Loading...
HomeMy WebLinkAbout3.3.18 Major Storm Report Baxter Road_Siasconset Bluff Stabilization Project Major Storm Report_reduced1    Major Post Storm Report Baxter Road and Siasconset Bluff Stabilization Project March 6, 2018 Storm Date: March 3, 2018 – Major Storm Post-Storm Inspection Date/Time: March 3 and 6, 2018 – The beach not accessible until 3/6/18. Inspector: Chris Humphrey Photographs: See below. Estimated Template loss: Using geometric calculations based on the dimensions of the exposed geotubes, it is estimated that approximately 2.0 cy/linear feet of sand was contributed from the structure during the storm (1950 LF x 2.0 cy = 3900 cy). Estimated Adjacent Bluff Loss: Approximately 3 feet north and south of the project. Estimated Beach Level in Front of the Seaward Geotextile Tube: Bottom of the first geotube (approximately +/- 1 MLW). Location(s) of Exposed Geotextile: The entire length of the second and third tier, the southern and northern returns and approximately 100 feet of the 4th tier were exposed. Need for Repair? None. Condition of Ends/ Observations of Flanking? None noted. Proposed Template Action (Re- grade and/or Replenish): Deliver sand to replenish and regrade.      2    Post Storm Photos 3‐4‐18      Top of Template Viewing South    Top of Template Viewing North      Exposed Third Tier Viewing South    Northern End     3        Surface Runoff Gully – North End    Clay Head and Northern Returns        Northern Returns      Midpoint Viewing South     4        Sand Delivery Area      Location of Southern Ramp          Southern Returns      Top of Template Viewing North     5        Southern End Viewing North    Area South of the Project      Area South of the Project  6    SBPF 3/6/18 Project Photos         Northern return     Clay Head viewing north        Northern return      Northern end viewing south  7        Northern return     Northern return        Clay head viewing south    Northern return and ramp    8        Area north of the Project    Area north of the project   9        Area north of the Project viewing south  Northern end viewing south         Scour apron      Scour apron  10        Midpoint viewing north    Midpoint viewing south      Exposed 4th Tier     11           Exposed 4th Tier     Southern end viewing north        Southern return     Southern return   12        Southern return     Southern return and ramp        Area below viewing area    Area south of the Project   13          Area south of the Project    Area south of the Project        Area south of the Project    Northern end viewing south