Loading...
HomeMy WebLinkAbout20130624-Kara memo to BOS re engineering scope final_201404071213439282 Town of Nantucket Department of Public Works MEMO 188 Madaket Rd., Nantucket, MA 02554 (508) 228-7244 Fax (508) 228-7289  To: Libby Gibson, Town Manager From: Kara Buzanoski, DPW Director Subject: Baxter Road engineering scope Date: 6/24/13 The following is the engineering services necessary for evaluation of the continuance of Baxter Road with regards to the ongoing coastal erosion of the Sconset Bluff: For keeping Baxter Road at its present location: 1) Evaluate present slope conditions and rate of erosion, including a land survey. 2) Evaluate and advise the Town of the possibility of stabilizing the slope to protect Baxter Road and utilities at its present location. 3) What are the slope stabilization options? 4) What are the permitting issues for each stabilizing option? 5) What are the costs of design, permitting and construction? 6) What is the timeline for design, permitting and construction? 7) Peer review and comment on coastal engineering proposal of Sconset Beach Preservation Fund, including related land survey, analysis of potential adverse effects, alternatives analysis, and mitigation measures. For moving Baxter Road and utilities to a stable location: 1) Where is the stable location? 2) Create a design for the roadway and utilities to continue service to the Baxter Road properties. 3) What takings are required? 4) What is the permitting required? 5) What is the cost of design, permitting and construction? 6) What is the timeline for design, permitting and construction?