SUBMISSION0'20'40'01/2"1"PROJECT NO.2967-11X-SECTION10 OF 11SHEET NO. 35+00-100102030405060708090100-1001020304050607080901000.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.00SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKEDNEBDEC. 3, 2013HOR: 1"=40'VERT: 1"=40'CROSS SECTIONS - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROAD TEMPORARY STABILIZATION HYBRIDGEOTUBE APPLICATION NOI SUBMISSION0'20'40'01/2"1"PROJECT NO.2967-11X-SECTION11 OF 11SHEET NO.