HomeMy WebLinkAboutSBPF Submittal 2014_3_19_201404011032256464BAXTER ROAD TEMPORARY STABILIZATION PROJECT NOTICE OF INTENT (DEP FILE NO. SE 048-2610) SUPPLEMENTAL INFORMATION FOR MARCH 19, 2014 HEARING March 14, 2014 1. Geotube Information A. Proposed Fourth Tier of Geotextile Material SPBF and TON request that the Commission approve a fourth tier of geotextile material to complete the existing system. The engineering criteria used to design the geotube project (such as water level heights, anticipated wave runup, scour, etc.) are set forth in the attached memo from Ocean and Coastal Consultants (OCC) dated December 6, 2013 and submitted to the Commission as part of the Emergency Certification application filed on December 17, 2013. These design criteria clearly demonstrate the need for protection of the coastal bank up to elevation 24.2 Mean Low Water (MLW). Standard geotube dimensions put the top elevation at +26 ft MLW As shown on the attached As-Built plan, the current 3-tier geotube system extends to elevation ~21 MLW and is not considered adequate for the coastal environment at Sconset. A fourth tier of protection is required to achieve the design elevation of +26 MLW. The recommended material for the fourth tier is geotextile tubes. Understanding that the Commission wanted to evaluate the use of biodegradable materials (coir and/or jute), OCC has further analyzed the use of jute or coir to form the upper (fourth) tier of protection. The analysis performed by OCC in the attached memo dated March 13, 2014 demonstrates that a fourth tier made out of coir and/or jute will be expected to fail during the design storm event, leaving the coastal bank vulnerable at the time when protection is most critically needed. Additionally, as further described in OCC’s memo, the required sacrificial sand volume of 22 cy/lf requires the use of a bulldozer and/or excavator perched on the top row of protection to spread the sand dumped over the top of the bank by the conveyor belts1. OCC’s analysis indicates that the use of jute and/or coir for the top layer risks not being able to withstand the equipment loading and shear stresses caused by the tracks operating on the jute and/or coir, potentially causing the biodegradable material to fail under the weight of the equipment as sand is moved to cover areas of the template exposed by wave action.. For all these reasons, OCC 1 Maintenance of the terraces requires the use of a much lighter skid steer; however, a skid steer is simply not adequate for the additional length and volume of the geotube project. Additional Information for March 19, 2014 Conservation Commission Meeting 1 does not recommend the use of jute and/or coir for the fourth tier of protection. Similarly, the use of jute and/or coir for the third tier of protection is even more certain to result in failure and will cause serious difficulties in sand delivery; therefore, the use of jute/coir for the third tier is not considered a feasible option. Experience with the terraces suggests that biodegradable materials (jute and/or coir) may require complete replacement 1-3 times each year. This will require more frequent use of equipment at the top and toe of the bluff for sand delivery. Likewise, any sand contribution volume provided by complete emptying of two 15- foot circumference biodegradable tubes would be minimal, on the order of approximately 1 cy/lf. Biodegradable materials are not recommended given their clear engineering and feasibility drawbacks, as well as their minimal sand contribution. Further, the state Department of Environmental Protection (DEP) approved an Emergency Certification request for the four geotube design (see attached cover letter and Order of Conditions). In its cover letter dated December 10, 2013, DEP states the following: “The Department also applied the criterion at 310 CMR 10.30(3), which provides that a coastal engineering structure ‘shall be permitted’ to protect homes constructed prior to 1978 from storm damage. This regulation creates an exception to the general rule that precludes the installation of hard armoring of coastal banks. Based on the facts presented in the Request, this exception applies to the homes identified in the area subject to the determination of an emergency…. “The Department concludes that the [four tube] design of the coastal structure proposed in the Request does not go farther than necessary to protect these homes and essential public infrastructure serving the homes. In making this determination, the Department considered the specific facts presented by the proponents, including, without limitation, the proximity of the homes and infrastructure to the edge of the coastal bank, the ability of the four Geotubes to withstand a significant storm event and the threat posed by successive storm events…. “The implementation of the nourishment plan will mitigate any potential difference in down drift impacts between the four Geotube design and the hybrid design approved in the Town's Certification.“ Additional Information for March 19, 2014 Conservation Commission Meeting 2 B. Proposed Returns for Geotube SBPF and TON request that the Commission approve the installation of returns at the ends of the system. The use of returns is critical to protect the geotube system from flanking and end scour over the long-term. SBPF proposes the use of 15-foot circumference geotextile tubes as shown on the attached plan, installed at shallow angle between the face of the seaward geotubes and the face of the unprotected bluff. Geotextile material is strongly preferred because it can better withstand the coastal conditions at Sconset than biodegradable material (as described under 1A). C. Revised Location and Length of Geotubes SBPF and TON are informing the Commission of the reduction in length of the installed system. The Emergency Certification approved a length of just under 900 feet long from 91- 105 Baxter Road. The as-built geotube structure is approximately 852 feet long2 from 87-105 Baxter Road. The presence of the clay head at 105 Baxter Road dictated that the geotube structure should not be installed farther to the north (or else excavation into the bluff would have been required), so the installation was shifted slightly to the south. The multiple geotubes installed along the same tier also overlap one another slightly at each end, leading to a slight reduction in overall length (to 852 feet) from the permitted dimension of just under 900 feet . Each return is approximately 21-feet long (as shown on the attached plan) . Once the returns are installed, the total installed length will be approximately 900 feet. The project does not intend to proceed farther north than currently built, due to the presence of the clay head that would require excavation into the coastal bank. Similarly, the project does not intend to proceed farther south. Therefore, the final project length will be less than the 1500-feet originally proposed. D. Construction Information SPBF and TON are providing additional details on construction. o Sand Delivery. Sand delivery occurred at the delivery locations at 87 Baxter Road and 99/101 Baxter Road. These two locations will continue to be used for ongoing sand cover maintenance. o Geotube Fill Port Closure. As detailed in the letter from SBPF dated February 12, 2014, the use of a small amount of concrete was required to seal the fill ports in the geotubes. The installer has confirmed via email of February 12, 2 The as-built plan shows that the first and second geotubes are 852± feet long. The third (upper) geotube is 835± feet long. Additional Information for March 19, 2014 Conservation Commission Meeting 3 2014 (previously submitted to the Commission) that this approach is standard procedure. Approximately one-third or less of a bag of concrete was used at each fill port. The size has been compared to a deflated soccer ball. o US Army Corps of Engineers (USACE) Jurisdiction. Concern has been expressed about whether work was carried out below the High Tide Line. SBPF submitted information to the USACE at the end of December 2013 relating to the concern. Subsequent to the letter issued by the USACE in February 2013, SBPF again engaged with the USACE concerning its written inquiry of possible work below the High Tide Line. As indicated in the exchange with the USACE, the HTL was staked on the beach at the beginning of construction. The construction crew was aware of the HTL location on the beach and made every effort to stay landward of that line. The USACE informed SBPF that no further action is needed or planned and that no Federal order or violation notice has been issued or is planned. As we understand it, the USACE considers the matter of the geotube construction to be closed. However, to be safe, SBPF has provided the USACE with details on how future maintenance and sacrificial sand will be done to make sure that the USACE does not have any concerns with those future actions. Attached please find the original December 2013 update to the USACE regarding the geotube installation, which they acknowledge that they received and then misplaced, contributing to the inquiry, as well as Epsilon’s February 26, 2014 summation letter after the later discussions. 2. Stormwater Drainage SBPF requests that the Commission permit the installation of a stormwater drain along 91 Baxter Road. Surface water runoff at 91 Baxter Road was contributing to significant erosion of the bank face. . The advising geotechnical engineer, Mark Haley of Haley & Aldrich, a well-respected geotechnical engineering firm with substantial experience on the Sconset Bluff, suggested that a subsurface drainage system be installed to direct the surface water runoff to the toe of the bank, rather than allowing it to break out on the bank face and cause additional erosion. A memo from Mark Haley dated March 12, 2014 describing his recommendations is attached. The subsurface drain was installed at 91 Baxter Road, parallel to and approximately 10 feet seaward of the roadway, for a distance of approximately 41 feet. The subsurface drain consists of an 18 inch deep x 18 inch wide trough that is lined with filter fabric and holds a 4” diameter corrugated pipe. The trough is backfilled with ¾ inch gravel. The subsurface drain collects stormwater runoff and directs it to another 4” diameter PVC pipe that runs down the face of the bank and terminates at the toe of the bluff, in a gravel trough placed in the sand template behind the Additional Information for March 19, 2014 Conservation Commission Meeting 4 geotubes. No excavation into the bank or beach occurred to install the PVC pipe that runs down the face of the bank; this pipe was placed within sand added to the bank face or the sand template on the geotubes. Although the pipe was installed because of construction timing, it was understood to require approval from the Commission before it was completed. The pipe was never connected and is not functioning. SBPF is requesting approval for the subsurface drain. 3. Bluff Protection through Re-vegetation SBPF and TON request approval to vegetate the upper bank, including smoothing or dressing the bank face to create an acceptable planting bed and using an erosion control fabric or biodegradable netting. The upper portion of ‘Sconset bluff (above the geotube installation at 87-105 Baxter Road) exhibits evidence of rill erosion from rainfall and stormwater runoff from the top of the coastal bank. The attached Photographs 1-4 show the development of rivulets and small gullies in the bank face. While the geotubes have served to protect the toe of the coastal bank from waves and storm surges, erosion of the upper bank due to runoff over the bank surface and slumping due to gravity mass failure will likely continue unless additional measures are undertaken to protect this bank area. See attached memo from Mark Haley dated March 12, 2014, on the need for vegetation of the bank face. It is critical to address this upper bank erosion within the project area, as the loss of even a few feet of bank leaves Baxter Road potentially vulnerable to closure. As was previously submitted to the Commission, Mark Haley recommends a minimum distance of 25-feet be maintained between the edge of pavement and top of the bluff. When the top of bluff is within 25 feet of the pavement edge, a detailed assessment should be completed by a geotechnical engineer and the possibility of the road being closed should be carefully considered. Field measurements and aerial surveys performed in summer 2013 indicate that the distance between the top of the bluff and the edge of Baxter Road is as close as 30 to 40 feet from the edge of Baxter Road in several areas, and is 60 to 70 feet away in many areas. Subsequent discussions with Mark Haley and other erosion control professionals indicate that the most effective means of addressing the upper bank erosion will be through the planting of native vegetation with strong underground stems (rhizomes), such as American beachgrass, or other native vegetation with an extensive root system. (Bank “augmentation” is also beneficial; this is further discussed in #4C below.) To ensure vegetation efforts are successful, , some addition of sand is needed to prepare the planting bed prior to planting. . This sand will be provided from on-island sand pits by the conveyor belt system utilized during the geotube Additional Information for March 19, 2014 Conservation Commission Meeting 5 construction process. The use of a biodegradable erosion control fabric or jute netting is also proposed to protect soil from wind and water erosion, and retain moisture to facilitate establishment of vegetation. In his memo dated March 12, 2014, Mark Haley recommended the vegetation of the bluff and noted that it would “increase face stability and reduce erosion of the slope above the geotubes due to rain events.” The preferred type of vegetation for initial planting is American beachgrass; additional native vegetation (such as woody shrubs) may be planted subsequently. The USDA Natural Resource Conservation Service’s (NRCS) Plant Guide for American beachgrass (attached) states that the optimal time to plant the bank face is October 1 through March 30, and that this period may be extended through April 30 in New England in most seasons. Discussions with two suppliers of American beachgrass to Nantucket confirm that the best possible time for planting beachgrass is before mid-April. Further, planting at this time allows the American beachgrass one full growing season for rhizome development and the associated benefit to bank stability, prior to the start of the winter storm season. Given how little bank loss can be tolerated in the project area before road closure is required, it is critical to protect the upper bank face from ongoing erosion by establishing vegetation this growing season. Finally, fertilizer applied on the schedule listed in the Plant Guide is strongly recommended by the NRCS as the key to vigorous growth. SBPF and TON propose to follow the fertilizer guidelines established by NRCS. Based on discussions with two local companies, the preferred type of American beachgrass is referred to as “bare root.” The “bare root” type must be planted by mid-April and will result in fuller plant and rhizome development by the fall. Use of the “bare root” type would provide substantial protection to the upper bank by the end of the 2014 growing season. The less preferred option is the “root ball” type, which can be planted after mid-April but would require two growing seasons to develop as fully as the “bare root” type, meaning that the upper bluff would only have marginal protection until the end of the 2015 growing season. Within the project area, the planting of vegetation will occur entirely on private property. The establishment of vegetation not only stabilizes the coastal bank, but also contributes to wetland scenic view and wildlife habitat with no negative impacts. It is clear from the planting of beach grass in other locations on the bluff in recent years that this vegetation will be successful in stabilizing the face of the bluff and encouraging infiltration (instead of run-off and erosion), now that the toe has been protected and the vegetation will not be undermined. Additional Information for March 19, 2014 Conservation Commission Meeting 6 4. Sand Contributions, including Sand Volumes (for construction and sacrificial template), Schedule of Future Contributions/Maintenance, and Bluff Face Augmentation. A. Sand Volume Delivered During Construction SBPF and TON are presenting documentation that the required volume of sand was provided. The attached Table 1. “Summary of Sand Delivery Requirements for ‘Sconset Geotube Project, 87-105 Baxter Road, Nantucket, MA” demonstrates that the project met its sand delivery requirements. The volume of sand required to construct the geotubes (sand fill required in the tubes, sand fill required behind the tubes to create the “benches,” sand for the 22 cy/lf sand cover) totals 31,396.50 cy. The sand delivered was in excess of this requirement at 39,204.24 cy. The 7,807.74 cy of surplus sand was used at the sand delivery locations, on the face of the bluff, at the ends, for construction, etc. The attached Table 2. “Record of Individual Truck Deliveries for ‘Sconset Geotube Project, 87-105 Baxter Road, Nantucket, MA” provides a detailed inventory of individual truck deliveries, including invoices and receipts. B. Sand Maintenance Plan and Delivery Schedule. SBPF and TON are presenting information on the volume and delivery schedule for the sand cover. Considerable documentation has been previously provided that the average annual volume of bank erosion is equivalent to 14.3 cy/lf/yr (see November 1, 2013 submission). SBPF and TON will accept a sand mitigation requirement of 22 cy/lf/yr, in accordance with the recommendation from the DEP that additional sand be contributed for now, based on its finding that: “The implementation of the nourishment plan will mitigate any potential difference in down drift impacts between the four Geotube design and the hybrid design approved in the Town's Certification. “ (See attached December 10, 2013 cover letter from DEP.) The 22 cubic yards per linear ft (cy/lf) of sand will be delivered in accordance with the following schedule: o Provide the initial cover of 22 cy/lf during and/or immediately following construction. o Annually in April starting in 2014: Provide additional sand and/or adjust the existing template sand to obtain a minimum of 2 feet of cover over the geotubes to protect them from UV degradation. If some portion of the previous year’s sand is in place at the time of April nourishment, then only that volume needed to provide the 2 feet of cover will be added. The Additional Information for March 19, 2014 Conservation Commission Meeting 7 volume of any sand placed in April will be recorded and counted towards the annual 22 cy/lf requirement. o Annually in November starting in 2014: Place an additional 10-15 cy/lf of sand, to ensure a substantial portion of the sand template volume is available at the onset of the winter storm season. Throughout the winter, place additional sand on an as-needed basis, in accordance with the replenishment trigger presented in our November 12, 2013 letter (i.e., if half the vertical height of the lowest geotube is exposed, place a minimum of 2 cy/lf). If the balance of the 22 cy/lf volume is not placed in its entirety during the 2014-2015 winter, the balance of the sand will be placed by March 31, 2015. o Delivery tickets from sand suppliers will be provided to the Conservation Commission to document the total volume of sand provided on an annual basis (April 1- March 31 of any given year). The attached Tables 1 and 2 provide, respectively, a summary of how the project met its sand delivery requirements as well as a detailed inventory of individual truck deliveries and receipts. C. Bluff Augmentation SBPF and TON are requesting approval of bluff augmentation to further stabilize the bluff. As described above under #3, in the attached photographs, and in the memo from Mark Haley dated March 12, 2014, the existing coastal bank above the geotubes remains susceptible to erosion from rain and stormwater runoff. The bluff is particularly unstable in those portions that are over-steepened at the top, which are highly susceptible to further collapse, potentially leading to additional catastrophic losses at the top of the coastal bank. To address these issues, it is proposed to “augment” the existing coastal bank in the project area by adding compatible sand to the face of the coastal bank, via the same conveyor belt system used to provide the sand cover on the geotubes. Mark Haley of Haley & Aldrich, in his memo dated March 12, 2014, has indicated that: “Adding sand to the face of the slope, especially near the top of slope where the slope is near vertical, will greatly increase the stability of the bluff.” During the construction process, additional sand was placed at or near the sand delivery locations at 87/91 and 99/101 Baxter Road (see attached Photograph 5). It has been observed that this sand acted to protect the face of the bluff because it increased infiltration of rain and surface water runoff and also attenuated soil erosion from rain and surface water flows. In the areas where the face of the bluff Additional Information for March 19, 2014 Conservation Commission Meeting 8 was not augmented with additional sand, surface water flows continued to erode that portion of the bluff above the geotubes. SBPF and TON are requesting approval of the existing bluff augmentation now in place at or near the two sand delivery locations (87/91 and 99/101 Baxter Road), as well as the proposed added augmentation at 93 Baxter Road, where the existing pre- 1978 dwelling is less than 8 feet from the top of bank and is in imminent danger. Immediate bluff augmentation efforts at 93 Baxter Road, combined with vegetation, could stabilize the entire bluff and prevent the loss of this pre-1978 structure. We note that adding this sand has no negative effect: it is bank- and beach- compatible and will either remain in place or run down to the geotube template or the beach for contribution to the littoral system. List of Attachments 1. Memo from Ocean and Coastal Consultants, dated March 13, 2014 2. DEP Emergency Certification Approval (cover letter and Order of Conditions), dated December 10, 2013 3. Plan and Isometric View of Returns 4. USACE Correspondence (emails from Epsilon to USACE dated December 27 and 30, 2013 and letter from Epsilon dated February 26, 2014) 5. Memo from Mark Haley dated March 12, 2014 6. Photographs 1-5 of Sconset Bluff 7. Natural Resource Conservation Service’s Plant Guide for American beachgrass 8. Table 1. “Summary of Sand Delivery Requirements for ‘Sconset Geotube Project, 87-105 Baxter Road, Nantucket, MA” 9. Table 2. “Record of Individual Truck Deliveries for ‘Sconset Geotube Project, 87- 105 Baxter Road, Nantucket, MA” 10. Response to Nantucket Land Council Letter dated February 18, 2014 11. Approximate Sand Template Additional Information for March 19, 2014 Conservation Commission Meeting 9 Ocean and Coastal Consultants, Inc. (OCC) performed a runup and overtopping analysis on the proposed "hybrid" stabilization system consisting of three (3) tiers of geotubes to elevation +21 ft MLW followed by jute/coir bags above. Coastal design parameters such as water levels, wave heights, setup, etc. as outlined in OCC's memo titled "Sconset Coastal Analysis Summary" dated December 6, 2013 were utilized in the analysis. Below elevation 18 ft MLW, the structure is subject to direct wave attack from 100- year storms. At elevation 21 ft MLW, where the fourth tier is proposed, the jute/coir bags will be subjected to wave runup and subsequent overtopping forces. Wave runup and overtopping was calculated on the stacked geotube system in accordance with USACE Coastal Engineering Manual (CEM) methodology for a berm configuration based on the as-built geometry in which the third tube is set back approximately 11.5 ft from the front of the middle tube; the top of the third tube is at approximate elevation of +21 ft MLW with jute/coir bags above set back approximately 11.5 ft to maintain the existing slope. The attached spreadsheet using Equation VI-5-7 of the CEM indicates that wave runup will be 10.4 ft. with average overtopping rate (q) of 1.7x10-2 m3/s per m (17 l/s per m). The USACE CEM Table VI-5-6 provides critical values of average overtopping discharges and the rate at which various structures may sustain damage. According to the table, at 1x10-2 m3/s per meter, a grass sea-dike will be damaged. A grass sea-dike would be most similar to jute- or coir-covered slope so this overtopping rate will likely cause damage to the jute/coir bags. The wet tensile strength of jute/coir products is 21.7 kN/m (machine direction) and 15.1 kN/m (cross direction) while the recommended shear stress is 0.215 kN/m2 (see attachment). The Wave Overtopping of Sea Defences and Related Structures: Assessment Manual provides a graph of equivalent pressure for overtopping rates based on model studies (attached). The equivalent pressure for 17 l/s/m of overtopping will be in excess of 25 kPa (25 kN/m2) which is greater than the strength of the material. As a result, it is expected that the jute bags will be torn open under wave overtopping pressures of the 100-year storm event. MEMO TITLE Sconset Hybrid System Runup and Overtopping DATE 13 March 2014 TO SBPF COPY Epsilon Associates FROM Azure Dee Sleicher, P.E. PROJECT NO 210019.1 ADDRESS Ocean and Coastal Consultants, Inc. 35 Corporate Drive Suite 1200 Trumbull, CT 06611 TEL 203-268-5007 FAX 203-268-8821 WWW ocean-coastal.com PAGE 1/2 PAGE 2/2 Since jute/coir products are susceptible to being ripped open by the forces of storm waves, it is possible that they may need to be replaced 1-3 times per year. This replacement can not always occur in a timely fashion during multi-day or rapid succession storms resulting in loss of protection at a time when it is most needed. Frequent replacement of jute/coir products results in additional truck traffic and added costs. Lastly, the project requires a substantial volume of sacrificial sand (22 cy/lf) to be placed on top of the geotubes. To spread this volume, a bulldozer (D6 dozer – 18 tons) and/or an excavator (336 excavator – 40 tons) will be required to be perched on top of the 4th row of tubes. It is unlikely that a 4th row of jute/coir will be able to withstand the required loading and shear stresses caused by the equipment operating on top of the sand-filled jute bag. For all of the reasons stated above, it is not advisable that jute/coir be used as a substitution for proper geotextile tubes (geotubes). Sconset, Nantucket Geotube Runup and Overtopping Analysis Ocean and Coastal Consultants March 2014 Equivalent and Average Slopes (aeq, a): CEM EQ. VI-5-8 and VI-5-9, Figure VI-5-7 (below) Input: a1 a2 Hs (feet)Tp (sec)B (feet)Rc (feet) 2 d (feet) 3 60 60 5 15.2 11.5 11.1 6.1 1 - negative if SWL is below berm, positive if SWL is above 2 - freeboard: top of berm above SWL 3 - water depth from toe of berm to SWL Output: aeq a 30.07 60 rB 0.67 rdB 2.46 gb 1.97 Runup and Overtopping Check: CEM EQ. VI-5-24 and VI-5-25 Sop 0.00 gr 0.90 relatively "smooth" slope ξop 26.64 ξeq 52.62 gB 1 gh 0.77 Ru2% (feet)10.37 CEM EQ. VI-5-7 q 1.72E-02 m3/s per m * - see Table VI-5-6 if more conservative limits of overtopping are required 0.6 ≤ gb ≤ 1.0 Optimum value is 0.6 Allowable Limit* = 1E-03 m3/s per m SWL (feet below berm)1 -11.1 Page 1 Sconset, Nantucket Geotube Runup and Overtopping Analysis Ocean and Coastal Consultants March 2014 x y x y x y x y 0 0 0 0 11.5 0 -2.89 -5 -5.77 -10 11.5 0 17.27 10 14.39 5 -19.92 0.58 x y x y x y -5.77 -11.1 0 0 -9.30 -16.1 17.27 -11.1 5.77 10 -3.52 -6.1 -8.9E-16 1.73 Hs y-intercept of a2 Hs y-intercept of a2 (transposed) a2 slope of Hs line a2 (transposed) Berm Width SWL slope of Hs line a1 -15 -10 -5 0 5 10 15 -10 -5 0 5 10 15 20 Equivalent Slope (Including Berm) a1 Berm Width a2 Hs -20 -15 -10 -5 0 5 10 15 -15 -10 -5 0 5 10 15 20 Average Slope (Excluding Berm) a1 Berm Width a2 SWL a2 transposed Hs Page 2 Sconset, Nantucket Geotube Runup and Overtopping Analysis Ocean and Coastal Consultants March 2014 17 l/s per m Page 3 37 33.2 Overtopping velocities Few data are available on overtopping velocities and their contribution to hazards. For simply sloping embankments Chapter 5 gives guidance on overtopping flow velocities at crest and inner slope as well as on flow depths. Velocities of 5-8 m/s are possible for the maximum overtopping waves during overtopping discharges of about 10-301/s per m width. Studies of hazards under steady flows suggest that limiu on horizontal velocities for people and. vehicles will probably need to beset below vX < 2.5 to 5 m/s. ALso refer to Section 5.5. Upward velocities (vZ) for vertical and battered walls under impulsive and pulsating conditions have been related to the inshore wave celerity, see Chapter 7. Relative velocities, vZ/ct have been found to be roughly constant at vZ/ci ~ 2.5 for pulsating and slightly impulsive conditions, but increase significantly for impulsive conditions, reaching v=/c+ ~ 3 — 7. 333 Overtopping loads and overtopping simulator Post-overtopping wave loads have seldom been measured on defence structures, build- ingsbehind sea defences, or on people, so little generic guidance is available. If loadings from overtopping flows could be important, they should be quantified by interpretation of ap- propriate field data or by site-specific model studies. An example (site specific) model study indicates how important these effects might be. A simple 1 m high vertical secondary wall was set in a horizontal promenade about 7 m back from the primary seawall, itself a concrete recurve fronted by a rock armoured slope. Pulsat- ing wave pressures were measured on the secondary wall against the effective overtopping discharge arriving at the secondary wall, plotted here in Fig. 3.3. This was deduced by apply- ingEquation 3.1 to overtopping measured at the primary wall, 7 m in front. Whilst strongly site specific, these results suggest that quite low discharges (0.1-1.01/s/m) may lead to load- ings up to SkPa. 25 20 .v y 15 N ~ ~~ a` s a8 0 Overtopping discharge at the seawall [llslm] Fig. 3.3: Example wave forces on a secondary wall I~ ,Q ~s ~~, ~ ~ Z5 1~ P0. '----~ ~ 1 ~. ~ 5 ~ ~a5[~ 0/1 ~~~u~t 155 Andrew Drive, Stockbridge, GA 30281 1 800 760 3215 Tel: 770 506 8211 E-mail: rolanka@rolanka.com Fax: 770 506 0391 web: www.rolanka.com Manufacturer's Certificate of Compliance TO WHOM IT MAY CONCERN This is to certify that the BioD-MatTM70 woven coir blanket is woven from machine twisted coir twines made of bristle coir obtained from freshwater cured coconut husks. BioD-MatTM70 blankets are manufactured to conform to the following physical properties: Property Test Method BioD-MatTM70 1. Weight ASTM D 3776 23 oz/SY (780 g/m2) 2. Wide width tensile strength ASTM D 4595 Wet Machine direction 1488 lbs./ft (21.7 kN/m) Cross direction 1032 lbs./ft (15.1 kN/m) Dry Machine direction 1740 lbs./ft (25.4 kN/m) Cross direction 1176 lbs./ft (17.2 KN/m) 3. Elongation at failure ASTM D 4595 Wet Machine direction 38 % Cross direction 25 % 4. Number of twine in the mat Machine direction 82 twines /yard (90 twines / m) Cross direction 55 twines /yard (60 twines / m) 5. Open area Calculated 48 % 6. Thickness ASTM D 1777 0.35 inch (9 mm) 7. Recommended shear stress 4.5 lbs./sq.ft. (215 N/sq.m.) 8. Recommended flow 12 fps (3.7 m/s) 9. Recommend slope >1:1 10. “C” factor 0.002 RoLanka International, Inc. Calista R. Santha Calista R. Santha, Ph.D. President SBA’s 8(a) & SDB and DOT DBE Certified. -----Original Message----- From: Smith, Les Sent: Monday, December 30, 2013 10:54 AM To: 'Adams, Karen K NAE' Cc: 'Kristoff, Richard C NAE'; 'Kotelly, Kevin R NAE'; 'Kara Buzanoski'; Posner Josh (joshposner@mediaone.net); Jamie Feeley - Cottage & Castle, Inc. (jamie@cottageandcastleinc.com); Hartnett, Maria Subject: RE: Siasconset Beach, Nantucket (UNCLASSIFIED) Karen, After our discussion on Friday, I asked for a survey of the location of the high tide line (HTL) at Sconset to locate the US Army Corps jurisdiction to determine if the current work of installing geotubes is within your jurisdiction. A laser level was used to install stakes on the beach at elevation 5.4 feet MLW as shown on the attached 3 photos taken yesterday 12-29-13 at 0831 at high tide. HTL as shown on the project plans is identified as 5.1 feet MLW, so these stakes are actually 0.3 feet above HTL. Therefore, it appears that the geotube work is not within USACE jurisdiction. In my discussion with the construction manager, all future work will be higher and more landward than the work shown in these photos so also out of USACE jurisdiction. I remember that the question of HTL height came up previously at Sconset when Duneguard was being used in 2004. At that time, we did an analysis of the highest predicted tides from 1994 to 2003. The highest predicted tide was 4.25 feet MLW over that timeframe and USACE requested that we use that elevation for HTL. In 2005 when SBPF applied for and received a USACE permit for sand delivery via barge (see attached), the elevation of 4.25 feet MLW was used. Thus, the use of 5.1 feet MLW is a more conservative elevation than was previously accepted. Let me know if you need any additional information. Regards, Les Lester B. Smith, Jr. Principal & Coastal Geologist Epsilon Associates, Inc. 3 Clock Tower Place, Suite 250 Maynard, Massachusetts 01754 Direct: 978.461.6212 Epsilon: 978.897.7100 lsmith@epsilonassociates.com https://twitter.com/EpsilonAssoc www.epsilonassociates.com -----Original Message----- From: Smith, Les Sent: Friday, December 27, 2013 12:33 PM To: 'Adams, Karen K NAE' Cc: Kristoff, Richard C NAE; Kotelly, Kevin R NAE; 'Kara Buzanoski'; Posner Josh (joshposner@mediaone.net) Subject: RE: Siasconset Beach, Nantucket (UNCLASSIFIED) Karen, This project is an Emergency Certification which was approved by MassDEP then submitted to the Nantucket Conservation as a joint project by the Town of Nantucket and SBPF and approved. Their plan set by Milone & MacBroom (attached, approved design was slightly different in terms of the height of the structure) shows that the proposed work was to be conducted above the High Tide Line on the beach. I am copying Kara Buzanoski, the Nantucket DPW Head and Josh Posner from SBPF if you need any additional information regarding the project. Regards, Les February 26, 2014 Kevin Kotelly, P.E. US Army Corps of Engineers, 696 Virginia Road Concord, MA 01742 Subject: Emergency Geotube Installation below 87-105 Baxter Road ‘Sconset, Nantucket, MA. File Number: NAE-2005-350 Dear Mr. Kotelly: The purpose of this letter is to confirm in writing our understanding of the status of Corps review of the above-referenced project, following our conversation on February 21, 2014 in regards to your letter dated February 4, 2014 and follow-up email correspondence from Epsilon on February 6 and February 7, 2014. This letter also provides to you the information you requested about ongoing maintenance of the project. As we discussed, the project was permitted under an emergency certification and construction occurred from mid-December through the end of January. The as-built plan for the project (dated January 30, 2014) and submitted to the Corps via email on February 7, 2014, shows that the project components are above the high tide line (HTL) elevation of 5.11 feet Mean Low Water (MLW). The HTL elevation was established by averaging each month’s highest high tide level recorded from the NOAA Nantucket Station (ID 8449130) over a one year period. I understand that the Corps concurs with the determination that the constructed project is above the high tide line and is therefore outside of your jurisdiction. As we discussed, the design plans for the project (submitted to the Corps via email on December 27, 2013) indicate that the high tide line elevation is approximately 45- feet or more seaward of the anchor tube (the most seaward component of the project), which led to our determination that construction of the project would not require a Corps permit. Due to the timing of permitting, with the project receiving approval in mid-December, construction had to occur during the winter storm season, when the beach may have temporarily narrowed. Stakes at elevation 5.4 feet MLW (i.e., somewhat higher than the high tide line elevation of 5.11 feet) were placed on the beach at the end of December. Photographs of the staked elevation PRINCIPALS Theodore A Barten, PE Margaret B Briggs Michael E Guski, CCM Dale T Raczynski, PE Cindy Schlessinger Lester B Smith, Jr Robert D O’Neal, CCM, INCE Andrew D Magee Michael D Howard, PWS Laura E Rome Douglas J Kelleher AJ Jablonowski, PE Samuel G Mygatt, LLB 1943-2010 ASSOCIATES Stephen H Slocomb, PE Maureen A Cavanaugh David E Hewett, LEED AP 3 Clock Tower Place, Suite 250 Maynard, MA 01754 www.epsilonassociates.com 978 897 7100 FAX 978 897 0099 Mr. Kevin Kotelly 2 US Army Corps of Engineers February 26, 2014 and work on the beach were provided to the Corps via email on December 30, 2014. The construction crew was aware of the HTL location on the beach and made every effort to stay landward of that line; however, it was sometimes hard to determine the exact location of the HTL on the beach due to storm conditions and associated wave runup. We note that the Army Corps definition of high tide line excludes storm surges: “The term ‘high tide line’ means the line of intersection of the land with the water's surface at the maximum height reached by a rising tide. The high tide line may be determined, in the absence of actual data, by a line of oil or scum along shore objects, a more or less continuous deposit of fine shell or debris on the fore shore or berm, other physical markings or characteristics, vegetation lines, tidal gages, or other suitable means that delineate the general height reached by a rising tide. The line encompasses spring high tides and other high tides that occur with periodic frequency but does not include storm surges in which there is a departure from the normal or predicted reach of the tide due to the piling up of water against a coast by strong winds such as those accompanying a hurricane or other intense storm” [emphasis added]. Overall, there were no permanent impacts below the HTL and any temporary impacts that may have occurred below the HTL elevation have been restored to pre- existing conditions through natural wind and wave action. Based on our conversation, I understand that the Corps is taking no further action on the work completed to date. Specifically, the Corps is not requesting additional information, not issuing an enforcement order, and not requiring or seeking an after- the-fact permit. I also understand that the Corps is requesting (1) that we provide information on maintenance of this project to the Corps and obtain a permit if required, and (2) that we contact the Corps if any expansion of the project is proposed and obtain a permit if required. The attachment to this letter provides the requested information on maintenance. Additionally, a Notice of Intent for the project is under review that contemplates expansion of the geotube approximately 400 feet southward to the southern border of 85 Baxter Road. We will provide information to you on the construction of the proposed expansion in a subsequent submittal to assist your determination of whether a Corps permit is required for this work. Mr. Kevin Kotelly 3 US Army Corps of Engineers February 26, 2014 Please contact me at (703) 489-8945 or mhartnett@epsilonassociates.com, or Les Smith at (978) 461-6212 or lsmith@epsilonassociates.com, for any questions regarding this submission. Sincerely, EPSILON ASSOCIATES, INC. Maria B. Hartnett Senior Consultant Enclosure Copy Furnished (via email): Jeff Carlson, Natural Resources Coordinator, 2 Bathing Beach Road, Nantucket, MA 02554, jcarlson@nantucket-ma.gov Ms. Elizabeth F. Kouloheras, DEP Southeast Regional Office, Wetlands and Waterways, 20 Riverside Drive, Lakeville, MA 02347, elizabeth.kouloheras@state.ma.us Robert Boeri, Coastal Zone Management, Boston, MA, robert.boeri@state.ma.us Kara Buzanoksi, Town of Nantucket Department of Public Works, kbunzanoski@nantucket-ma.gov Joshua Posner, President, Sconset Beach Preservation Fund, jposner@risingtidellc.net sconsetbeachpreservationfund@gmail.com MAINTENANCE PROTOCOLS FOR THE GEOTUBE SYSTEM AT 87-105 BAXTER ROAD, NANTUCKET, MA FEBRUARY 26, 2014 Maintenance of the above-referenced project is primarily anticipated to include replacing the sand cover. It is anticipated that sand will be added over the geotubes two times each year (spring and fall), with possible additional deliveries during the winter if required by severe storms. As during the initial installation, sand will be delivered at the top of the bluff to a conveyor belt that will dump it over the edge. (Once the coastal bank is vegetated, ADS pipes will be placed on the bank face to convey the sand while protecting the vegetation.) An excavator and a bulldozer will be positioned on the template above the third geotube; the excavator will pull sand from the pile and make it available to the dozer, which will spread the sand over the length of the geotubes and up and down the face of the geotube as necessary. During a small maintenance event, a skid steer or loader could be used in place of the excavator and bulldozer; these would work in approximately the same locations as the excavator or bulldozer. Overall, the sand maintenance activity will occur either on top of the geotubes and/or at the back of the beach (within approximately 15 feet of the seaward edge of the lowest geotube). The equipment will access the beach via the Hoick’s Hollow accessway to the north of the project location. Therefore, the sand maintenance would not appear to be within Army Corps jurisdiction. The only other maintenance activity that may be required is repair of the geotubes from any storm damage. This activity would involve a skid steer or an excavator depending on the scale and location of the damage and required patch. This would not involve slurry pumping, only infilling and patching. As with the sand maintenance activity, this work would occur at the back of the beach, above the high tide line, and equipment access would be via Hoick’s Hollow. Therefore, any geotube repair activities would not appear to be within Army Corps jurisdiction. MEMORANDUM 12 March 2014 File No. 26694-300 TO: Sconset Beach Preservation Fund Epsilon Associates Les Smith FROM: Haley & Aldrich, Inc. Mark X. Haley, P.E. SUBJECT: Sconset Beach Recommendations to Increase Bluff Stability This memo has been prepared to present recommendations to increase bluff stability at the Sconset Bluffs adjacent to Baxter Road. While a portion of the toe of the bluff (Lot 87 to 105) has been protected by the geotube installation, additional measures are recommended to address the potential for ongoing erosion of the face and especially the top of the bluff due to surface water runoff and the potential collapse of the near-vertical sections at the top of the slope. If not addressed, ongoing erosion and slumping can reasonably be expected to result in further losses to the top of the bluff that may threaten Baxter Road and associated utilities or certain homes. The toe protection addresses the major source of erosion; however, leaving the face of the bluff unprotected leaves a lesser but still critically important element unaddressed. Haley & Aldrich recommends protecting the face of the bluff as follows: 1. Install surface water drains along Baxter Road at selected locations. We recommend that discrete sub-surface drainage systems be installed perpendicular and potentially parallel to Baxter Road in selected locations to control water breakout on the face of slope causing further erosion. We recommend placement of a 4 inch diameter perforated pipe within a shallow narrow trench backfilled with crushed stone wrapped in filter fabric to collect and direct water to the slope face. To control water flow down the face of the bluff, a solid pipe down the face slope could be installed and direct water to the sand and beach area below. The location of these limited sub-surface drains would be selected based on observations following a significant rain event to identify where: a. ponding of water occurs at the edge of Baxter Road, and b. water breakout at the face of slope is observed These elements are proposed to reduce the potential for bank erosion due to surface water run-off. The stone and pipe system will have no impact on subsurface water hydrogeology as the stone and pipe are located significantly above the ground water table. The system is to control the surface water and preclude impacts to the soils at the bluff face. This system is recommended specifically at Lot 91, and would also be beneficial at other locations where area topography is such that surface water runoff from Baxter Road is being directed across the property overland and towards the bluff. Haley & Aldrich, Inc. 465 Medford St. Suite 2200 Boston, MA 02129 Tel: 617.886.7400 Fax: 617.886.7600 HaleyAldrich.com Sconset Beach Preservation Fund 12 March 2014 Page 2 Additional backfill is also recommended specific to Lot 91, where a gully has historically been present. The location of the gully has always been slightly lower in elevation than the surrounding land and is believed to potentially be an old surface water drainage channel primarily from Baxter Road. The gully should be backfilled and the backfill material placed should continue to allow surface water to flow from Baxter Road out to the bluff, using the surface water drain described above. 2. “Augment” the face of the bluff by placing additional sand above the geotubes. Adding sand to the face of the slope, especially near the top of slope where the slope is near vertical, will greatly increase the stability of the bluff. The additional sand will result in a shallower, more stable slope angle that will decrease the likelihood of collapse of the over steepened upper portions of the bluff. Additional sand augmentation will also provide increased infiltration of rain and surface water runoff and attenuate soil erosion from rain and surface water flows (Refer to Photo 1). Such augmentation can be beneficial anywhere in the project area from 87-105 Baxter Road where the upper bluff is near vertical or where the bank soils provide poor drainage, and could be prioritized in those areas where Baxter Road or homes are most threatened. With the onset of spring and significant rain events, as experienced during the past few years, “sand augmentation” should be a priority especially where structures are close to the Bluff or where the distance to Baxter Road is less than 35 to 40 feet. 3. Plant the face of the bluff with beach grass and native shrubs. We recommend a planting program of beach grass and native shrubs be implemented, which will restore the slope to its “native state” and increase face stability and reduce erosion of the slope above the geotubes due to rain events. The use of a biodegradable netting and/or erosion control fabric is also recommended. In those areas where the face of the bank is uneven (which appears to be over much of the project area from 87-105 Baxter Road), placement of additional sand and slope grading is recommended to create a uniform surface of the slope and allow plantings. As with the augmentation, vegetation should be a priority this spring. G:\26694\300\Correspondence\2014-04-12Client Memo Backfill at Erosion Gully-Lot 91 V3 combined edits.docx Photographs 1-2 Sconset Bluff – Upper Bank Erosion Baxter Road Geotube Project Nantucket, MA Image courtesy of George Riethof and the ‘Sconset Trust Photographs 3-4 Sconset Bluff - Upper Bank Erosion Baxter Road Geotube Project Nantucket, MA Photograph 5 Sconset Bluff Baxter Road Geotube Project Nantucket, MA Image obtained from the Facebook page of the Nantucket Coastal Conservancy Plant Guide Plant Materials <http://plant-materials.nrcs.usda.gov/> Plant Fact Sheet/Guide Coordination Page <http://plant-materials.nrcs.usda.gov/intranet/pfs.html> National Plant Data Center <http://npdc.usda.gov> AMERICAN BEACHGRASS Ammophila breviligulata Fern. Plant Symbol = AMBR Contributed By: USDA NRCS New Jersey State Office and the National Plant Data Center Alternate Names coastal beachgrass, beach grass, marram grass Uses Dune Stabilization: Major use is to stabilize moving sand along the Atlantic seacoast and Great Lakes region. It is the best species for the initial stabilization of frontal dunes. Revegetation: Useful as an erosion control plant on non-dune areas where soils are very sandy or inherently droughty and the site conditions make establishment of seeded species very difficult. In this application, the beachgrass may only survive a few years, but it plays a valuable role in jump-starting plant succession. Also used on soils high in salinity, such as industrial waste needing vegetative cover. Status Please consult the PLANTS Web site and your State Department of Natural Resources for this plant’s current status, such as, state status and wetland indicator values. Description General: Grass Family (Poaceae). American beachgrass, is a leafy, spreading, rhizomatous, native, bunch grass with many stems per clump. It may reach a height of two to three feet. The seed head is a spike-like panicle, about ten inches long, and appears in late July or August. Leaves are long and narrow, and may become rolled or folded as it matures. One outstanding growth characteristic is the strong underground stems (rhizomes) that spread beneath the sand and give rise to many new plants. Its vigorous growth enables the plant to withstand heavy deposits of sand and grow up through it. Distribution For current distribution, please consult the Plant Profile page for this species on the PLANTS Web site. Establishment Adaptation: It is native to the mid-Atlantic coastal region from Maine to North Carolina, and the Great Lakes region. It will grow on inland sites, high in sand and/or saline content, provided applications of fertilizers containing nitrogen are made. Requires a sunny position in a light, well-drained soil and is very tolerant of severe maritime exposure. The plant has a deep, strong and extensively creeping rhizome, and can become invasive when growing in suitable conditions. This ability to colonize makes this grass very valuable for dune stabilization. Planting: The best time to plant beach grass is from October 1 to March 30 in the Mid-Atlantic region, but may be extended to April 30 in New England in most seasons. If properly planted, good survival can be expected at any time during this period, except when soil is frozen. Summer plantings are not satisfactory. American beachgrass can be planted either by hand or by mechanical equipment designed for this work. Hitchcock (1951) The stems of plants (culms) are used for planting stock. Two to three culms are planted per hole. Space plants 18" by 18" unless wind erosion is severe, then spacing is reduced to 12” by 12”. Stagger the plantings in alternate rows to provide maximum erosion control. On very stable areas where wind is not a factor, a spacing of 24" by 24" is suitable. An 18” by 18" spacing requires 58,500 culms per acre, or 1,350 culms per 1,000 square feet. Beachgrass culms must be planted at least 8" deep. This prevents plants from drying out, as well as being blown out by the wind. A tiling or ditching spade is an excellent tool for opening the planting hole. The culms and roots must be kept moist before and during planting. Success of planting will increase if the stock is dormant or has made very little growth. Fertilizer properly applied is the key to good vigorous growth, as coastal sands are rather infertile. Apply fertilizer 30 days after planting, but no earlier than April 1 in the Mid-Atlantic and May 1 in New England. Inorganic, granular fertilizers high in nitrogen are best, if available (N-P-K analysis of 30- 10-0, 16-8-8 or 10-10-10). Split the fertilizer applications: One in spring, another early summer, and a third in late summer, only in the establishment year. Apply no more than 1 lb. of N/1000 sq. ft .in a single application. Management Once the stand is well established, the rate of fertilizer applied can be reduced by half, or applied only when the stand appears to be weakening, based on local soil test results. Pedestrian and vehicular traffic that bends or breaks the culms will seriously damage the plants and may kill them if traffic is intensive. Cultivars, Improved and Selected Materials [Vegetative culms] of ‘Cape’ and ‘Hatteras’ are commercially available, though seed is not available. ‘Cape’ is the most recent variety and was developed by the Natural Resources Conservation Service [in 1970] at the Cape May Plant Materials Center, Cape May Court House, New Jersey. Material for this release was collected in Barnstable County, Massachusetts. It is very vigorous, a heavy culm producer with leaves exceptionally broad, and spreads rapidly by rhizomes. ‘Hatteras’ was developed by the North Carolina Agricultural Experiment Station and is better adapted to southern climates. Hatteras was developed from a collection of 18 clones screened for vigor and rate of spread. This cultivar is characterized by early vigor. References Alderson, J. & C. Sharp 1994. Grass varieties in the United States. Agriculture Handbook No. 170. USDA, Soil Conservation Service, Washington, D.C. 296 pp. Gleason, H.A. & A. Cronquist 1991. Manual of vascular plants of northeastern United States and adjacent Canada. The New York Botanical Garden, Bronx, New York. 910 pp. Hitchcock, A.S. 1951. Manual of the grasses of the United States. Miscellaneous Publication No. 200. USDA, Washington, D.C. 1051 pp. Radford, A.E., H.E. Ahles, & C.R. Bell 1968. Manual of the vascular flora of the Carolinas. The university of North Carolina Press, Chapel Hill, North Carolina. 1183 Selisker, D.M. 1995. Coastal dune restoration: A strategy for alleviating dieout of Ammophila breviligulata. Restoration Ecology 3(1):54-60. Seymour, F.C. 1993. The flora of New England. Privately printed. 611 pp. Prepared By Chris Miller USDA, NRCS, New Jersey State Office J. Scott Peterson USDA NRCS National Plant Data Center, Baton Rouge, Louisiana Species Coordinator Chris Miller USDA, NRCS, New Jersey State Office, Somerset, New Jersey Edited 05dec00 jsp;07feb03ahv; 30may06jsp For more information about this and other plants, please contact your local NRCS field office or Conservation District, and visit the PLANTS Web site<http://plants.usda.gov> or the Plant Materials Program Web site <http://Plant-Materials.nrcs.usda.gov> The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, sex, religion, age, disability, political beliefs, sexual orientation, and marital or family status. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at 202-720-2600 (voice and TDD). To file a complaint of discrimination write USDA, Director, Office of Civil Rights, Room 326-W, Whitten Building, 14th and Independence Avenue, SW, Washington, DC 20250-9410 or call 202-720-5964 (voice or TDD). USDA is an equal opportunity provider and employer. Read about Civil Rights at the Natural Resources Convervation Service. Table 1. Summary of Sand Delivery Requirements for 'Sconset Geotube Project, 87-105 Baxter Road, Nantucket, MA Sand Delivery Amounts Cubic Yard (CY)/ Linear Foot (LF) Project Length (LF)Total CY Geotube Construction Inside Tier 2 Geotube 4.5 852 3834 Inside Tier 3 Geotube 4.5 835 3757.5 Bench Behind Tier 2 Geotube 3 852 2556 Bench Behind Tier 3 Geotube 3 835 2505 Mitigation 22 852 18744 Total Sand Delivery Required 31,396.50 Total Sand Delivery Completed 39,204.24 Surplus Sand Delivered (At sand delivery locations, on bluff face, at ends, for construction, etc.)7,807.74 Page 1 of 27 Table 2. Record of Individual Truck Deliveries for 'Sconset Geotube Project, 87-105 Baxter Road, Nantucket, MA Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 89588 12/18/2013 1:00 Tri Axle 22 594.00$ P&M Reis 89588 12/18/2013 1:32 Tri Axle 22 594.00$ P&M Reis 89588 12/18/2013 2:05 Tri Axle 22 594.00$ P&M Reis 89588 12/18/2013 3:10 Tri Axle 22 594.00$ P&M Reis 89588 12/18/2013 4:05 Tri Axle 22 594.00$ P&M Reis 89588 12/18/2013 1:40 Perry Mack 16 432.00$ P&M Reis 89588 12/18/2013 9:01 Truck #5 20 540.00$ P&M Reis 89588 12/18/2013 11:07 Truck #5 20 540.00$ P&M Reis 89588 12/18/2013 12:28 Truck #5 20 540.00$ P&M Reis 89588 12/18/2013 1:10 Truck #5 20 540.00$ P&M Reis 89588 12/18/2013 1:54 Truck #5 20 540.00$ P&M Reis 89588 12/18/2013 7:45 New Mack 20 540.00$ P&M Reis 89588 12/18/2013 10:50 New Mack 20 540.00$ P&M Reis 89588 12/18/2013 12:15 New Mack 20 540.00$ P&M Reis 89588 12/18/2013 12:55 New Mack 20 540.00$ P&M Reis 89588 12/18/2013 1:49 New Mack 20 540.00$ P&M Reis 89588 12/18/2013 2:46 New Mack 20 540.00$ P&M Reis 89588 12/18/2013 3:35 New Mack 20 540.00$ P&M Reis 89588 12/18/2013 4:10 New Mack 20 540.00$ 10,422.00$ Holdgate 48974 12/18/2013 09:41:21AM 1,CAT 966H 17.54 473.58$ Holdgate 48974 12/18/2013 11:49:43AM 1,CAT 966H 21.87 590.49$ Holdgate 48974 12/18/2013 11:58:55AM 1,CAT 966H 23.02 621.54$ Holdgate 48974 12/18/2013 12:50:08PM 1,CAT 966H 22.17 598.59$ Holdgate 48974 12/18/2013 12:52:57PM 1,CAT 966H 22.96 619.92$ Holdgate 48974 12/18/2013 12:55:23PM 1,CAT 966H 17.22 464.94$ Holdgate 48974 12/18/2013 01:24:30PM 1,CAT 966H 22.45 606.15$ Holdgate 48974 12/18/2013 01:34:19PM 1,CAT 966H 23.22 626.94$ Holdgate 48974 12/18/2013 01:43:21PM 1,CAT 966H 17.69 477.63$ Holdgate 48974 12/18/2013 02:00:08PM 1,CAT 966H 22.9 618.30$ Holdgate 48974 12/18/2013 02:29:24PM 1,CAT 966H 22.43 605.61$ Holdgate 48974 12/18/2013 02:48:47PM 1,CAT 966H 17.66 476.82$ Holdgate 48974 12/18/2013 03:14:41PM 1,CAT 966H 23.99 647.73$ Holdgate 48974 12/18/2013 03:23:02PM 1,CAT 966H 22.57 609.39$ Holdgate 48974 12/18/2013 04:05:56pm 1,CAT 966H 22.03 594.81$ 8,632.44$ P&M Reis 74752 12/19/2013 7:15 Tr Axle 22 594.00$ P&M Reis 74752 12/19/2013 7:55 Tri Axle 22 594.00$ P&M Reis 74752 12/19/2013 3:00 Tri Axle 22 594.00$ P&M Reis 74752 12/19/2013 2:42 Truck #5 20 540.00$ P&M Reis 74752 12/19/2013 3:22 Truck #5 20 540.00$ P&M Reis 74752 12/19/2013 7:25 New Mack 20 540.00$ P&M Reis 74752 12/19/2013 8:05 New Mack 20 540.00$ P&M Reis 74752 12/19/2013 2:40 New Mack 20 540.00$ 4,482.00$ Holdgate 49003 12/19/2013 06:53:38AM 1,CAT 966H 21.25 573.75$ Holdgate 49003 12/19/2013 07:00:24AM 1,CAT 966H 22.19 599.13$ Holdgate 49003 12/19/2013 07:32:23AM 1,CAT 966H 23.05 622.35$ Holdgate 49003 12/19/2013 07:37:35AM 1,CAT 966H 23.75 641.25$ 2,436.48$ Holdgate 49049 12/28/2013 06:37:00AM 1,CAT 966H 21.34 576.18$ Holdgate 49049 12/28/2013 06:45:14AM 1,CAT 966H 22.11 596.97$ Holdgate 49049 12/28/2013 07:15:01AM 1,CAT 966H 22.85 616.95$ Holdgate 49049 12/28/2013 07:21:43AM 1,CAT 966H 23.74 640.98$ Holdgate 49049 12/28/2013 07:30:14AM 1,CAT 966H 22.53 608.31$ Holdgate 49049 12/28/2013 07:55:00AM 1,CAT 966H 22.63 611.01$ Holdgate 49049 12/28/2013 8:19:23AM 1,CAT 966H 23.67 639.09$ Holdgate 49049 12/28/2013 8:32:11AM 1,CAT 966H 22.32 602.64$ Holdgate 49049 12/28/2013 9:00:38AM 1,CAT 966H 22.94 619.38$ Holdgate 49049 12/28/2013 09:09:37AM 1,CAT 966H 22.83 616.41$ Holdgate 49049 12/28/2013 9:39:03AM 1,CAT 966H 23.58 636.66$ Holdgate 49049 12/28/2013 9:58:25AM 1,CAT 966H 22.45 606.15$ Holdgate 49049 12/28/2013 10:16:14AM 1,CAT 966H 23.53 635.31$ Holdgate 49049 12/28/2013 10:54:10AM 1,CAT 966H 22.76 614.52$ Holdgate 49049 12/28/2013 11:26:03AM 1,CAT 966H 23.19 626.13$ Holdgate 49049 12/28/2013 11:42:54PM 1,CAT 966H 22.53 608.31$ Holdgate 49049 12/28/2013 12:05:43PM 1,CAT 966H 21.78 588.06$ Holdgate 49049 12/28/2013 12:24:37PM 1,CAT 966H 22.41 605.07$ Holdgate 49049 12/28/2013 12:46:29PM 1,CAT 966H 23.94 646.38$ Holdgate 49049 12/28/2013 01:16:40PM 1,CAT 966H 23.08 623.16$ Holdgate 49049 12/28/2013 01:33:44PM 1,CAT 966H 22.49 607.23$ Holdgate 49049 12/28/2013 01:37:51PM 1,CAT 966H 17.47 471.69$ Holdgate 49049 12/28/2013 01:05:30PM 1,CAT 966H 22.13 597.51$ Holdgate 49049 12/28/2013 02:25:15PM 1,CAT 966H 22.65 611.55$ Holdgate 49049 12/28/2013 02:47:31PM 1,CAT 966H 22.78 615.06$ Page 2 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total Holdgate 49049 12/28/2013 03:07:32PM 1,CAT 966H 23.38 631.26$ Holdgate 49049 12/28/2013 03:20:49PM 1,CAT 966H 23.1 623.70$ 16,475.67$ P&M Reis 74797 12/28/2013 7:30 Tri Axle 22 594.00$ P&M Reis 74797 12/28/2013 8:10 Tri Axle 22 594.00$ P&M Reis 74797 12/28/2013 8:55 Tri Axle 22 594.00$ P&M Reis 74797 12/28/2013 9:35 Tri Axle 22 594.00$ P&M Reis 74797 12/28/2013 10:20 Tri Axle 22 594.00$ P&M Reis 74797 12/28/2013 7:40 New Mack 20 540.00$ P&M Reis 74797 12/28/2013 8:16 New Mack 20 540.00$ P&M Reis 74797 12/28/2013 8:58 New Mack 20 540.00$ P&M Reis 74797 12/28/2013 9:41 New Mack 20 540.00$ P&M Reis 74797 12/28/2013 10:24 New Mack 20 540.00$ 5,670.00$ Holdgate 49055 12/30/2013 07:07:07AM 1,CAT 966H 22.41 605.07$ Holdgate 49055 12/30/2013 07:49:52AM 1,CAT 966H 23.85 643.95$ Holdgate 49055 12/30/2013 08:23:11AM 1,CAT 966H 22.89 618.03$ Holdgate 49055 12/30/2013 09:00:38AM 1,CAT 966H 23.09 623.43$ Holdgate 49055 12/30/2013 09:35:01AM 1,CAT 966H 23.09 623.43$ Holdgate 49055 12/30/2013 10:03:14AM 1,CAT 966H 22.58 609.66$ Holdgate 49055 12/30/2013 10:06:10AM 1,CAT 966H 23.44 632.88$ Holdgate 49055 12/30/2013 10:35L:56AM 1,CAT 966H 23.83 643.41$ Holdgate 49055 12/30/2013 10:41:8AM 1,CAT 966H 24.29 655.83$ Holdgate 49055 12/30/2013 11:09:00AM 1,CAT 966H 23.93 646.11$ Holdgate 49055 12/30/2013 11:18:07AM 1,CAT 966H 22.98 620.46$ Holdgate 49055 12/30/2013 11:38:55AM 1,CAT 966H 23.22 626.94$ Holdgate 49055 12/30/2013 11:50:01AM 1,CAT 966H 24.18 652.86$ Holdgate 49055 12/30/2013 12:09:54PM 1,CAT 966H 23.56 636.12$ Holdgate 49055 12/30/2013 12:21:29PM 1,CAT 966H 23.96 646.92$ Holdgate 49055 12/30/2013 12:40:57PM 1,CAT 966H 23.79 642.33$ Holdgate 49055 12/30/2013 12:53:35PM 1,CAT 966H 24.1 650.70$ Holdgate 49055 12/30/2013 01:14:28PM 1,CAT 966H 23.7 639.90$ Holdgate 49055 12/30/2013 01:25:01PM 1,CAT 966H 24.29 655.83$ Holdgate 49055 12/30/2013 01:45:56Pm 1,CAT 966H 24.56 663.12$ Holdgate 49055 12/30/2013 02:00:34PM 1,CAT 966H 23.11 623.97$ Holdgate 49055 12/30/2013 02:17:45PM 1,CAT 966H 23.03 621.81$ Holdgate 49055 12/30/2013 02:49:00PM 1,CAT 966H 24.85 670.95$ Holdgate 49055 12/30/2013 02:53:49PM 1,CAT 966H 24.23 654.21$ Holdgate 49055 12/30/2013 03:02:56PM 1,CAT 966H 24.4 658.80$ Holdgate 49055 12/30/2013 03:28:54PM 1,CAT 966H 24.23 654.21$ Holdgate 49055 12/30/2013 03:36:44PM 1,CAT 966H 24.1 650.70$ 17,271.63$ P&M Reis 89710 12/30/2013 9:51 Truck #5 20 540.00$ P&M Reis 89710 12/30/2013 10:33 Truck #5 20 540.00$ P&M Reis 89710 12/30/2013 11:18 Truck #5 20 540.00$ P&M Reis 89710 12/30/2013 12:00 Truck #5 20 540.00$ P&M Reis 89710 12/30/2013 12:45 Truck #5 20 540.00$ P&M Reis 89710 12/30/2013 1:31 Truck #5 20 540.00$ P&M Reis 89710 12/30/2013 2:19 Truck #5 20 540.00$ P&M Reis 89710 12/30/2013 3:00 Truck #5 20 540.00$ P&M Reis 89710 12/30/2013 3:43 Truck #5 20 540.00$ P&M Reis 89710 12/30/2013 12:12 Tri Axle 22 594.00$ P&M Reis 89710 12/30/2013 1:03 Tri Axle 22 594.00$ P&M Reis 89710 12/30/2013 1:42 Tri Axle 22 594.00$ P&M Reis 89710 12/30/2013 2:25 Tri Axle 22 594.00$ P&M Reis 89710 12/30/2013 3:10 Tri Axle 22 594.00$ P&M Reis 89710 12/30/2013 3:50 Tri Axle 22 594.00$ P&M Reis 89710 12/30/2013 7:14 New Mack 20 540.00$ P&M Reis 89710 12/30/2013 7:50 New Mack 20 540.00$ P&M Reis 89710 12/30/2013 8:30 New Mack 20 540.00$ P&M Reis 89710 12/30/2013 9:10 New Mack 20 540.00$ P&M Reis 89710 12/30/2013 10:10 New Mack 20 540.00$ P&M Reis 89710 12/30/2013 10:55 New Mack 20 540.00$ P&M Reis 89710 12/30/2013 11:32 New Mack 20 540.00$ P&M Reis 89710 12/30/2013 12:12 New Mack 20 540.00$ 12,744.00$ Holdgate 49061 12/31/2013 07:05:37AM 1,CAT 966H 22.18 598.86$ Holdgate 49061 12/31/2013 07:18:28AM 1,CAT 966H 23.03 621.81$ Holdgate 49061 12/31/2013 07:46:33AM 1,CAT 966H 23.91 645.57$ Holdgate 49061 12/31/2013 07:53:23AM 1,CAT 966H 23.61 637.47$ Holdgate 49061 12/31/2013 08:17:06AM 1,CAT 966H 23.38 631.26$ Holdgate 49061 12/31/2013 08:26:34AM 1,CAT 966H 23.34 630.18$ Holdgate 49061 12/31/2013 08:48:25AM 1,CAT 966H 24 648.00$ Holdgate 49061 12/31/2013 09:04:22AM 1,CAT 966H 23.3 629.10$ Holdgate 49061 12/31/2013 09:21:15AM 1,CAT 966H 24.41 659.07$ Holdgate 49061 12/31/2013 09:38:28am 1,CAT 966H 24.94 673.38$ Page 3 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total Holdgate 49061 12/31/2013 09:59:19AM 1,CAT 966H 23.78 642.06$ Holdgate 49061 12/31/2013 10:12:52A<1,CAT 966H 24.78 669.06$ Holdgate 49061 12/31/2013 10:32:57AM 1,CAT 966H 23.97 647.19$ Holdgate 49061 12/31/2013 11:05:39AM 1,CAT 966H 22.87 617.49$ 8,950.50$ P&M Reis 89719 12/31/2013 7:16 New Mack 20 540.00$ P&M Reis 89719 12/31/2013 7:56 New Mack 20 540.00$ P&M Reis 89719 12/31/2013 8:35 New Mack 20 540.00$ P&M Reis 89719 12/31/2013 9:13 New Mack 20 540.00$ P&M Reis 89719 12/31/2013 9:54 New Mack 20 540.00$ P&M Reis 89719 12/31/2013 7:25 Tri Axle 22 594.00$ P&M Reis 89719 12/31/2013 8:00 Tri Axle 22 594.00$ P&M Reis 89719 12/31/2013 8:40 Tri Axle 22 594.00$ P&M Reis 89719 12/31/2013 9:20 Tri Axle 22 594.00$ P&M Reis 89719 12/31/2013 10:00 Tri Axle 22 594.00$ P&M Reis 89719 12/31/2013 10:59 Tri Axle 22 594.00$ 6,264.00$ Holdgate 49063 1/1/2014 07:11:24Am 1,CAT 966H 21.91 591.57$ Holdgate 49063 1/1/2014 07:14:21AM 1,CAT 966H 21.68 585.36$ Holdgate 49063 1/1/2014 07:48:16AM 1,CAT 966H 22.66 611.82$ Holdgate 49063 1/1/2014 07:52:36AM 1,CAT 966H 22.33 602.91$ Holdgate 49063 1/1/2014 08:24:22AM 1,CAT 966H 22.43 605.61$ Holdgate 49063 1/1/2014 08:27:01AM 1,CAT 966H 23.1 623.70$ Holdgate 49063 1/1/2014 08:56:15AM 1,CAT 966H 22.69 612.63$ Holdgate 49063 1/1/2014 09:02:36AM 1,CAT 966H 22.74 613.98$ Holdgate 49063 1/1/2014 09:30:44AM 1,CAT 966H 23.18 625.86$ Holdgate 49063 1/1/2014 09:33:44AM 1,CAT 966H 22.26 601.02$ Holdgate 49063 1/1/2014 10:04:26AM 1,CAT 966H 21.92 591.84$ Holdgate 49063 1/1/2014 10:08:12AM 1,CAT 966H 23.91 645.57$ Holdgate 49063 1/1/2014 10:31:30AM 1,CAT 966H 23.08 623.16$ Holdgate 49063 1/1/2014 10:36:39AM 1,CAT 966H 25.35 684.45$ Holdgate 49063 1/1/2014 11:01:57AM 1,CAT 966H 25.14 678.78$ Holdgate 49063 1/1/2014 11:10:26am 1,CAT 966H 24.94 673.38$ Holdgate 49063 1/1/2014 11:32:57AM 1,CAT 966H 23.86 644.22$ Holdgate 49063 1/1/2014 11:57:37AM 1,CAT 966H 24.13 651.51$ Holdgate 49063 1/1/2014 12:04:24PM 1,CAT 966H 23.77 641.79$ Holdgate 49063 1/1/2014 12:11:49PM 1,CAT 966H 23.91 645.57$ Holdgate 49063 1/1/2014 12:39:50PM 1,CAT 966H 24.34 657.18$ Holdgate 49063 1/1/2014 12:44:22PM 1,CAT 966H 23.34 630.18$ Holdgate 49063 1/1/2014 01:18:23PM 1,CAT 966H 24.12 651.24$ Holdgate 49063 1/1/2014 01:16:29PM 1,CAT 966H 23.62 637.74$ Holdgate 49063 1/1/2014 01:41:45PM 1,CAT 966H 23 621.00$ Holdgate 49063 1/1/2014 01:49:25PM 1,CAT 966H 23.91 645.57$ 16,397.64$ P&M Reis 89726 1/2/2014 9:14 New Mack 20 540.00$ P&M Reis 89726 1/2/2014 10:28 New Mack 20 540.00$ P&M Reis 89726 1/2/2014 11:05 New Mack 20 540.00$ P&M Reis 89726 1/2/2014 11:41 New Mack 20 540.00$ P&M Reis 89726 1/2/2014 12:20 New Mack 20 540.00$ P&M Reis 89726 1/2/2014 12:55 New Mack 20 540.00$ P&M Reis 89726 1/2/2014 1:35 New Mack 20 540.00$ P&M Reis 89726 1/2/2014 2:12 New Mack 20 540.00$ P&M Reis 89726 1/2/2014 10:52 AJ 16 432.00$ P&M Reis 89726 1/2/2014 11:36 AJ 16 432.00$ P&M Reis 89726 1/2/2014 12:15 AJ 16 432.00$ P&M Reis 89726 1/2/2014 12:48 AJ 16 432.00$ P&M Reis 89726 1/2/2014 1:30 AJ 16 432.00$ P&M Reis 89726 1/2/2014 2:10 AJ 16 432.00$ P&M Reis 89726 1/2/2014 8:55 Truck # 12 16 432.00$ P&M Reis 89726 1/2/2014 9:35 Truck # 12 16 432.00$ P&M Reis 89726 1/2/2014 10:36 Truck #12 16 432.00$ P&M Reis 89726 1/2/2014 11:15 Truck #12 16 432.00$ P&M Reis 89726 1/2/2014 11:53 Truck #12 16 432.00$ P&M Reis 89726 1/2/2014 12:35 Truck #12 16 432.00$ P&M Reis 89726 1/2/2014 1:15 Truck #12 16 432.00$ P&M Reis 89726 1/2/2014 1:49 Truck #12 16 432.00$ P&M Reis 89726 1/2/2014 8:09 Truck #5 20 540.00$ P&M Reis 89726 1/2/2014 9:00 Truck #5 20 540.00$ P&M Reis 89726 1/2/2014 9:40 Truck #5 20 540.00$ P&M Reis 89726 1/2/2014 10:35 Truck #5 20 540.00$ P&M Reis 89726 1/2/2014 11:14 Truck #5 20 540.00$ P&M Reis 89726 1/2/2014 11:57 Truck #5 20 540.00$ P&M Reis 89726 1/2/2014 12:25 Truck #5 20 540.00$ P&M Reis 89726 1/2/2014 1:13 Truck #5 20 540.00$ P&M Reis 89726 1/2/2014 1:47 Truck #5 20 540.00$ Page 4 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 89726 1/2/2014 8:24 Tri Axle 22 594.00$ P&M Reis 89726 1/2/2014 9:01 Tri Axle 22 594.00$ P&M Reis 89726 1/2/2014 9:42 Tri Axle 22 594.00$ P&M Reis 89726 1/2/2014 10:36 Tri Axle 22 594.00$ P&M Reis 89726 1/2/2014 10:22 Tri Axle 22 594.00$ P&M Reis 89726 1/2/2014 12:05 Tri Axle 22 594.00$ P&M Reis 89726 1/2/2014 12:45 Tri Axle 22 594.00$ P&M Reis 89726 1/2/2014 1:23 Tri Axle 22 594.00$ P&M Reis 89726 1/2/2014 1:58 Tri Axle 22 594.00$ 20,574.00$ P&M Reis 89744 1/4/2014 11:45 Truck # 12 16 432.00$ P&M Reis 89744 1/4/2014 12:30 Truck # 12 16 432.00$ P&M Reis 89744 1/4/2014 1:10 Truck # 12 16 432.00$ P&M Reis 89744 1/4/2014 1:53 Truck # 12 16 432.00$ P&M Reis 89744 1/4/2014 2:33 Truck # 12 16 432.00$ P&M Reis 89744 1/4/2014 3:10 Truck # 12 16 432.00$ P&M Reis 89744 1/4/2014 3:53 Truck # 12 16 432.00$ P&M Reis 89744 1/4/2014 10:00 New Mack 20 540.00$ P&M Reis 89744 1/4/2014 10:41 New Mack 20 540.00$ P&M Reis 89744 1/4/2014 11:22 New Mack 20 540.00$ P&M Reis 89744 1/4/2014 12:00 New Mack 20 540.00$ P&M Reis 89744 1/4/2014 12:39 New Mack 20 540.00$ P&M Reis 89744 1/4/2014 1:18 New Mack 20 540.00$ P&M Reis 89744 1/4/2014 2:03 New Mack 20 540.00$ P&M Reis 89744 1/4/2014 2:45 New Mack 20 540.00$ P&M Reis 89744 1/4/2014 3:33 New Mack 20 540.00$ P&M Reis 89744 1/4/2014 4:10 New Mack 20 540.00$ P&M Reis 89744 1/4/2014 10:58 Truck #5 20 540.00$ P&M Reis 89744 1/4/2014 11:42 Truck #5 20 540.00$ P&M Reis 89744 1/4/2014 12:27 Truck #5 20 540.00$ P&M Reis 89744 1/4/2014 1:15 Truck #5 20 540.00$ P&M Reis 89744 1/4/2014 1:56 Truck #5 20 540.00$ P&M Reis 89744 1/4/2014 2:36 Truck #5 20 540.00$ P&M Reis 89744 1/4/2014 3:20 Truck #5 20 540.00$ P&M Reis 89744 1/4/2014 4:04 Truck #5 20 540.00$ P&M Reis 89744 1/4/2014 10:09 Tri Axle 22 594.00$ P&M Reis 89744 1/4/2014 10:49 Tri Axle 22 594.00$ P&M Reis 89744 1/4/2014 11:36 Tri Axle 22 594.00$ P&M Reis 89744 1/4/2014 12:18 Tri Axle 22 594.00$ P&M Reis 89744 1/4/2014 1:00 Tri Axle 22 594.00$ P&M Reis 89744 1/4/2014 1:45 Tri Axle 22 594.00$ P&M Reis 89744 1/4/2014 2:28 Tri Axle 22 594.00$ P&M Reis 89744 1/4/2014 3:15 Tri Axle 22 594.00$ P&M Reis 89744 1/4/2014 4:00 Tri Axle 22 594.00$ P&M Reis 89744 1/4/2014 11:20 AJ 16 432.00$ P&M Reis 89744 1/4/2014 12:07 AJ 16 432.00$ P&M Reis 89744 1/4/2014 12:05 AJ 16 432.00$ P&M Reis 89744 1/4/2014 1:34 AJ 16 432.00$ P&M Reis 89744 1/4/2014 2:20 AJ 16 432.00$ P&M Reis 89744 1/4/2014 3:05 AJ 16 432.00$ P&M Reis 89744 1/4/2014 3:48 AJ 16 432.00$ P&M Reis 89744 1/4/2014 2:15 JasonD 18 486.00$ P&M Reis 89744 1/4/2014 2:53 JasonD 18 486.00$ P&M Reis 89744 1/4/2014 3:38 JasonD 18 486.00$ 22,572.00$ Holdgate 49073 1/4/2014 10:01:50AM 1,CAT 966H 21.86 590.22$ Holdgate 49073 1/4/2014 10:18:27AM 1C 22.65 611.55$ Holdgate 49073 1/4/2014 10:46::11AM 1,CAT 966H 23.83 643.41$ Holdgate 49073 1/4/2014 10:57:46AM 1,CAT 966H 23.08 623.16$ Holdgate 49073 1/4/2014 11:38:10AM 1,CAT 966H 23.53 635.31$ Holdgate 49073 1/4/2014 11:41:46AM 1,CAT 966H 23.62 637.74$ Holdgate 49073 1/4/2014 12:20:41PM 1,CAT 966H 22.92 618.84$ Holdgate 49073 1/4/2014 12:38:11PM 1,CAT 966H 22.88 617.76$ Holdgate 49073 1/4/2014 01:03:44PM 1,CAT 966H 22.76 614.52$ Holdgate 49073 1/4/2014 01:10:17PM 1,CAT 966H 23.89 645.03$ Holdgate 49073 1/4/2014 01:32:13PM 1,CAT 966H 17.94 484.38$ Holdgate 49073 1/4/2014 01:42:45PM 1,CAT 966H 23.28 628.56$ Holdgate 49073 1/4/2014 01:55:35PM 1,CAT 966H 22.53 608.31$ Holdgate 49073 1/4/2014 02:12:10PM 1,CAT 966H 17.49 472.23$ Holdgate 49073 1/4/2014 02:30:21PM 1,CAT 966H 24.47 660.69$ Holdgate 49073 1/4/2014 02:35:25PM 1,CAT 966H 25.58 636.66$ Holdgate 49073 1/4/2014 02:57:06PM 1,CAT 966H 18.83 508.41$ Holdgate 49073 1/4/2014 03:07:20PM 1,CAT 966H 23.76 641.52$ Holdgate 49073 1/4/2014 03:14:45PM 1,CAT 966H 24.3 656.10$ 11,534.40$ Page 5 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 89745 1/5/2014 7:49 Truck #5 20 540.00$ P&M Reis 89745 1/5/2014 8:34 Truck #5 20 540.00$ P&M Reis 89745 1/5/2014 9:18 Truck #5 20 540.00$ P&M Reis 89745 1/5/2014 10:00 Truck #5 20 540.00$ P&M Reis 89745 1/5/2014 10:42 Truck #5 20 540.00$ P&M Reis 89745 1/5/2014 11:29 Truck #5 20 540.00$ P&M Reis 89745 1/5/2014 13:30 Truck #5 20 540.00$ P&M Reis 89745 1/5/2014 1:08 Truck #5 20 540.00$ P&M Reis 89745 1/5/2014 1:50 Truck #5 20 540.00$ P&M Reis 89745 1/5/2014 8:45 Truck #12 16 432.00$ P&M Reis 89745 1/5/2014 9:35 Truck #12 16 432.00$ P&M Reis 89745 1/5/2014 10:20 Truck #12 16 432.00$ P&M Reis 89745 1/5/2014 11:07 Truck #12 16 432.00$ P&M Reis 89745 1/5/2014 11:55 Truck #12 16 432.00$ P&M Reis 89745 1/5/2014 7:40 New Mack 20 540.00$ P&M Reis 89745 1/5/2014 8:20 New Mack 20 540.00$ P&M Reis 89745 1/5/2014 9:01 New Mack 20 540.00$ P&M Reis 89745 1/5/2014 9:48 New Mack 20 540.00$ P&M Reis 89745 1/5/2014 10:33 New Mack 20 540.00$ P&M Reis 89745 1/5/2014 11:18 New Mack 20 540.00$ P&M Reis 89745 1/5/2014 12:50 New Mack 20 540.00$ P&M Reis 89745 1/5/2014 1:35 New Mack 20 540.00$ P&M Reis 89745 1/5/2014 8:05 Tri Axle 22 594.00$ P&M Reis 89745 1/5/2014 8:49 Tri Axle 22 594.00$ P&M Reis 89745 1/5/2014 9:27 Tri Axle 22 594.00$ P&M Reis 89745 1/5/2014 10:54 Tri Axle 22 594.00$ P&M Reis 89745 1/5/2014 11:36 Tri Axle 22 594.00$ 14,310.00$ Holdgate 49099 1/6/2014 07:16:52AM 1,CAT 966H 22.74 613.98$ Holdgate 49099 1/6/2014 07:50:09AM 1,CAT 966H 23.6 637.20$ Holdgate 49099 1/6/2014 08:23:43AM 1,CAT 966H 23.7 639.90$ Holdgate 49099 1/6/2014 08:59:30AM 1,CAT 966H 24.63 665.01$ Holdgate 49099 1/6/2014 09:35:49AM 1,CAT 966H 24.1 650.70$ Holdgate 49099 1/6/2014 10:09:18AM 1,CAT 966H 24.38 658.26$ Holdgate 49099 1/6/2014 10:42:21AM 1,CAT 966H 23.58 636.66$ Holdgate 49099 1/6/2014 01:06:57PM 1,CAT 966H 23.93 646.11$ Holdgate 49099 1/6/2014 01:41:09PM 1,CAT 966H 23.98 647.46$ Holdgate 49099 1/6/2014 02:06:37P,1,CAT 966H 24.1 650.70$ Holdgate 49099 1/6/2014 02:14:14PM 1,CAT 966H 23.6 637.20$ 7,083.18$ P&M Reis 91401 1/6/2014 1:10 Truck#5 20 540.00$ P&M Reis 91401 1/6/2014 1:45 Truck#5 20 540.00$ P&M Reis 91401 1/6/2014 2:29 Truck#5 20 540.00$ P&M Reis 91401 1/6/2014 7:30 New Mack 20 540.00$ P&M Reis 91401 1/6/2014 8:18 New Mack 20 540.00$ P&M Reis 91401 1/6/2014 9:04 New Mack 20 540.00$ P&M Reis 91401 1/6/2014 9:47 New Mack 20 540.00$ P&M Reis 91401 1/6/2014 10:28 New Mack 20 540.00$ P&M Reis 91401 1/6/2014 11:10 New Mack 20 540.00$ P&M Reis 91401 1/6/2014 12:45 New Mack 20 540.00$ P&M Reis 91401 1/6/2014 1:24 New Mack 20 540.00$ P&M Reis 91401 1/6/2014 2:01 New Mack 20 540.00$ P&M Reis 91401 1/6/2014 2:41 New Mack 20 540.00$ P&M Reis 91401 1/6/2014 7:36 Tri Axle 22 594.00$ P&M Reis 91401 1/6/2014 8:45 Tri Axle 22 594.00$ P&M Reis 91401 1/6/2014 9:29 Tri Axle 22 594.00$ P&M Reis 91401 1/6/2014 10:05 Tri Axle 22 594.00$ 9,396.00$ Holdgate 49130 1/8/2014 07:09:32AM 1,CAT 966H 23.77 641.79$ Holdgate 49130 1/8/2014 07:07:36AM 1,CAT 966H 22.25 600.75$ Holdgate 49130 1/8/2014 07:51:37AM 1,CAT 966H 23.16 625.32$ Holdgate 49130 1/8/2014 07:57:50AM 1,CAT 966H 22.8 615.60$ Holdgate 49130 1/8/2014 08:32:02AM 1,CAT 966H 22.43 605.61$ Holdgate 49130 1/8/2014 08:45:31AM 1,CAT 966H 23.56 636.12$ Holdgate 49130 1/8/2014 09:07:46AM 1,CAT 966H 22.89 618.03$ Holdgate 49130 1/8/2014 09:19:13AM 1,CAT 966H 23.64 638.28$ Holdgate 49130 1/8/2014 09:39:50AM 1,CAT 966H 23.19 626.13$ Holdgate 49130 1/8/2014 09:53:58AM 1,CAT 966H 22.87 617.49$ Holdgate 49130 1/8/2014 10:11:34AM 1,CAT 966H 24.2 653.40$ Holdgate 49130 1/8/2014 10:30:08AM 1,CAT 966H 23.69 639.63$ Holdgate 49130 1/8/2014 10:49:37AM 1,CAT 966H 23.51 634.77$ Holdgate 49130 1/8/2014 11:09:08AM 1,CAT 966H 23.27 628.29$ Holdgate 49130 1/8/2014 11:24:07AM 1,CAT 966H 23.04 622.08$ Holdgate 49130 1/8/2014 11:45:56AM 1,CAT 966H 22.53 608.31$ Holdgate 49130 1/8/2014 12:04:26PM 1,CAT 966H 23.49 634.23$ Page 6 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total Holdgate 49130 1/8/2014 12:18:02PM 1,CAT 966H 23.88 644.76$ Holdgate 49130 1/8/2014 12:37:23PM 1,CAT 966H 23.87 644.49$ Holdgate 49130 1/8/2014 12:57:29PM 1,CAT 966H 23.99 647.73$ Holdgate 49130 1/8/2014 01:10:46PM 1,CAT 966H 23.87 644.49$ Holdgate 49130 1/8/2014 01:30:32PM 1,CAT 966H 23.45 633.15$ Holdgate 49130 1/8/2014 01:43:37PM 1,CAT 966H 22.97 620.19$ Holdgate 49130 1/8/2014 02:07:49PM 1,CAT 966H 22.91 618.57$ Holdgate 49130 1/8/2014 06:16:57PM 1,CAT 966H 23.11 623.97$ Holdgate 49130 1/8/2014 2:31:36 1,CAT 966H 22.24 489.28$ Holdgate 49130 1/8/2014 02:50:31PM 1,CAT 966H 23.16 625.32$ Holdgate 49130 1/8/2014 03:16:45PM 1,CAT 966H 23.17 625.59$ 17,463.37$ P&M Reis 91371 1/8/2014 7:26 New Mack 20 540.00$ P&M Reis 91371 1/8/2014 8:03 New Mack 20 540.00$ P&M Reis 91371 1/8/2014 8:41 New Mack 20 540.00$ P&M Reis 91371 1/8/2014 9:15 New Mack 20 540.00$ P&M Reis 91371 1/8/2014 9:58 New Mack 20 540.00$ P&M Reis 91371 1/8/2014 10:40 New Mack 20 540.00$ P&M Reis 91371 1/8/2014 11:15 New Mack 20 540.00$ P&M Reis 91371 1/8/2014 11:51 New Mack 20 540.00$ P&M Reis 91371 1/8/2014 12:26 New Mack 20 540.00$ P&M Reis 91371 1/8/2014 1:06 New Mack 20 540.00$ P&M Reis 91371 1/8/2014 1:37 New Mack 20 540.00$ P&M Reis 91371 1/8/2014 2:15 New Mack 20 540.00$ P&M Reis 91371 1/8/2014 2:51 New Mack 20 540.00$ P&M Reis 91371 1/8/2014 3:26 New Mack 20 540.00$ P&M Reis 91371 1/8/2014 4:03 New Mack 20 540.00$ P&M Reis 91371 1/8/2014 4:38 New Mack 20 540.00$ P&M Reis 91371 1/8/2014 7:19 Tri Axle 22 594.00$ P&M Reis 91371 1/8/2014 8:03 Tri Axle 22 594.00$ P&M Reis 91371 1/8/2014 8:40 Tri Axle 22 594.00$ P&M Reis 91371 1/8/2014 9:16 Tri Axle 22 594.00$ P&M Reis 91371 1/8/2014 9:55 Tri Axle 22 594.00$ P&M Reis 91371 1/8/2014 10:32 Tri Axle 22 594.00$ P&M Reis 91371 1/8/2014 11:07 Tri Axle 22 594.00$ P&M Reis 91371 1/8/2014 12:35 Tri Axle 22 594.00$ P&M Reis 91371 1/8/2014 1:09 Tri Axle 22 594.00$ P&M Reis 91371 1/8/2014 1:45 Tri Axle 22 594.00$ P&M Reis 91371 1/8/2014 2:22 Tri Axle 22 594.00$ P&M Reis 91371 1/8/2014 2:57 Tri Axle 22 594.00$ P&M Reis 91371 1/8/2014 3:35 Tri Axle 22 594.00$ P&M Reis 91371 1/8/2014 4:12 Tri Axle 22 594.00$ 16,956.00$ Holdgate 49167 1/10/2014 07:12:46AM 1,CAT 966H 22.95 619.65$ Holdgate 49167 1/10/2014 07:21:32AM 1,CAT 966H 23.32 629.64$ Holdgate 49167 1/10/2014 07:59:28AM 1,CAT 966H 23.07 622.89$ Holdgate 49167 1/10/2014 08:10:55AM 1,CAT 966H 23.69 639.63$ Holdgate 49167 1/10/2014 08:51:16AM 1,CAT 966H 23.87 644.49$ Holdgate 49167 1/10/2014 09:05:06AM 1,CAT 966H 24.05 649.35$ Holdgate 49167 1/10/2014 09:29:25AM 1,CAT 966H 23.61 637.47$ Holdgate 49167 1/10/2014 09:41:28AM 1,CAT 966H 23.14 624.78$ Holdgate 49167 1/10/2014 10:14:28AM 1,CAT 966H 24.22 653.94$ Holdgate 49167 1/10/2014 10:18:44AM 1,CAT 966H 24.29 655.83$ Holdgate 49167 1/10/2014 10:51:22AM 1,CAT 966H 23.54 635.58$ Holdgate 49167 1/10/2014 10:55:46AM 1,CAT 966H 23.9 645.30$ Holdgate 49167 1/10/2014 11:30:22AM 1,CAT 966H 24.1 650.70$ Holdgate 49167 1/10/2014 01:10:00PM 1,CAT 966H 24.31 656.37$ Holdgate 49167 1/10/2014 01:48:37PM 1,CAT 966H 23.33 629.91$ 9,595.53$ P&M Reis 91440 1/10/2014 7:30 New Mack 20 540.00$ P&M Reis 91440 1/10/2014 8:14 New Mack 20 540.00$ P&M Reis 91440 1/10/2014 8:58 New Mack 20 540.00$ P&M Reis 91440 1/10/2014 9:35 New Mack 20 540.00$ P&M Reis 91440 1/10/2014 10:12 New Mack 20 540.00$ P&M Reis 91440 1/10/2014 10:48 New Mack 20 540.00$ P&M Reis 91440 1/10/2014 11:39 New Mack 20 540.00$ P&M Reis 91440 1/10/2014 12:18 New Mack 20 540.00$ P&M Reis 91440 1/10/2014 1:05 New Mack 20 540.00$ P&M Reis 91440 1/10/2014 1:40 New Mack 20 540.00$ P&M Reis 91440 1/10/2014 2:13 New Mack 20 540.00$ P&M Reis 91440 1/10/2014 7:39 Tri Axle 22 594.00$ P&M Reis 91440 1/10/2014 8:31 Tri Axle 22 594.00$ P&M Reis 91440 1/10/2014 9:16 Tri Axle 22 594.00$ P&M Reis 91440 1/10/2014 9:59 Tri Axle 22 594.00$ P&M Reis 91440 1/10/2014 10:36 Tri Axle 22 594.00$ Page 7 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 91440 1/10/2014 11:58 Tri Axle 22 594.00$ P&M Reis 91440 1/10/2014 12:26 Tri Axle 22 594.00$ P&M Reis 91440 1/10/2014 1:14 Tri Axle 22 594.00$ P&M Reis 91440 1/10/2014 1:54 Tri Axle 22 594.00$ 11,286.00$ Holdgate 49168 1/11/2014 07:07:27AM 1,CAT 966H 22.77 614.79$ Holdgate 49168 1/11/2014 07:14:54AM 1,CAT 966H 23.66 638.82$ Holdgate 49168 1/11/2014 07:49:51AM 1,CAT 966H 23.98 647.46$ Holdgate 49168 1/11/2014 07:54:05AM 1,CAT 966H 23.06 622.62$ Holdgate 49168 1/11/2014 08:24:21AM 1,CAT 966H 24.24 654.48$ Holdgate 49168 1/11/2014 08:28:31AM 1,CAT 966H 24.12 651.24$ Holdgate 49168 1/11/2014 09:01:22AM 1,CAT 966H 24 648.00$ Holdgate 49168 1/11/2014 09:04:34AM 1,CAT 966H 22.93 619.11$ Holdgate 49168 1/11/2014 09:35:35AM 1,CAT 966H 23.81 642.87$ Holdgate 49168 1/11/2014 09:38:40AM 1,CAT 966H 23.66 638.82$ Holdgate 49168 1/11/2014 10:10:39AM 1,CAT 966H 23.42 632.34$ Holdgate 49168 1/11/2014 10:13:49AM 1,CAT 966H 23.84 643.68$ Holdgate 49168 1/11/2014 10:43:49AM 1,CAT 966H 24.82 670.14$ Holdgate 49168 1/11/2014 10:50:23AM 1,CAT 966H 24.06 649.62$ Holdgate 49168 1/11/2014 11:17:30AM 1,CAT 966H 24.48 660.69$ Holdgate 49168 1/11/2014 11:23:43AM 1,CAT 966H 23.96 646.92$ Holdgate 49168 1/11/2014 11:55:14AM 1,CAT 966H 23.99 647.73$ Holdgate 49168 1/11/2014 12:06:40PM 1,CAT 966H 23.19 626.13$ Holdgate 49168 1/11/2014 12:31:32PM 1,CAT 966H 24.7 666.90$ Holdgate 49168 1/11/2014 12:38:29PM 1,CAT 966H 22.66 611.82$ Holdgate 49168 1/11/2014 01:02:06PM 1,CAT 966H 23.98 647.46$ Holdgate 49168 1/11/2014 01:11:01PM 1,CAT 966H 24.04 649.08$ Holdgate 49168 1/11/2014 01:34:48PM 1,CAT 966H 24.13 651.51$ Holdgate 49168 1/11/2014 01:45:30PM 1,CAT 966H 24.03 648.81$ Holdgate 49168 1/11/2014 02:06:35PM 1,CAT 966H 25.5 688.50$ Holdgate 49168 1/11/2014 02:17:59PM 1,CAT 966H 25.67 693.09$ 16,812.90$ P&M Reis 91442 1/11/2014 7:20 New Mack 20 540.00$ P&M Reis 91442 1/11/2014 7:59 New Mack 20 540.00$ P&M Reis 91442 1/11/2014 8:34 New Mack 20 540.00$ P&M Reis 91442 1/11/2014 9:08 New Mack 20 540.00$ P&M Reis 91442 1/11/2014 9:45 New Mack 20 540.00$ P&M Reis 91442 1/11/2014 10:20 New Mack 20 540.00$ P&M Reis 91442 1/11/2014 10:57 New Mack 20 540.00$ P&M Reis 91442 1/11/2014 11:31 New Mack 20 540.00$ P&M Reis 91442 1/11/2014 12:08 New Mack 20 540.00$ P&M Reis 91442 1/11/2014 12:41 New Mack 20 540.00$ P&M Reis 91442 1/11/2014 1:19 New Mack 20 540.00$ P&M Reis 91442 1/11/2014 1:58 New Mack 20 540.00$ P&M Reis 91442 1/11/2014 2:33 New Mack 20 540.00$ P&M Reis 91442 1/11/2014 3:12 New Mack 20 540.00$ P&M Reis 91442 1/11/2014 7:25 Tri Axle 22 594.00$ P&M Reis 91442 1/11/2014 8:10 Tri Axle 22 594.00$ P&M Reis 91442 1/11/2014 8:42 Tri Axle 22 594.00$ P&M Reis 91442 1/11/2014 9:18 Tri Axle 22 594.00$ P&M Reis 91442 1/11/2014 9:53 Tri Axle 22 594.00$ P&M Reis 91442 1/11/2014 10:30 Tri Axle 22 594.00$ P&M Reis 91442 1/11/2014 11:04 Tri Axle 22 594.00$ P&M Reis 91442 1/11/2014 11:40 Tri Axle 22 594.00$ P&M Reis 91442 1/11/2014 12:16 Tri Axle 22 594.00$ P&M Reis 91442 1/11/2014 12:55 Tri Axle 22 594.00$ P&M Reis 91442 1/11/2014 1:30 Tri Axle 22 594.00$ P&M Reis 91442 1/11/2014 2:03 Tri Axle 22 594.00$ P&M Reis 91442 1/11/2014 2:42 Tri Axle 22 594.00$ P&M Reis 91442 1/11/2014 3:18 Tri Axle 22 594.00$ 15,876.00$ Holdgate 49169 1/12/2014 08:03:08am 1,CAT 966H 23.61 637.47$ Holdgate 49169 1/12/2014 08:06:52am 1,CAT 966H 25.16 679.32$ Holdgate 49169 1/12/2014 08:37:15am 1,CAT 966H 24.98 674.46$ Holdgate 49169 1/12/2014 08:40:333am 1,CAT 966H 24.53 662.31$ Holdgate 49169 1/12/2014 09:10:27AM 1,CAT 966H 24.12 651.24$ Holdgate 49169 1/12/2014 09:13:40am 1,CAT 966H 24.4 658.80$ Holdgate 49169 1/12/2014 09:41:26am 1,CAT 966H 24.4 658.80$ Holdgate 49169 1/12/2014 09:45:17am 1,CAT 966H 25.72 694.44$ Holdgate 49169 1/12/2014 10:12:45AM 1,CAT 966H 24.35 657.45$ Holdgate 49169 1/12/2014 10:17:03AM 1,CAT 966H 23.83 643.41$ Holdgate 49169 1/12/2014 10:42:32am 1,CAT 966H 24.43 659.61$ Holdgate 49169 1/12/2014 10:46:50am 1,CAT 966H 24.15 652.05$ Holdgate 49169 1/12/2014 11:13:27am 1,CAT 966H 24.59 663.93$ Holdgate 49169 1/12/2014 11:17:25AM 1,CAT 966H 23.47 633.69$ Page 8 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total Holdgate 49169 1/12/2014 11:44:16AM 1,CAT 966H 24.67 666.09$ Holdgate 49169 1/12/2014 11:47:11am 1,CAT 966H 24.35 657.45$ Holdgate 49169 1/12/2014 12:17:23pm 1,CAT 966H 24.14 651.78$ Holdgate 49169 1/12/2014 12:20:19pm 1,CAT 966H 23.89 645.03$ Holdgate 49169 1/12/2014 12:48:05pm 1,CAT 966H 24.55 662.85$ Holdgate 49169 1/12/2014 12:52:11pm 1,CAT 966H 24.78 669.06$ Holdgate 49169 1/12/2014 01:20:45pm 1,CAT 966H 24.81 669.87$ Holdgate 49169 1/12/2014 01:24:52pm 1,CAT 966H 25.81 696.87$ Holdgate 49169 1/12/2014 01:52:48pm 1,CAT 966H 25.63 692.01$ Holdgate 49169 1/12/2014 01:59:43pm 1,CAT 966H 24.52 662.04$ Holdgate 49169 1/12/2014 02:24:57pm 1,CAT 966H 24.75 668.25$ Holdgate 49169 1/12/2014 02:30:12pm 1,CAT 966H 25.02 675.54$ 17,243.82$ P&M Reis 91441 1/12/2014 6:45 New Mack 20 540.00$ P&M Reis 91441 1/12/2014 7:31 New Mack 20 540.00$ P&M Reis 91441 1/12/2014 8:07 New Mack 20 540.00$ P&M Reis 91441 1/12/2014 8:43 New Mack 20 540.00$ P&M Reis 91441 1/12/2014 9:18 New Mack 20 540.00$ P&M Reis 91441 1/12/2014 10:00 New Mack 20 540.00$ P&M Reis 91441 1/12/2014 10:37 New Mack 20 540.00$ P&M Reis 91441 1/12/2014 11:15 New Mack 20 540.00$ P&M Reis 91441 1/12/2014 11:50 New Mack 20 540.00$ P&M Reis 91441 1/12/2014 12:28 New Mack 20 540.00$ P&M Reis 91441 1/12/2014 1:10 New Mack 20 540.00$ P&M Reis 91441 1/12/2014 1:50 New Mack 20 540.00$ P&M Reis 91441 1/12/2014 7:25 Tri Axle 22 594.00$ P&M Reis 91441 1/12/2014 8:00 Tri Axle 22 594.00$ P&M Reis 91441 1/12/2014 8:32 Tri Axle 22 594.00$ P&M Reis 91441 1/12/2014 9:08 Tri Axle 22 594.00$ P&M Reis 91441 1/12/2014 9:40 Tri Axle 22 594.00$ P&M Reis 91441 1/12/2014 10:15 Tri Axle 22 594.00$ P&M Reis 91441 1/12/2014 10:50 Tri Axle 22 594.00$ P&M Reis 91441 1/12/2014 11:27 Tri Axle 22 594.00$ P&M Reis 91441 1/12/2014 12:07 Tri Axle 22 594.00$ P&M Reis 91441 1/12/2014 1:30 Tri Axle 22 594.00$ P&M Reis 91441 1/12/2014 1:50 Tri Axle 22 594.00$ 13,554.00$ Holdgate 49188 1/13/2014 07:14:09AM 1,CAT 966H 23.23 627.21$ Holdgate 49188 1/13/2014 07:17:35AM 1,CAT 966H 23.3 629.10$ Holdgate 49188 1/13/2014 07:47:50AM 1,CAT 966H 23.52 635.04$ Holdgate 49188 1/13/2014 07:54:57AM 1,CAT 966H 24.51 661.77$ Holdgate 49188 1/13/2014 08:23:16AM 1,CAT 966H 24.2 653.40$ Holdgate 49188 1/13/2014 08:37:07AM 1,CAT 966H 24.45 660.15$ Holdgate 49188 1/13/2014 10:37:04AM 1,CAT 966H 23.51 634.77$ Holdgate 49188 1/13/2014 10:40:42AM 1,CAT 966H 19.24 519.48$ Holdgate 49188 1/13/2014 10:45:05AM 1,CAT 966H 23.7 639.90$ Holdgate 49188 1/13/2014 11:09:10AM 1,CAT 966H 24 648.00$ Holdgate 49188 1/13/2014 11:16:42AM 1,CAT 966H 18.62 502.74$ Holdgate 49188 1/13/2014 11:21:13AM 1,CAT 966H 24.54 662.58$ Holdgate 49188 1/13/2014 11:43:02AM 1,CAT 966H 24.4 658.80$ Holdgate 49188 1/13/2014 11:53:24AM 1,CAT 966H 17.98 485.46$ Holdgate 49188 1/13/2014 11:57:59AM 1,CAT 966H 23.65 638.55$ Holdgate 49188 1/13/2014 12:13:43PM 1,CAT 966H 24.5 661.50$ Holdgate 49188 1/13/2014 12:27:01PM 1,CAT 966H 17.47 471.69$ Holdgate 49188 1/13/2014 12:30:54PM 1,CAT 966H 18.27 493.29$ Holdgate 49188 1/13/2014 12:34:27PM 1,CAT 966H 24.81 669.87$ Holdgate 49188 1/13/2014 12:46:28PM 1,CAT 966H 24.14 651.78$ Holdgate 49188 1/13/2014 12:58:15PM 1,CAT 966H 18.97 512.19$ Holdgate 49188 1/13/2014 01:05:52PM 1,CAT 966H 18.67 504.09$ Holdgate 49188 1/13/2014 01:09:23PM 1,CAT 966H 23.34 630.18$ Holdgate 49188 1/13/2014 01:21:08PM 1,CAT 966H 25.16 679.32$ Holdgate 49188 1/13/2014 01:32:55PM 1,CAT 966H 18.07 487.89$ Holdgate 49188 1/13/2014 01:41:54PM 1,CAT 966H 18.5 499.50$ Holdgate 49188 1/13/2014 01:45:26PM 1,CAT 966H 22.84 616.68$ Holdgate 49188 1/13/2014 01:57:14PM 1,CAT 966H 23.87 644.49$ Holdgate 49188 1/13/2014 02:06:04PM 1,CAT 966H 18.79 507.33$ Holdgate 49188 1/13/2014 02:17:30PM 1,CAT 966H 18.06 487.62$ Holdgate 49188 1/13/2014 02:23:15PM 1,CAT 966H 23.57 636.39$ Holdgate 49188 1/13/2014 02:32:55PM 1,CAT 966H 23.75 641.25$ Holdgate 49188 1/13/2014 02:45:26PM 1,CAT 966H 18.6 502.20$ 19,554.21$ P&M Reis 91448 1/13/2014 12:16 Truck #5 20 540.00$ P&M Reis 91448 1/13/2014 12:45 Truck #5 20 540.00$ P&M Reis 91448 1/13/2014 1:18 Truck #5 20 540.00$ P&M Reis 91448 1/13/2014 1:55 Truck #5 20 540.00$ Page 9 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 91448 1/13/2014 2:31 Truck #5 20 540.00$ P&M Reis 91448 1/13/2014 7:10 New Mack 20 540.00$ P&M Reis 91448 1/13/2014 7:54 New Mack 20 540.00$ P&M Reis 91448 1/13/2014 8:31 New Mack 20 540.00$ P&M Reis 91448 1/13/2014 10:48 New Mack 20 540.00$ P&M Reis 91448 1/13/2014 11:25 New Mack 20 540.00$ P&M Reis 91448 1/13/2014 12:00 New Mack 20 540.00$ P&M Reis 91448 1/13/2014 12:33 New Mack 20 540.00$ P&M Reis 91448 1/13/2014 1:00 New Mack 20 540.00$ P&M Reis 91448 1/13/2014 1:35 New Mack 20 540.00$ P&M Reis 91448 1/13/2014 2:10 New Mack 20 540.00$ P&M Reis 91448 1/13/2014 2:45 New Mack 20 540.00$ P&M Reis 91448 1/13/2014 7:35 Tri Axle 22 594.00$ P&M Reis 91448 1/13/2014 8:19 Tri Axle 22 594.00$ P&M Reis 91448 1/13/2014 10:58 Tri Axle 22 594.00$ P&M Reis 91448 1/13/2014 11:30 Tri Axle 22 594.00$ P&M Reis 91448 1/13/2014 12:04 Tri Axle 22 594.00$ P&M Reis 91448 1/13/2014 12:32 Tri Axle 22 594.00$ P&M Reis 91448 1/13/2014 1:06 Tri Axle 22 594.00$ P&M Reis 91448 1/13/2014 1:42 Tri Axle 22 594.00$ P&M Reis 91448 1/13/2014 2:15 Tri Axle 22 594.00$ P&M Reis 91448 1/13/2014 2:50 Tri Axle 22 594.00$ 14,580.00$ Holdgate 49207 1/14/2014 09:57:56AM 1,CAT 966H 18.95 511.65$ Holdgate 49207 1/14/2014 10:04:32AM 1,CAT 966H 22.52 608.04$ Holdgate 49207 1/14/2014 10:07:36AM 1,CAT 966H 23.34 630.18$ Holdgate 49207 1/14/2014 10:29:23AM 1,CAT 966H 17.51 472.77$ Holdgate 49207 1/14/2014 10:37:08AM 1,CAT 966H 23.46 633.42$ Holdgate 49207 1/14/2014 10:45:46AM 1,CAT 966H 23.51 634.77$ Holdgate 49207 1/14/2014 11:00:23AM 1,CAT 966H 18.56 501.12$ Holdgate 49207 1/14/2014 11:12:25AM 1,CAT 966H 23.56 636.12$ Holdgate 49207 1/14/2014 11:21:15AM 1,CAT 966H 23.48 633.96$ Holdgate 49207 1/14/2014 11:45:51AM 1,CAT 966H 18.96 511.92$ Holdgate 49207 1/14/2014 11:48:35AM 1,CAT 966H 22.59 609.93$ Holdgate 49207 1/14/2014 11:57:13AM 1,CAT 966H 22.85 616.95$ Holdgate 49207 1/14/2014 12:13:25AM 1,CAT 966H 18.14 489.78$ Holdgate 49207 1/14/2014 12:24:38PM 1,CAT 966H 23.84 643.68$ Holdgate 49207 1/14/2014 12:33:13PM 1,CAT 966H 23.57 636.39$ Holdgate 49207 1/14/2014 12:46:25PM 1,CAT 966H 19.51 526.77$ Holdgate 49207 1/14/2014 12:58:40PM 1,CAT 966H 23.74 640.98$ Holdgate 49207 1/14/2014 01:08:40PM 1,CAT 966H 23.63 638.01$ Holdgate 49207 1/14/2014 01:21:42PM 1,CAT 966H 18.58 501.66$ Holdgate 49207 1/14/2014 01:34:22PM 1,CAT 966H 23.32 629.64$ Holdgate 49207 1/14/2014 01:43:38PM 1,CAT 966H 23.4 631.80$ Holdgate 49207 1/14/2014 02:09:42PM 1,CAT 966H 23.75 641.25$ Holdgate 49207 1/14/2014 02:21:09PM 1,CAT 966H 23.39 631.53$ 13,612.32$ P&M Reis 90358 1/14/2014 10:20 Truck AJ 20 540.00$ P&M Reis 90358 1/14/2014 10:59 Truck AJ 20 540.00$ P&M Reis 90358 1/14/2014 11:34 Truck AJ 20 540.00$ P&M Reis 90358 1/14/2014 12:14 Truck AJ 20 540.00$ P&M Reis 90358 1/14/2014 12:50 Truck AJ 20 540.00$ P&M Reis 90358 1/14/2014 1:24 Truck AJ 20 540.00$ P&M Reis 90358 1/14/2014 2:00 Truck AJ 20 540.00$ P&M Reis 90358 1/14/2014 10:30 New Mack 20 540.00$ P&M Reis 90358 1/14/2014 11:07 New Mack 20 540.00$ P&M Reis 90358 1/14/2014 11:43 New Mack 20 540.00$ P&M Reis 90358 1/14/2014 12:29 New Mack 20 540.00$ P&M Reis 90358 1/14/2014 1:03 New Mack 20 540.00$ P&M Reis 90358 1/14/2014 1:33 New Mack 20 540.00$ P&M Reis 90358 1/14/2014 10:20 Tri Axle 22 594.00$ P&M Reis 90358 1/14/2014 10:58 Tri Axle 22 594.00$ P&M Reis 90358 1/14/2014 11:32 Tri Axle 22 594.00$ P&M Reis 90358 1/14/2014 12:10 Tri Axle 22 594.00$ P&M Reis 90358 1/14/2014 12:45 Tri Axle 22 594.00$ P&M Reis 90358 1/14/2014 1:20 Tri Axle 22 594.00$ P&M Reis 90358 1/14/2014 2:00 Tri Axle 22 594.00$ 11,178.00$ Holdgate 49228 1/15/2014 08:13:10AM 1,CAT 966H 21.88 590.76$ Holdgate 49228 1/15/2014 1,CAT 966H 17.62 475.74$ Holdgate 49228 1/15/2014 08:27:51AM 1,CAT 966H 22.2 599.40$ Holdgate 49228 1/15/2014 08:47:24AM 1,CAT 966H 22.99 620.73$ Holdgate 49228 1/15/2014 1,CAT 966H 17.48 471.96$ Holdgate 49228 1/15/2014 1,CAT 966H 22.37 603.99$ Holdgate 49228 1/15/2014 1,CAT 966H 22.8 615.60$ Page 10 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total Holdgate 49228 1/15/2014 1,CAT 966H 17.29 466.83$ Holdgate 49228 1/15/2014 1,CAT 966H 23.08 623.16$ Holdgate 49228 1/15/2014 10:00:22AM 1,CAT 966H 22.48 606.96$ Holdgate 49228 1/15/2014 10:04:13AM 1,CAT 966H 17.34 468.18$ Holdgate 49228 1/15/2014 10:16:56AM 1,CAT 966H 22.83 616.41$ Holdgate 49228 1/15/2014 10:36:34AM 1,CAT 966H 23.86 644.22$ Holdgate 49228 1/15/2014 10:42:07AM 1,CAT 966H 17.57 474.39$ Holdgate 49228 1/15/2014 10:54;14AM 1,CAT 966H 22.54 608.58$ Holdgate 49228 1/15/2014 11:12:52AM 1,CAT 966H 23.09 623.43$ Holdgate 49228 1/15/2014 11:17:21AM 1,CAT 966H 17.32 467.64$ Holdgate 49228 1/15/2014 11:29:17AM 1,CAT 966H 23.31 629.37$ Holdgate 49228 1/15/2014 11:55:37AM 1,CAT 966H 23.84 643.68$ Holdgate 49228 1/15/2014 11:58:05AM 1,CAT 966H 17.94 484.38$ Holdgate 49228 1/15/2014 12:14:38PM 1,CAT 966H 24.17 652.59$ Holdgate 49228 1/15/2014 12:34:09PM 1,CAT 966H 23.91 645.57$ Holdgate 49228 1/15/2014 12:36:33PM 1,CAT 966H 18.26 493.02$ Holdgate 49228 1/15/2014 12:49:07PM 1,CAT 966H 23.85 649.95$ Holdgate 49228 1/15/2014 01:08:13PM 1,CAT 966H 23.86 644.22$ Holdgate 49228 1/15/2014 01:12:06PM 1,CAT 966H 17.83 481.41$ Holdgate 49228 1/15/2014 01:24:19PM 1,CAT 966H 22.93 619.11$ Holdgate 49228 1/15/2014 01:46:18PM 1,CAT 966H 24.24 654.48$ Holdgate 49228 1/15/2014 02:07:31PM 1,CAT 966H 23.63 638.01$ Holdgate 49228 1/15/2014 02:21:40PM 1,CAT 966H 23.31 629.37$ Holdgate 49228 1/15/2014 02:44:18PM 1,CAT 966H 23.54 635.58$ Holdgate 49228 1/15/2014 03:01:53PM 1,CAT 966H 23.24 627.48$ 18,706.20$ P&M Reis 90373 1/15/2014 10:10 Truck #5 20 540.00$ P&M Reis 90373 1/15/2014 10:45 Truck #5 20 540.00$ P&M Reis 90373 1/15/2014 11:25 Truck #5 20 540.00$ P&M Reis 90373 1/15/2014 12:07 Truck #5 20 540.00$ P&M Reis 90373 1/15/2014 12:45 Truck #5 20 540.00$ P&M Reis 90373 1/15/2014 1:30 Truck #5 20 540.00$ P&M Reis 90373 1/15/2014 2:15 Truck #5 20 540.00$ P&M Reis 90373 1/15/2014 2:44 Truck #5 20 540.00$ P&M Reis 90373 1/15/2014 3:31 Truck #5 20 540.00$ P&M Reis 90373 1/15/2014 7:30 Truck # 12 16 432.00$ P&M Reis 90373 1/15/2014 8:42 Truck # 12 16 432.00$ P&M Reis 90373 1/15/2014 9:30 Truck # 12 16 432.00$ P&M Reis 90373 1/15/2014 7:24 New Mack 20 540.00$ P&M Reis 90373 1/15/2014 8:41 New Mack 20 540.00$ P&M Reis 90373 1/15/2014 9:18 New Mack 20 540.00$ P&M Reis 90373 1/15/2014 9:56 New Mack 20 540.00$ P&M Reis 90373 1/15/2014 10:39 New Mack 20 540.00$ P&M Reis 90373 1/15/2014 11:11 New Mack 20 540.00$ P&M Reis 90373 1/15/2014 11:44 New Mack 20 540.00$ P&M Reis 90373 1/15/2014 12:20 New Mack 20 540.00$ P&M Reis 90373 1/15/2014 12:54 New Mack 20 540.00$ P&M Reis 90373 1/15/2014 1:42 New Mack 20 540.00$ P&M Reis 90373 1/15/2014 2:25 New Mack 20 540.00$ P&M Reis 90373 1/15/2014 3:00 New Mack 20 540.00$ P&M Reis 90373 1/15/2014 7:22 Tri Axle 22 594.00$ P&M Reis 90373 1/15/2014 8:28 Tri Axle 22 594.00$ P&M Reis 90373 1/15/2014 9:02 Tri Axle 22 594.00$ P&M Reis 90373 1/15/2014 9:41 Tri Axle 22 594.00$ P&M Reis 90373 1/15/2014 10:17 Tri Axle 22 594.00$ P&M Reis 90373 1/15/2014 10:56 Tri Axle 22 594.00$ P&M Reis 90373 1/15/2014 11:32 Tri Axle 22 594.00$ P&M Reis 90373 1/15/2014 12:04 Tri Axle 22 594.00$ P&M Reis 90373 1/15/2014 12:35 Tri Axle 22 594.00$ P&M Reis 90373 1/15/2014 1:13 Tri Axle 22 594.00$ P&M Reis 90373 1/15/2014 1:47 Tri Axle 22 594.00$ P&M Reis 90373 1/15/2014 2:24 Tri Axle 22 594.00$ P&M Reis 90373 1/15/2014 3:06 Tri Axle 22 594.00$ 20,358.00$ Holdgate 49244 1/16/2014 07:54:48am 1,CAT 966H 22.22 599.94$ Holdgate 49244 1/16/2014 08:32:55am 1,CAT 966H 23.04 622.08$ Holdgate 49244 1/16/2014 09:44:16am 1,CAT 966H 21.87 590.49$ Holdgate 49244 1/16/2014 09:48:10am 1,CAT 966H 22.69 612.63$ Holdgate 49244 1/16/2014 10:21:13am 1,CAT 966H 24.11 650.97$ Holdgate 49244 1/16/2014 10:55:41am 1,CAT 966H 22.45 606.15$ Holdgate 49244 1/16/2014 11:32:17am 1,CAT 966H 23.44 515.68$ Holdgate 49244 1/16/2014 12:09:16pm 1,CAT 966H 22.99 620.73$ Holdgate 49244 1/16/2014 12:47:37pm 1,CAT 966H 24.28 655.56$ Holdgate 49244 1/16/2014 01:21:05pm 1,CAT 966H 23.5 634.50$ Page 11 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total Holdgate 49244 1/16/2014 01:55:26pm 1,CAT 966H 24.11 650.97$ Holdgate 49244 1/16/2014 02:31:11pm 1,CAT 966H 23.59 636.93$ Holdgate 49244 1/16/2014 03:05:32pm 1,CAT 966H 23.48 633.96$ 8,030.59$ P&M Reis 90379 1/16/2014 7:25 Tri Axle 22 594.00$ P&M Reis 90379 1/16/2014 8:05 Tri Axle 22 594.00$ P&M Reis 90379 1/16/2014 8:41 Tri Axle 22 594.00$ P&M Reis 90379 1/16/2014 9:22 Tri Axle 22 594.00$ P&M Reis 90379 1/16/2014 10:05 Tri Axle 22 594.00$ P&M Reis 90379 1/16/2014 10:40 Tri Axle 22 594.00$ P&M Reis 90379 1/16/2014 11:16 Tri Axle 22 594.00$ P&M Reis 90379 1/16/2014 11:50 Tri Axle 22 594.00$ P&M Reis 90379 1/16/2014 12:32 Tri Axle 22 594.00$ P&M Reis 90379 1/16/2014 1:07 Tri Axle 22 594.00$ P&M Reis 90379 1/16/2014 1:42 Tri Axle 22 594.00$ P&M Reis 90379 1/16/2014 2:17 Tri Axle 22 594.00$ P&M Reis 90379 1/16/2014 2:50 Tri Axle 22 594.00$ P&M Reis 90379 1/16/2014 3:26 Tri Axle 22 594.00$ P&M Reis 90379 1/16/2014 4:00 Tri Axle 22 594.00$ P&M Reis 90379 1/16/2014 4:34 Tri Axle 22 594.00$ 9,504.00$ Holdgate 49269 1/17/2014 07:25:56AM 1,CAT 966H 22.58 609.66$ Holdgate 49269 1/17/2014 07:50:06AM 1,CAT 966H 23.07 622.89$ Holdgate 49269 1/17/2014 08:03:08AM 1,CAT 966H 22.67 612.09$ Holdgate 49269 1/17/2014 08:43:06AM 1,CAT 966H 23.74 640.98$ Holdgate 49269 1/17/2014 08:46:23AM 1,CAT 966H 23.49 634.23$ Holdgate 49269 1/17/2014 09:20:13AM 1,CAT 966H 23.42 632.34$ Holdgate 49269 1/17/2014 09:23:34AM 1,CAT 966H 24.32 656.64$ Holdgate 49269 1/17/2014 09:55:18AM 1,CAT 966H 24.47 660.69$ Holdgate 49269 1/17/2014 09:59:18AM 1,CAT 966H 24.27 655.29$ Holdgate 49269 1/17/2014 10:33:28AM 1,CAT 966H 24.67 666.09$ Holdgate 49269 1/17/2014 10:43:30AM 1,CAT 966H 24.01 648.27$ Holdgate 49269 1/17/2014 11:07:34AM 1,CAT 966H 24.08 650.16$ Holdgate 49269 1/17/2014 11:24:01AM 1,CAT 966H 24.38 658.26$ Holdgate 49269 1/17/2014 11:42:11AM 1,CAT 966H 24.22 653.94$ Holdgate 49269 1/17/2014 11:59:13AM 1,CAT 966H 22.47 606.69$ Holdgate 49269 1/17/2014 12:18:15PM 1,CAT 966H 24.25 654.75$ Holdgate 49269 1/17/2014 12:35:07PM 1,CAT 966H 25.11 677.97$ Holdgate 49269 1/17/2014 01:01:12PM12 1,CAT 966H 23.56 636.12$ Holdgate 49269 1/17/2014 01:36:21PM 1,CAT 966H 23.21 626.67$ Holdgate 49269 1/17/2014 02:09:58PM 1,CAT 966H 23.23 627.21$ Holdgate 49269 1/17/2014 02:30:53PM 1,CAT 966H 23.11 623.97$ 13,454.91$ P&M Reis 90453 1/17/2014 7:13 Tri Axle 22 594.00$ P&M Reis 90453 1/17/2014 7:55 Tri Axle 22 594.00$ P&M Reis 90453 1/17/2014 8:41 Tri Axle 22 594.00$ P&M Reis 90453 1/17/2014 9:14 Tri Axle 22 594.00$ P&M Reis 90453 1/17/2014 9:50 Tri Axle 22 594.00$ P&M Reis 90453 1/17/2014 10:26 Tri Axle 22 594.00$ P&M Reis 90453 1/17/2014 11:01 Tri Axle 22 594.00$ P&M Reis 90453 1/17/2014 11:36 Tri Axle 22 594.00$ P&M Reis 90453 1/17/2014 12:13 Tri Axle 22 594.00$ P&M Reis 90453 1/17/2014 12:51 Tri Axle 22 594.00$ P&M Reis 90453 1/17/2014 1:32 Tri Axle 22 594.00$ P&M Reis 90453 1/17/2014 2:04 Tri Axle 22 594.00$ P&M Reis 90453 1/17/2014 2:38 Tri Axle 22 594.00$ P&M Reis 90453 1/17/2014 3:15 Tri Axle 22 594.00$ P&M Reis 90453 1/17/2014 3:55 Tri Axle 22 594.00$ P&M Reis 90453 1/17/2014 7:15 New Mack 20 540.00$ P&M Reis 90453 1/17/2014 7:55 New Mack 20 540.00$ P&M Reis 90453 1/17/2014 8:45 New Mack 20 540.00$ P&M Reis 90453 1/17/2014 9:20 New Mack 20 540.00$ P&M Reis 90453 1/17/2014 9:55 New Mack 20 540.00$ P&M Reis 90453 1/17/2014 10:30 New Mack 20 540.00$ P&M Reis 90453 1/17/2014 11:05 New Mack 20 540.00$ P&M Reis 90453 1/17/2014 11:45 New Mack 20 540.00$ P&M Reis 90453 1/17/2014 12:20 New Mack 20 540.00$ P&M Reis 90453 1/17/2014 12:55 New Mack 20 540.00$ P&M Reis 90453 1/17/2014 1:35 New Mack 20 540.00$ P&M Reis 90453 1/17/2014 2:10 New Mack 20 540.00$ P&M Reis 90453 1/17/2014 2:50 New Mack 20 540.00$ P&M Reis 90453 1/17/2014 3:20 New Mack 20 540.00$ P&M Reis 90453 1/17/2014 4:00 New Mack 20 540.00$ 17,010.00$ Holdgate 49270 1/18/2014 07:31:28AM 1,CAT 966H 22.13 597.51$ Holdgate 49270 1/18/2014 07:35:05AM 1,CAT 966H 22.6 610.20$ Page 12 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total Holdgate 49270 1/18/2014 08:02:22AM 1,CAT 966H 21.87 690.49$ Holdgate 49270 1/18/2014 08:08:00AM 1,CAT 966H 23.46 633.42$ Holdgate 49270 1/18/2014 08:37:34AM 1,CAT 966H 24.28 655.56$ Holdgate 49270 1/18/2014 08:41:07AM 1,CAT 966H 23.6 637.20$ Holdgate 49270 1/18/2014 09:08:58AM 1,CAT 966H 23.41 632.07$ Holdgate 49270 1/18/2014 09:13:06AM 1,CAT 966H 23.54 635.58$ Holdgate 49270 1/18/2014 09:40:43AM 1,CAT 966H 22.48 606.96$ Holdgate 49270 1/18/2014 09:45:41AM 1,CAT 966H 22.65 611.50$ Holdgate 49270 1/18/2014 10:13:00AM 1,CAT 966H 23.9 645.30$ Holdgate 49270 1/18/2014 10:17:37AM 1,CAT 966H 24.56 663.12$ Holdgate 49270 1/18/2014 10:45:06AM 1,CAT 966H 23.97 647.19$ Holdgate 49270 1/18/2014 10:50:14AM 1,CAT 966H 24.05 649.35$ Holdgate 49270 1/18/2014 11:14:02AM 1,CAT 966H 23.8 642.60$ Holdgate 49270 1/18/2014 11:21:24AM 1,CAT 966H 24.03 648.81$ Holdgate 49270 1/18/2014 11:45:06AM 1,CAT 966H 24.2 653.40$ Holdgate 49270 1/18/2014 11:52:01AM 1,CAT 966H 24.07 649.89$ Holdgate 49270 1/18/2014 12:18:10PM 1,CAT 966H 23.29 628.83$ Holdgate 49270 1/18/2014 12:24:01PM 1,CAT 966H 23.74 649.98$ Holdgate 49270 1/18/2014 12:55:25PM 1,CAT 966H 23.41 632.07$ Holdgate 49270 1/18/2014 12:58:33PM 1,CAT 966H 23.42 632.34$ Holdgate 49270 1/18/2014 01:25:32PM 1,CAT 966H 23.29 628.83$ Holdgate 49270 1/18/2014 01:28:38PM 1,CAT 966H 22.46 606.42$ Holdgate 49270 1/18/2014 01:56:17PM 1,CAT 966H 22.71 613.17$ Holdgate 49270 1/18/2014 02:04:15PM 1,CAT 966H 24.04 649.08$ 16,550.87$ P&M Reis 90456 1/18/2014 7:24 Tri Axle 22 594.00$ P&M Reis 90456 1/18/2014 7:59 Tri Axle 22 594.00$ P&M Reis 90456 1/18/2014 8:32 Tri Axle 22 594.00$ P&M Reis 90456 1/18/2014 9:04 Tri Axle 22 594.00$ P&M Reis 90456 1/18/2014 9:38 Tri Axle 22 594.00$ P&M Reis 90456 1/18/2014 10:10 Tri Axle 22 594.00$ P&M Reis 90456 1/18/2014 10:41 Tri Axle 22 594.00$ P&M Reis 90456 1/18/2014 11:12 Tri Axle 22 594.00$ P&M Reis 90456 1/18/2014 11:47 Tri Axle 22 594.00$ P&M Reis 90456 1/18/2014 12:19 Tri Axle 22 594.00$ P&M Reis 90456 1/18/2014 12:50 Tri Axle 22 594.00$ P&M Reis 90456 1/18/2014 1:23 Tri Axle 22 594.00$ P&M Reis 90456 1/18/2014 1:55 Tri Axle 22 594.00$ P&M Reis 90456 1/18/2014 2:26 Tri Axle 22 594.00$ P&M Reis 90456 1/18/2014 2:59 Tri Axle 22 594.00$ P&M Reis 90456 1/18/2014 3:36 Tri Axle 22 594.00$ P&M Reis 90456 1/18/2014 7:10 New Mack 20 540.00$ P&M Reis 90456 1/18/2014 7:50 New Mack 20 540.00$ P&M Reis 90456 1/18/2014 8:20 New Mack 20 540.00$ P&M Reis 90456 1/18/2014 8:55 New Mack 20 540.00$ P&M Reis 90456 1/18/2014 9:25 New Mack 20 540.00$ P&M Reis 90456 1/18/2014 9:55 New Mack 20 540.00$ P&M Reis 90456 1/18/2014 10:30 New Mack 20 540.00$ P&M Reis 90456 1/18/2014 11:05 New Mack 20 540.00$ P&M Reis 90456 1/18/2014 11:35 New Mack 20 540.00$ P&M Reis 90456 1/18/2014 12:10 New Mack 20 540.00$ P&M Reis 90456 1/18/2014 12:50 New Mack 20 540.00$ P&M Reis 90456 1/18/2014 1:20 New Mack 20 540.00$ P&M Reis 90456 1/18/2014 1:50 New Mack 20 540.00$ P&M Reis 90456 1/18/2014 2:20 New Mack 20 540.00$ P&M Reis 90456 1/18/2014 2:50 New Mack 20 540.00$ P&M Reis 90456 1/18/2014 3:25 New Mack 20 540.00$ 18,144.00$ P&M Reis 90458 1/19/2014 7:02 Tri Axle 22 594.00$ P&M Reis 90458 1/19/2014 7:42 Tri Axle 22 594.00$ P&M Reis 90458 1/19/2014 8:21 Tri Axle 22 594.00$ P&M Reis 90458 1/19/2014 9:00 Tri Axle 22 594.00$ P&M Reis 90458 1/19/2014 9:45 Tri Axle 22 594.00$ P&M Reis 90458 1/19/2014 10:22 Tri Axle 22 594.00$ P&M Reis 90458 1/19/2014 10:53 Tri Axle 22 594.00$ P&M Reis 90458 1/19/2014 11:27 Tri Axle 22 594.00$ P&M Reis 90458 1/19/2014 11:59 Tri Axle 22 594.00$ P&M Reis 90458 1/19/2014 12:35 Tri Axle 22 594.00$ P&M Reis 90458 1/19/2014 1:11 Tri Axle 22 594.00$ P&M Reis 90458 1/19/2014 1:47 Tri Axle 22 594.00$ P&M Reis 90458 1/19/2014 2:22 Tri Axle 22 594.00$ P&M Reis 90458 1/19/2014 2:56 Tri Axle 22 594.00$ P&M Reis 90458 1/19/2014 3:34 Tri Axle 22 594.00$ P&M Reis 90458 1/19/2014 7:05 New Mack 20 540.00$ Page 13 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 90458 1/19/2014 7:45 New Mack 20 540.00$ P&M Reis 90458 1/19/2014 8:30 New Mack 20 540.00$ P&M Reis 90458 1/19/2014 9:05 New Mack 20 540.00$ P&M Reis 90458 1/19/2014 9:40 New Mack 20 540.00$ P&M Reis 90458 1/19/2014 10:15 New Mack 20 540.00$ P&M Reis 90458 1/19/2014 10:45 New Mack 20 540.00$ P&M Reis 90458 1/19/2014 11:15 New Mack 20 540.00$ P&M Reis 90458 1/19/2014 11:50 New Mack 20 540.00$ P&M Reis 90458 1/19/2014 12:25 New Mack 20 540.00$ P&M Reis 90458 1/19/2014 1:00 New Mack 20 540.00$ P&M Reis 90458 1/19/2014 1:30 New Mack 20 540.00$ P&M Reis 90458 1/19/2014 7:19 Truck #5 20 540.00$ P&M Reis 90458 1/19/2014 8:05 Truck #5 20 540.00$ P&M Reis 90458 1/19/2014 8:30 Truck #5 20 540.00$ P&M Reis 90458 1/19/2014 9:13 Truck #5 20 540.00$ P&M Reis 90458 1/19/2014 9:46 Truck #5 20 540.00$ P&M Reis 90458 1/19/2014 10:16 Truck #5 20 540.00$ P&M Reis 90458 1/19/2014 10:49 Truck #5 20 540.00$ P&M Reis 90458 1/19/2014 11:23 Truck #5 20 540.00$ P&M Reis 90458 1/19/2014 11:55 Truck #5 20 540.00$ P&M Reis 90458 1/19/2014 12:30 Truck #5 20 540.00$ P&M Reis 90458 1/19/2014 1:07 Truck #5 20 540.00$ P&M Reis 90458 1/19/2014 1:43 Truck #5 20 540.00$ P&M Reis 90458 1/19/2014 8:10 Truck AJ 16 432.00$ P&M Reis 90458 1/19/2014 8:52 Truck AJ 16 432.00$ P&M Reis 90458 1/19/2014 9:28 Truck AJ 16 432.00$ P&M Reis 90458 1/19/2014 10:03 Truck AJ 16 432.00$ P&M Reis 90458 1/19/2014 10:37 Truck AJ 16 432.00$ P&M Reis 90458 1/19/2014 11:10 Truck AJ 16 432.00$ P&M Reis 90458 1/19/2014 11:44 Truck AJ 16 432.00$ P&M Reis 90458 1/19/2014 12:18 Truck AJ 16 432.00$ P&M Reis 90458 1/19/2014 7:07 Truck #12 16 432.00$ 25,758.00$ Holdgate 49304 1/20/2014 07:15:08AM 1,CAT 966H 22.63 611.01$ Holdgate 49304 1/20/2014 07:18:17AM 1,CAT 966H 22.72 613.44$ Holdgate 49304 1/20/2014 07:59:19AM 1,CAT 966H 23.13 624.51$ Holdgate 49304 1/20/2014 08:01:49AM 1,CAT 966H 17.77 479.79$ Holdgate 49304 1/20/2014 08:04:53AM 1,CAT 966H 22.79 615.33$ Holdgate 49304 1/20/2014 08:22:58AM 1,CAT 966H 17.39 469.53$ Holdgate 49304 1/20/2014 08:37:34AM 1,CAT 966H 24.09 650.43$ Holdgate 49304 1/20/2014 08:44:43AM 1,CAT 966H 17.9 483.30$ Holdgate 49304 1/20/2014 08:52:36AM 1,CAT 966H 22.79 615.33$ Holdgate 49304 1/20/2014 08:55:24AM 1,CAT 966H 18.16 490.32$ Holdgate 49304 1/20/2014 09:15:57AM 1,CAT 966H 24.06 649.62$ Holdgate 49304 1/20/2014 09:24:19AM 1,CAT 966H 17.33 467.91$ Holdgate 49304 1/20/2014 09:31:16AM 1,CAT 966H 23.25 627.75$ Holdgate 49304 1/20/2014 09:36:13AM 1,CAT 966H 18.3 494.10$ Holdgate 49304 1/20/2014 09:57:23AM 1,CAT 966H 22.49 607.23$ Holdgate 49304 1/20/2014 10:59:31AM 1,CAT 966H 17.19 464.13$ Holdgate 49304 1/20/2014 11:02:40AM 1,CAT 966H 22.55 608.85$ Holdgate 49304 1/20/2014 11:13:11AM 1,CAT 966H 23.21 626.67$ Holdgate 49304 1/20/2014 11:31:30AM 1,CAT 966H 17.03 459.81$ Holdgate 49304 1/20/2014 11:47:26AM 1,CAT 966H 23.68 639.36$ Holdgate 49304 1/20/2014 12:02:05PM 1,CAT 966H 22.82 616.14$ Holdgate 49304 1/20/2014 12:09:04PM 1,CAT 966H 17.99 485.73$ Holdgate 49304 1/20/2014 12:24:39PM 1,CAT 966H 23.26 628.02$ Holdgate 49304 1/20/2014 12:36:05PM 1,CAT 966H 22.93 619.11$ Holdgate 49304 1/20/2014 12:47:44PM 1,CAT 966H 20.15 544.05$ Holdgate 49304 1/20/2014 01:00:15PM 1,CAT 966H 23.37 630.99$ Holdgate 49304 1/20/2014 01:11:07PM 1,CAT 966H 23.09 623.43$ Holdgate 49304 1/20/2014 01:23:23PM 1,CAT 966H 17.43 470.61$ Holdgate 49304 1/20/2014 01:36:19PM 1,CAT 966H 23.49 634.23$ Holdgate 49304 1/20/2014 01:46:42PM 1,CAT 966H 24.02 648.54$ Holdgate 49304 1/20/2014 01:57:31PM 1,CAT 966H 17.35 468.45$ Holdgate 49304 1/20/2014 02:10:53PM 1,CAT 966H 22.63 611.01$ Holdgate 49304 1/20/2014 02:33:33PM 1,CAT 966H 17.23 465.21$ Holdgate 49304 1/20/2014 02:45:33PM 1,CAT 966H 23.9 645.30$ Holdgate 49304 1/20/2014 02:52:55PM 1,CAT 966H 23.09 623.43$ Holdgate 49304 1/20/2014 03:07:58PM 1,CAT 966H 17.24 465.48$ 20,478.15$ P&M Reis 90465 1/20/2014 7:22 Tri Axle 22 594.00$ P&M Reis 90465 1/20/2014 8:08 Tri Axle 22 594.00$ P&M Reis 90465 1/20/2014 8:45 Tri Axle 22 594.00$ P&M Reis 90465 1/20/2014 9:26 Tri Axle 22 594.00$ Page 14 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 90465 1/20/2014 10:09 Tri Axle 22 594.00$ P&M Reis 90465 1/20/2014 11:27 Tri Axle 22 594.00$ P&M Reis 90465 1/20/2014 12:05 Tri Axle 22 594.00$ P&M Reis 90465 1/20/2014 12:37 Tri Axle 22 594.00$ P&M Reis 90465 1/20/2014 1:16 Tri Axle 22 594.00$ P&M Reis 90465 1/20/2014 1:53 Tri Axle 22 594.00$ P&M Reis 90465 1/20/2014 2:27 Tri Axle 22 594.00$ P&M Reis 90465 1/20/2014 3:04 Tri Axle 22 594.00$ P&M Reis 90465 1/20/2014 7:20 New Mack 20 540.00$ P&M Reis 90465 1/20/2014 8:00 New Mack 20 540.00$ P&M Reis 90465 1/20/2014 8:35 New Mack 20 540.00$ P&M Reis 90465 1/20/2014 9:15 New Mack 20 540.00$ P&M Reis 90465 1/20/2014 9:55 New Mack 20 540.00$ P&M Reis 90465 1/20/2014 11:55 New Mack 20 540.00$ P&M Reis 90465 1/20/2014 12:25 New Mack 20 540.00$ P&M Reis 90465 1/20/2014 1:20 New Mack 20 540.00$ P&M Reis 90465 1/20/2014 2:00 New Mack 20 540.00$ P&M Reis 90465 1/20/2014 2:35 New Mack 20 540.00$ P&M Reis 90465 1/20/2014 7:14 Truck #5 20 540.00$ P&M Reis 90465 1/20/2014 7:50 Truck #5 20 540.00$ P&M Reis 90465 1/20/2014 8:25 Truck #5 20 540.00$ P&M Reis 90465 1/20/2014 8:58 Truck #5 20 540.00$ P&M Reis 90465 1/20/2014 9:35 Truck #5 20 540.00$ P&M Reis 90465 1/20/2014 10:59 Truck #5 20 540.00$ P&M Reis 90465 1/20/2014 11:39 Truck #5 20 540.00$ P&M Reis 90465 1/20/2014 12:19 Truck #5 20 540.00$ P&M Reis 90465 1/20/2014 12:59 Truck #5 20 540.00$ P&M Reis 90465 1/20/2014 1:30 Truck #5 20 540.00$ P&M Reis 90465 1/20/2014 2:05 Truck #5 20 540.00$ P&M Reis 90465 1/20/2014 2:40 Truck #5 20 540.00$ P&M Reis 90465 1/20/2014 3:15 Truck #5 20 540.00$ P&M Reis 90465 1/20/2014 7:00 Truck #12 16 432.00$ P&M Reis 90465 1/20/2014 8:00 Truck #12 16 432.00$ P&M Reis 90465 1/20/2014 8:40 Truck #12 16 432.00$ P&M Reis 90465 1/20/2014 9:30 Truck #12 16 432.00$ P&M Reis 90465 1/20/2014 10:00 Truck #12 16 432.00$ P&M Reis 90465 1/20/2014 11:15 Truck #12 16 432.00$ P&M Reis 90465 1/20/2014 7:48 Perry 16 432.00$ P&M Reis 90465 1/20/2014 8:30 Perry 16 432.00$ P&M Reis 90465 1/20/2014 9:15 Perry 16 432.00$ 23,436.00$ Holdgate 49352 1/21/2014 07:16:55AM 1,CAT 966H 15.65 422.55$ Holdgate 49352 1/21/2014 07:20:09AM 1,CAT 966H 21.78 588.06$ Holdgate 49352 1/21/2014 07:23:36AM 1,CAT 966H 21.98 593.46$ Holdgate 49352 1/21/2014 07:26:21AM 1,CAT 966H 16.32 440.64$ Holdgate 49352 1/21/2014 08:02:28AM 1,CAT 966H 17.15 463.05$ Holdgate 49352 1/21/2014 08:08:21AM 1,CAT 966H 21.4 577.80$ Holdgate 49352 1/21/2014 08:33:57AM 1,CAT 966H 22.85 616.95$ Holdgate 49352 1/21/2014 08:37:15AM 1,CAT 966H 17.53 473.31$ Holdgate 49352 1/21/2014 08:48:58AM 1,CAT 966H 23.55 635.85$ Holdgate 49352 1/21/2014 09:03:26AM 1,CAT 966H 23.25 627.75$ Holdgate 49352 1/21/2014 09:23:14AM 1,CAT 966H 23.22 626.94$ Holdgate 49352 1/21/2014 09:39:08AM 1,CAT 966H 23.38 631.26$ Holdgate 49352 1/21/2014 09:59:17AM 1,CAT 966H 22.49 607.23$ Holdgate 49352 1/21/2014 10:17:09AM 1,CAT 966H 23.07 622.89$ Holdgate 49352 1/21/2014 10:38:42AM 1,CAT 966H 17.84 481.68$ Holdgate 49352 1/21/2014 10:45:13AM 1,CAT 966H 25.66 692.82$ Holdgate 49352 1/21/2014 11:00:54AM 1,CAT 966H 24.8 669.60$ Holdgate 49352 1/21/2014 11:16:29AM 1,CAT 966H 18.77 506.79$ Holdgate 49352 1/21/2014 11:26:32AM 1,CAT 966H 23.37 630.99$ Holdgate 49352 1/21/2014 11:45:24AM 1,CAT 966H 24.95 673.65$ Holdgate 49352 1/21/2014 11:54:25AM 1,CAT 966H 18.65 503.55$ Holdgate 49352 1/21/2014 12:06:41PM 1,CAT 966H 24.96 673.92$ Holdgate 49352 1/21/2014 12:28:40PM 1,CAT 966H 25.03 675.81$ Holdgate 49352 1/21/2014 12:32:05PM 1,CAT 966H 18.43 497.61$ Holdgate 49352 1/21/2014 12:44:34PM 1,CAT 966H 24.93 673.11$ Holdgate 49352 1/21/2014 01:03:04PM 1,CAT 966H 24.56 663.12$ Holdgate 49352 1/21/2014 01:06:56PM 1,CAT 966H 18.12 489.24$ Holdgate 49352 1/21/2014 01:38:16PM 1,CAT 966H 24.6 664.20$ Holdgate 49352 1/21/2014 01:42:37PM 1,CAT 966H 19.11 515.97$ 16,939.80$ P&M Reis 90479 1/21/2014 7:12 Tri Axle 22 594.00$ P&M Reis 90479 1/21/2014 8:01 Tri Axle 22 594.00$ P&M Reis 90479 1/21/2014 8:42 Tri Axle 22 594.00$ Page 15 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 90479 1/21/2014 9:16 Tri Axle 22 594.00$ P&M Reis 90479 1/21/2014 9:51 Tri Axle 22 594.00$ P&M Reis 90479 1/21/2014 10:28 Tri Axle 22 594.00$ P&M Reis 90479 1/21/2014 11:07 Tri Axle 22 594.00$ P&M Reis 90479 1/21/2014 11:32 Tri Axle 22 594.00$ P&M Reis 90479 1/21/2014 12:15 Tri Axle 22 594.00$ P&M Reis 90479 1/21/2014 12:48 Tri Axle 22 594.00$ P&M Reis 90479 1/21/2014 1:23 Tri Axle 22 594.00$ P&M Reis 90479 1/21/2014 7:30 New Mack 20 540.00$ P&M Reis 90479 1/21/2014 8:20 New Mack 20 540.00$ P&M Reis 90479 1/21/2014 9:00 New Mack 20 540.00$ P&M Reis 90479 1/21/2014 9:35 New Mack 20 540.00$ P&M Reis 90479 1/21/2014 10:05 New Mack 20 540.00$ P&M Reis 90479 1/21/2014 10:45 New Mack 20 540.00$ P&M Reis 90479 1/21/2014 11:15 New Mack 20 540.00$ P&M Reis 90479 1/21/2014 11:50 New Mack 20 540.00$ P&M Reis 90479 1/21/2014 12:30 New Mack 20 540.00$ P&M Reis 90479 1/21/2014 1:05 New Mack 20 540.00$ P&M Reis 90479 1/21/2014 7:20 Truck #5 20 540.00$ P&M Reis 90479 1/21/2014 8:06 Truck #5 20 540.00$ P&M Reis 90479 1/21/2014 8:49 Truck #5 20 540.00$ P&M Reis 90479 1/21/2014 9:23 Truck #5 20 540.00$ P&M Reis 90479 1/21/2014 10:38 Truck #5 20 540.00$ P&M Reis 90479 1/21/2014 11:10 Truck #5 20 540.00$ P&M Reis 90479 1/21/2014 11:40 Truck #5 20 540.00$ P&M Reis 90479 1/21/2014 12:10 Truck #5 20 540.00$ P&M Reis 90479 1/21/2014 12:57 Truck #5 20 540.00$ P&M Reis 90479 1/21/2014 1:35 Truck #5 20 540.00$ P&M Reis 90479 1/21/2014 2:20 Truck #5 20 540.00$ P&M Reis 90479 1/21/2014 7:40 Perry 16 432.00$ P&M Reis 90479 1/21/2014 8:35 Perry 16 432.00$ P&M Reis 90479 1/21/2014 9:10 Perry 16 432.00$ P&M Reis 90479 1/21/2014 9:45 Perry 16 432.00$ P&M Reis 90479 1/21/2014 10:20 Perry 16 432.00$ P&M Reis 90479 1/21/2014 10:55 Perry 16 432.00$ P&M Reis 90479 1/21/2014 11:25 Perry 16 432.00$ P&M Reis 90479 1/21/2014 12:10 Perry 16 432.00$ P&M Reis 90479 1/21/2014 12:45 Perry 16 432.00$ P&M Reis 90479 1/21/2014 1:15 Perry 16 432.00$ 22,194.00$ Holdgate 49355 1/23/2014 07:42:09AM 1,CAT 966H 22.99 620.73$ Holdgate 49355 1/23/2014 07:50:47AM 1,CAT 966H 23.53 635.31$ Holdgate 49355 1/23/2014 08:29:22AM 1,CAT 966H 23.25 627.75$ Holdgate 49355 1/23/2014 08:37:12AM 1,CAT 966H 22.27 601.29$ Holdgate 49355 1/23/2014 09:11:46AM 1,CAT 966H 23.17 625.59$ Holdgate 49355 1/23/2014 09:24:54AM 1,CAT 966H 23.11 623.97$ Holdgate 49355 1/23/2014 09:54:31AM 1,CAT 966H 22.89 618.03$ Holdgate 49355 1/23/2014 10:08:27AM 1,CAT 966H 22.24 600.48$ Holdgate 49355 1/23/2014 10:36:56AM 1,CAT 966H 23.01 621.27$ Holdgate 49355 1/23/2014 10:51:52AM 1,CAT 966H 23.43 632.61$ Holdgate 49355 1/23/2014 11:17:24AM 1,CAT 966H 22.41 605.07$ Holdgate 49355 1/23/2014 11:33:06AM 1,CAT 966H 23.21 626.67$ Holdgate 49355 1/23/2014 11:56:49AM 1,CAT 966H 23.8 642.60$ Holdgate 49355 1/23/2014 12:20:21PM 1,CAT 966H 23.13 624.51$ Holdgate 49355 1/23/2014 12:57:25PM 1,CAT 966H 24.33 656.91$ Holdgate 49355 1/23/2014 01:00:23PM 1,CAT 966H 23.76 641.52$ Holdgate 49355 1/23/2014 01:40:32PM 1,CAT 966H 23.26 628.02$ Holdgate 49355 1/23/2014 01:53:34PM 1,CAT 966H 22.66 611.82$ Holdgate 49355 1/23/2014 02:25:12PM 1,CAT 966H 23.54 635.58$ Holdgate 49355 1/23/2014 02:35:12PM 1,CAT 966H 23.48 633.96$ Holdgate 49355 1/23/2014 03:03:36PM 1,CAT 966H 23.53 635.31$ Holdgate 49355 1/23/2014 03:14:45PM 1,CAT 966H 23.73 640.71$ 13,789.71$ P&M Reis 90657 1/23/2014 8:11 Tri Axle 22 594.00$ P&M Reis 90657 1/23/2014 8:55 Tri Axle 22 594.00$ P&M Reis 90657 1/23/2014 9:43 Tri Axle 22 594.00$ P&M Reis 90657 1/23/2014 10:25 Tri Axle 22 594.00$ P&M Reis 90657 1/23/2014 11:10 Tri Axle 22 594.00$ P&M Reis 90657 1/23/2014 11:51 Tri Axle 22 594.00$ P&M Reis 90657 1/23/2014 12:36 Tri Axle 22 594.00$ P&M Reis 90657 1/23/2014 1:22 Tri Axle 22 594.00$ P&M Reis 90657 1/23/2014 2:00 Tri Axle 22 594.00$ P&M Reis 90657 1/23/2014 Tri Axle 22 594.00$ P&M Reis 90657 1/23/2014 2:41 Tri Axle 22 594.00$ Page 16 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 90657 1/23/2014 3:18 New Mack 20 540.00$ P&M Reis 90657 1/23/2014 9:00 New Mack 20 540.00$ P&M Reis 90657 1/23/2014 9:50 New Mack 20 540.00$ P&M Reis 90657 1/23/2014 10:32 New Mack 20 540.00$ P&M Reis 90657 1/23/2014 11:18 New Mack 20 540.00$ P&M Reis 90657 1/23/2014 11:57 New Mack 20 540.00$ P&M Reis 90657 1/23/2014 12:47 New Mack 20 540.00$ P&M Reis 90657 1/23/2014 1:26 New Mack 20 540.00$ P&M Reis 90657 1/23/2014 2:06 New Mack 20 540.00$ P&M Reis 90657 1/23/2014 2:47 New Mack 20 540.00$ P&M Reis 90657 1/23/2014 8:50 AJ Truck 16 432.00$ P&M Reis 90657 1/23/2014 9:30 AJ Truck 16 432.00$ P&M Reis 90657 1/23/2014 10:20 AJ Truck 16 432.00$ 13,230.00$ Holdgate 49376 1/24/2014 07:15:01AM 1,CAT 966H 22.22 599.94$ Holdgate 49376 1/24/2014 07:20:24AM 1,CAT 966H 22.28 601.56$ Holdgate 49376 1/24/2014 08:16:17AM 1,CAT 966H 22.84 616.68$ Holdgate 49376 1/24/2014 08:00:39AM 1,CAT 966H 23.34 630.18$ Holdgate 49376 1/24/2014 08:29:30AM 1,CAT 966H 16.98 458.46$ Holdgate 49376 1/24/2014 09:54:50AM 1,CAT 966H 23.8 642.60$ Holdgate 49376 1/24/2014 10:07:27AM 1,CAT 966H 24.08 650.16$ Holdgate 49376 1/24/2014 10:12:12AM 1,CAT 966H 16.64 449.28$ Holdgate 49376 1/24/2014 10:42:55AM 1,CAT 966H 23.11 623.97$ Holdgate 49376 1/24/2014 10:52:14AM 1,CAT 966H 23.08 623.16$ Holdgate 49376 1/24/2014 10:56:01AM 1,CAT 966H 16.53 446.31$ Holdgate 49376 1/24/2014 11:24:47AM 1,CAT 966H 21.73 586.71$ Holdgate 49376 1/24/2014 11:34:27AM 1,CAT 966H 22.37 603.99$ Holdgate 49376 1/24/2014 11:36:28AM 1,CAT 966H 16.6 448.20$ Holdgate 49376 1/24/2014 12:05:13PM 1,CAT 966H 22.71 613.17$ Holdgate 49376 1/24/2014 12:11:45PM 1,CAT 966H 23.21 626.67$ Holdgate 49376 1/24/2014 12:24:12PM 1,CAT 966H 17.27 466.29$ Holdgate 49376 1/24/2014 12:46:57PM 1,CAT 966H 22.35 603.45$ Holdgate 49376 1/24/2014 12:58:59PM 1,CAT 966H 22.93 619.11$ Holdgate 49376 1/24/2014 01:03:00PM 1,CAT 966H 17.47 471.69$ Holdgate 49376 1/24/2014 01:42:55PM 1,CAT 966H 23.67 639.09$ Holdgate 49376 1/24/2014 01:43:51PM 1,CAT 966H 17.74 478.98$ Holdgate 49376 1/24/2014 02:27:11PM 1,CAT 966H 22.07 595.89$ Holdgate 49376 1/24/2014 02:31:30PM 1,CAT 966H 16.63 449.01$ 13,544.55$ P&M Reis 90662 1/24/2014 7:36 Tri Axle 22 594.00$ P&M Reis 90662 1/24/2014 8:22 Tri Axle 22 594.00$ P&M Reis 90662 1/24/2014 10:15 Tri Axle 22 594.00$ P&M Reis 90662 1/24/2014 11:00 Tri Axle 22 594.00$ P&M Reis 90662 1/24/2014 11:40 Tri Axle 22 594.00$ P&M Reis 90662 1/24/2014 12:25 Tri Axle 22 594.00$ P&M Reis 90662 1/24/2014 1:09 Tri Axle 22 594.00$ P&M Reis 90662 1/24/2014 1:45 Tri Axle 22 594.00$ P&M Reis 90662 1/24/2014 2:25 Tri Axle 22 594.00$ P&M Reis 90662 1/24/2014 3:05 Tri Axle 22 594.00$ P&M Reis 90662 1/24/2014 7:44 New Mack 20 540.00$ P&M Reis 90662 1/24/2014 9:47 New Mack 20 540.00$ P&M Reis 90662 1/24/2014 11:10 New Mack 20 540.00$ P&M Reis 90662 1/24/2014 11:51 New Mack 20 540.00$ P&M Reis 90662 1/24/2014 12:32 New Mack 20 540.00$ P&M Reis 90662 1/24/2014 1:24 New Mack 20 540.00$ P&M Reis 90662 1/24/2014 2:00 New Mack 20 540.00$ P&M Reis 90662 1/24/2014 2:44 New Mack 20 540.00$ P&M Reis 90662 1/24/2014 11:15 Perry 16 432.00$ P&M Reis 90662 1/24/2014 11:55 Perry 16 432.00$ P&M Reis 90662 1/24/2014 12:40 Perry 16 432.00$ P&M Reis 90662 1/24/2014 1:15 Perry 16 432.00$ P&M Reis 90662 1/24/2014 1:50 Perry 16 432.00$ P&M Reis 90662 1/24/2014 2:35 Perry 16 432.00$ P&M Reis 90662 1/24/2014 7:29 Truck #5 20 540.00$ P&M Reis 90662 1/24/2014 8:16 Truck #5 20 540.00$ P&M Reis 90662 1/24/2014 10:08 Truck #5 20 540.00$ P&M Reis 90662 1/24/2014 10:50 Truck #5 20 540.00$ P&M Reis 90662 1/24/2014 11:28 Truck #5 20 540.00$ P&M Reis 90662 1/24/2014 12:05 Truck #5 20 540.00$ P&M Reis 90662 1/24/2014 12:45 Truck #5 20 540.00$ P&M Reis 90662 1/24/2014 1:30 Truck #5 20 540.00$ P&M Reis 90662 1/24/2014 2:15 Truck #5 20 540.00$ P&M Reis 90662 1/24/2014 2:52 Truck #5 20 540.00$ P&M Reis 90662 1/24/2014 2:15 Truck #12 16 432.00$ Page 17 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 90662 1/24/2014 3:05 Truck #12 16 432.00$ 19,116.00$ Holdgate 49377 1/25/2014 07:24:48AM 1,CAT 966H 21.93 592.11$ Holdgate 49377 1/25/2014 07:27:39AM 1,CAT 966H 22.08 596.16$ Holdgate 49377 1/25/2014 07:30:01AM 1,CAT 966H 17.08 461.16$ Holdgate 49377 1/25/2014 08:08:13AM 1,CAT 966H 22.69 612.63$ Holdgate 49377 1/25/2014 08:10:31AM 1,CAT 966H 17.05 460.35$ Holdgate 49377 1/25/2014 08:13:23AM 1,CAT 966H 23.46 633.42$ Holdgate 49377 1/25/2014 08:45:23AM 1,CAT 966H 22.53 608.31$ Holdgate 49377 1/25/2014 08:48:47AM 1,CAT 966H 18.36 495.72$ Holdgate 49377 1/25/2014 08:51:23AM 1,CAT 966H 23.23 627.21$ Holdgate 49377 1/25/2014 09:22:08AM 1,CAT 966H 23.04 622.08$ Holdgate 49377 1/25/2014 09:24:32AM 1,CAT 966H 17.65 476.55$ Holdgate 49377 1/25/2014 09:27:31AM 1,CAT 966H 22.7 612.90$ Holdgate 49377 1/25/2014 09:57:30AM 1,CAT 966H 22.34 603.18$ Holdgate 49377 1/25/2014 09:59:38AM 1,CAT 966H 17.45 471.15$ Holdgate 49377 1/25/2014 10:02:35AM 1,CAT 966H 22.37 603.99$ Holdgate 49377 1/25/2014 10:33:59 1,CAT 966H 40.58 1,095.66$ Holdgate 49377 1/25/2014 10:38:04AM 1,CAT 966H 23.3 629.10$ Holdgate 49377 1/25/2014 11:08:07AM 1,CAT 966H 22.76 614.52$ Holdgate 49377 1/25/2014 11:11:40AM 1,CAT 966H 17.32 467.64$ Holdgate 49377 1/25/2014 11:14:31AM 1,CAT 966H 22.19 599.13$ Holdgate 49377 1/25/2014 11:43:53AM 1,CAT 966H 23.05 622.35$ Holdgate 49377 1/25/2014 11:46:11AM 1,CAT 966H 17.36 468.72$ Holdgate 49377 1/25/2014 11:49:49AM 1,CAT 966H 22.84 616.68$ Holdgate 49377 1/25/2014 12:17:27PM 1,CAT 966H 22.67 612.09$ Holdgate 49377 1/25/2014 12:20:43PM 1,CAT 966H 17.39 469.53$ Holdgate 49377 1/25/2014 12:24:38PM 1,CAT 966H 22.58 609.66$ Holdgate 49377 1/25/2014 12:54:21PM 1,CAT 966H 23.7 639.90$ Holdgate 49377 1/25/2014 12:56:32PM 1,CAT 966H 17.86 482.22$ Holdgate 49377 1/25/2014 12:59:12PM 1,CAT 966H 23.75 641.25$ Holdgate 49377 1/25/2014 02:18:50PM 1,CAT 966H 16.77 452.79$ Holdgate 49377 1/25/2014 02:22:22PM 1,CAT 966H 21.95 592.65$ Holdgate 49377 1/25/2014 01:41:33PM 1,CAT 966H 15.72 424.44$ Holdgate 49377 1/25/2014 01:46:19PM 1,CAT 966H 22.32 602.64$ Holdgate 49377 1/25/2014 01:51:45PM 1,CAT 966H 24.28 655.56$ 19,773.45$ P&M Reis 90663 1/25/2014 7:08 Tri Axle 22 594.00$ P&M Reis 90663 1/25/2014 7:52 Tri Axle 22 594.00$ P&M Reis 90663 1/25/2014 8:30 Tri Axle 22 594.00$ P&M Reis 90663 1/25/2014 9:08 Tri Axle 22 594.00$ P&M Reis 90663 1/25/2014 9:46 Tri Axle 22 594.00$ P&M Reis 90663 1/25/2014 10:20 Tri Axle 22 594.00$ P&M Reis 90663 1/25/2014 10:55 Tri Axle 22 594.00$ P&M Reis 90663 1/25/2014 11:30 Tri Axle 22 594.00$ P&M Reis 90663 1/25/2014 12:10 Tri Axle 22 594.00$ P&M Reis 90663 1/25/2014 12:47 Tri Axle 22 594.00$ P&M Reis 90663 1/25/2014 1:22 Tri Axle 22 594.00$ P&M Reis 90663 1/25/2014 1:56 Tri Axle 22 594.00$ P&M Reis 90663 1/25/2014 2:30 Tri Axle 22 594.00$ P&M Reis 90663 1/25/2014 3:08 Tri Axle 22 594.00$ P&M Reis 90663 1/25/2014 7:20 New Mack 20 540.00$ P&M Reis 90663 1/25/2014 7:58 New Mack 20 540.00$ P&M Reis 90663 1/25/2014 8:38 New Mack 20 540.00$ P&M Reis 90663 1/25/2014 9:12 New Mack 20 540.00$ P&M Reis 90663 1/25/2014 9:52 New Mack 20 540.00$ P&M Reis 90663 1/25/2014 10:25 New Mack 20 540.00$ P&M Reis 90663 1/25/2014 11:01 New Mack 20 540.00$ P&M Reis 90663 1/25/2014 11:38 New Mack 20 540.00$ P&M Reis 90663 1/25/2014 12:12 New Mack 20 540.00$ P&M Reis 90663 1/25/2014 12:45 New Mack 20 540.00$ P&M Reis 90663 1/25/2014 1:12 New Mack 20 540.00$ P&M Reis 90663 1/25/2014 1:50 New Mack 20 540.00$ P&M Reis 90663 1/25/2014 2:26 New Mack 20 540.00$ P&M Reis 90663 1/25/2014 3:01 New Mack 20 540.00$ P&M Reis 90663 1/25/2014 7:15 Truck #5 20 540.00$ P&M Reis 90663 1/25/2014 7:55 Truck #5 20 540.00$ P&M Reis 90663 1/25/2014 8:34 Truck #5 20 540.00$ P&M Reis 90663 1/25/2014 9:06 Truck #5 20 540.00$ P&M Reis 90663 1/25/2014 9:42 Truck #5 20 540.00$ P&M Reis 90663 1/25/2014 10:15 Truck #5 20 540.00$ P&M Reis 90663 1/25/2014 10:54 Truck #5 20 540.00$ P&M Reis 90663 1/25/2014 11:27 Truck #5 20 540.00$ P&M Reis 90663 1/25/2014 12:02 Truck #5 20 540.00$ Page 18 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 90663 1/25/2014 12:56 Truck #5 20 540.00$ P&M Reis 90663 1/25/2014 1:10 Truck #5 20 540.00$ P&M Reis 90663 1/25/2014 1:38 Truck #5 20 540.00$ P&M Reis 90663 1/25/2014 2:10 Truck #5 20 540.00$ P&M Reis 90663 1/25/2014 7:48 AJ Truck 16 432.00$ P&M Reis 90663 1/25/2014 8:26 AJ Truck 16 432.00$ P&M Reis 90663 1/25/2014 9:02 AJ Truck 16 432.00$ P&M Reis 90663 1/25/2014 9:38 AJ Truck 16 432.00$ P&M Reis 90663 1/25/2014 10:12 AJ Truck 16 432.00$ P&M Reis 90663 1/25/2014 10:47 AJ Truck 16 432.00$ P&M Reis 90663 1/25/2014 11:25 AJ Truck 16 432.00$ P&M Reis 90663 1/25/2014 11:59 AJ Truck 16 432.00$ P&M Reis 90663 1/25/2014 12:39 AJ Truck 16 432.00$ P&M Reis 90663 1/25/2014 1:12 AJ Truck 16 432.00$ P&M Reis 90663 1/25/2014 1:48 AJ Truck 16 432.00$ P&M Reis 90663 1/25/2014 2:23 AJ Truck 16 432.00$ P&M Reis 90663 1/25/2014 2:58 AJ Truck 16 432.00$ P&M Reis 90663 1/25/2014 8:05 Perry 16 432.00$ P&M Reis 90663 1/25/2014 8:40 Perry 16 432.00$ P&M Reis 90663 1/25/2014 9:05 Perry 16 432.00$ P&M Reis 90663 1/25/2014 9:46 Perry 16 432.00$ P&M Reis 90663 1/25/2014 10:22 Perry 16 432.00$ P&M Reis 90663 1/25/2014 11:00 Perry 16 432.00$ P&M Reis 90663 1/25/2014 11:32 Perry 16 432.00$ P&M Reis 90663 1/25/2014 12:07 Perry 16 432.00$ P&M Reis 90663 1/25/2014 12:41 Perry 16 432.00$ P&M Reis 90663 1/25/2014 1:15 Perry 16 432.00$ P&M Reis 90663 1/25/2014 1:45 Perry 16 432.00$ P&M Reis 90663 1/25/2014 2:15 Perry 16 432.00$ P&M Reis 90663 1/25/2014 2:50 Perry 16 432.00$ P&M Reis 90663 1/25/2014 7:26 Truck #12 16 432.00$ P&M Reis 90663 1/25/2014 8:13 Truck #12 16 432.00$ P&M Reis 90663 1/25/2014 8:53 Truck #12 16 432.00$ P&M Reis 90663 1/25/2014 9:30 Truck #12 16 432.00$ P&M Reis 90663 1/25/2014 10:05 Truck #12 16 432.00$ P&M Reis 90663 1/25/2014 10:38 Truck #12 16 432.00$ P&M Reis 90663 1/25/2014 11:10 Truck #12 16 432.00$ P&M Reis 90663 1/25/2014 11:45 Truck #12 16 432.00$ P&M Reis 90663 1/25/2014 12:20 Truck #12 16 432.00$ P&M Reis 90663 1/25/2014 12:50 Truck #12 16 432.00$ P&M Reis 90663 1/25/2014 1:25 Truck #12 16 432.00$ P&M Reis 90663 1/25/2014 2:00 Truck #12 16 432.00$ P&M Reis 90663 1/25/2014 2:35 Truck #12 16 432.00$ P&M Reis 90663 1/25/2014 3:10 Truck #12 16 432.00$ P&M Reis 90663 1/25/2014 7:30 Jason 18 486.00$ P&M Reis 90663 1/25/2014 8:00 Jason 18 486.00$ P&M Reis 90663 1/25/2014 8:46 Jason 18 486.00$ P&M Reis 90663 1/25/2014 9:19 Jason 18 486.00$ P&M Reis 90663 1/25/2014 9:55 Jason 18 486.00$ P&M Reis 90663 1/25/2014 10:31 Jason 18 486.00$ P&M Reis 90663 1/25/2014 11:08 Jason 18 486.00$ P&M Reis 90663 1/25/2014 11:30 Jason 18 486.00$ P&M Reis 90663 1/25/2014 12:12 Jason 18 486.00$ P&M Reis 90663 1/25/2014 12:48 Jason 18 486.00$ P&M Reis 90663 1/25/2014 1:30 Jason 18 486.00$ P&M Reis 90663 1/25/2014 2:05 Jason 18 486.00$ 46,008.00$ P&M Reis 90664 1/26/2014 7:25 Tri Axle 22 594.00$ P&M Reis 90664 1/26/2014 8:12 Tri Axle 22 594.00$ P&M Reis 90664 1/26/2014 8:51 Tri Axle 22 594.00$ P&M Reis 90664 1/26/2014 9:23 Tri Axle 22 594.00$ P&M Reis 90664 1/26/2014 10:04 Tri Axle 22 594.00$ P&M Reis 90664 1/26/2014 10:50 Tri Axle 22 594.00$ P&M Reis 90664 1/26/2014 11:25 Tri Axle 22 594.00$ P&M Reis 90664 1/26/2014 12:00 Tri Axle 22 594.00$ P&M Reis 90664 1/26/2014 12:36 Tri Axle 22 594.00$ P&M Reis 90664 1/26/2014 1:10 Tri Axle 22 594.00$ P&M Reis 90664 1/26/2014 1:43 Tri Axle 22 594.00$ P&M Reis 90664 1/26/2014 2:18 Tri Axle 22 594.00$ P&M Reis 90664 1/26/2014 2:49 Tri Axle 22 594.00$ P&M Reis 90664 1/26/2014 3:22 Tri Axle 22 594.00$ P&M Reis 90664 1/26/2014 7:10 New Mack 20 540.00$ P&M Reis 90664 1/26/2014 7:50 New Mack 20 540.00$ Page 19 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 90664 1/26/2014 9:25 New Mack 20 540.00$ P&M Reis 90664 1/26/2014 8:55 New Mack 20 540.00$ P&M Reis 90664 1/26/2014 9:40 New Mack 20 540.00$ P&M Reis 90664 1/26/2014 0:00 New Mack 20 540.00$ P&M Reis 90664 1/26/2014 10:55 New Mack 20 540.00$ P&M Reis 90664 1/26/2014 11:30 New Mack 20 540.00$ P&M Reis 90664 1/26/2014 12:00 New Mack 20 540.00$ P&M Reis 90664 1/26/2014 12:35 New Mack 20 540.00$ P&M Reis 90664 1/26/2014 1:15 New Mack 20 540.00$ P&M Reis 90664 1/26/2014 1:50 New Mack 20 540.00$ P&M Reis 90664 1/26/2014 2:20 New Mack 20 540.00$ P&M Reis 90664 1/26/2014 2:55 New Mack 20 540.00$ P&M Reis 90664 1/26/2014 3:25 New Mack 20 540.00$ P&M Reis 90664 1/26/2014 7:18 Truck #5 20 540.00$ P&M Reis 90664 1/26/2014 8:00 Truck #5 20 540.00$ P&M Reis 90664 1/26/2014 8:42 Truck #5 20 540.00$ P&M Reis 90664 1/26/2014 9:15 Truck #5 20 540.00$ P&M Reis 90664 1/26/2014 9:50 Truck #5 20 540.00$ P&M Reis 90664 1/26/2014 10:27 Truck #5 20 540.00$ P&M Reis 90664 1/26/2014 11:08 Truck #5 20 540.00$ P&M Reis 90664 1/26/2014 11:39 Truck #5 20 540.00$ P&M Reis 90664 1/26/2014 12:10 Truck #5 20 540.00$ P&M Reis 90664 1/26/2014 12:42 Truck #5 20 540.00$ P&M Reis 90664 1/26/2014 1:22 Truck #5 20 540.00$ P&M Reis 90664 1/26/2014 1:53 Truck #5 20 540.00$ P&M Reis 90664 1/26/2014 2:27 Truck #5 20 540.00$ P&M Reis 90664 1/26/2014 3:02 Truck #5 20 540.00$ P&M Reis 90664 1/26/2014 7:33 Perry 16 432.00$ P&M Reis 90664 1/26/2014 8:20 Perry 16 432.00$ P&M Reis 90664 1/26/2014 8:55 Perry 16 432.00$ P&M Reis 90664 1/26/2014 9:28 Perry 16 432.00$ P&M Reis 90664 1/26/2014 7:15 Truck #12 16 432.00$ P&M Reis 90664 1/26/2014 8:04 Truck #12 16 432.00$ P&M Reis 90664 1/26/2014 8:45 Truck #12 16 432.00$ P&M Reis 90664 1/26/2014 9:17 Truck #12 16 432.00$ P&M Reis 90664 1/26/2014 9:55 Truck #12 16 432.00$ P&M Reis 90664 1/26/2014 10:36 Truck #12 16 432.00$ P&M Reis 90664 1/26/2014 11:13 Truck #12 16 432.00$ P&M Reis 90664 1/26/2014 11:50 Truck #12 16 432.00$ P&M Reis 90664 1/26/2014 12:28 Truck #12 16 432.00$ P&M Reis 90664 1/26/2014 1:03 Truck #12 16 432.00$ P&M Reis 90664 1/26/2014 1:40 Truck #12 16 432.00$ P&M Reis 90664 1/26/2014 2:10 Truck #12 16 432.00$ P&M Reis 90664 1/26/2014 2:44 Truck #12 16 432.00$ P&M Reis 90664 1/26/2014 3:15 Truck #12 16 432.00$ 31,752.00$ Holdgate 49381 1/27/2014 07:14:30AM 1,CAT 966H 21.32 575.64$ Holdgate 49381 1/27/2014 07:17:45AM 1,CAT 966H 22.02 594.54$ Holdgate 49381 1/27/2014 07:32:19AM 1,CAT 966H 18.66 503.82$ Holdgate 49381 1/27/2014 07:54:42AM 1,CAT 966H 21.6 583.20$ Holdgate 49381 1/27/2014 08:05:13AM 1,CAT 966H 21.93 592.11$ Holdgate 49381 1/27/2014 08:07:40AM 1,CAT 966H 16.85 454.95$ Holdgate 49381 1/27/2014 08:22:24AM 1,CAT 966H 16.9 456.30$ Holdgate 49381 1/27/2014 09:05:10AM 1,CAT 966H 17.19 464.13$ Holdgate 49381 1/27/2014 09:07:46AM 1,CAT 966H 23.01 621.27$ Holdgate 49381 1/27/2014 09;21:00AM 1,CAT 966H 22.71 613.17$ Holdgate 49381 1/27/2014 07:17:21AM 1,CAT 966H 16.85 454.95$ Holdgate 49381 1/27/2014 09:45:52AM 1,CAT 966H 17.82 481.14$ Holdgate 49381 1/27/2014 09:48:38AM 1,CAT 966H 22.46 606.42$ Holdgate 49381 1/27/2014 09:54:54AM 1,CAT 966H 23.27 628.29$ Holdgate 49381 1/27/2014 10:21:08AM 1,CAT 966H 17.07 460.89$ Holdgate 49381 1/27/2014 10:27:39AM 1,CAT 966H 22.72 613.44$ Holdgate 49381 1/27/2014 10:35:00AM 1,CAT 966H 21.86 590.22$ Holdgate 49381 1/27/2014 10:50:00AM 1,CAT 966H 17.27 466.29$ Holdgate 49381 1/27/2014 11:32:30AM 1,CAT 966H 17.27 466.29$ Holdgate 49381 1/27/2014 11:35:40AM 1,CAT 966H 22.8 615.60$ Holdgate 49381 1/27/2014 11:38:53AM 1,CAT 966H 22.24 600.48$ Holdgate 49381 1/27/2014 12:11:26PM 1,CAT 966H 17.42 470.34$ Holdgate 49381 1/27/2014 12:14:02PM 1,CAT 966H 16.21 437.67$ Holdgate 49381 1/27/2014 12:20:02PM 1,CAT 966H 22 594.00$ Holdgate 49381 1/27/2014 12:23:02PM 1,CAT 966H 23.08 623.16$ Holdgate 49381 1/27/2014 12:48:19PM 1,CAT 966H 17.3 467.10$ Holdgate 49381 1/27/2014 12:51:54PM 1,CAT 966H 16.76 452.52$ Page 20 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total Holdgate 49381 1/27/2014 12:59:51PM 1,CAT 966H 23.15 625.05$ Holdgate 49381 1/27/2014 01:04:21PM 1,CAT 966H 23.02 621.54$ Holdgate 49381 1/27/2014 01:20:49PM 1,CAT 966H 18.11 488.97$ Holdgate 49381 1/27/2014 01:28:41PM 1,CAT 966H 16.94 457.38$ Holdgate 49381 1/27/2014 01:43:01PM 1,CAT 966H 23.11 623.97$ Holdgate 49381 1/27/2014 01:49:02PM 1,CAT 966H 22.46 606.42$ Holdgate 49381 1/27/2014 01:55:40PM 1,CAT 966H 15.95 430.65$ Holdgate 49381 1/27/2014 02:21:23PM 1,CAT 966H 22.71 613.17$ Holdgate 49381 1/27/2014 02:35:32PM 1,CAT 966H 23.78 642.06$ Holdgate 49381 1/27/2014 02:37:47PM 1,CAT 966H 17.07 460.89$ Holdgate 49381 1/27/2014 02:57:33PM 1,CAT 966H 21.73 586.71$ Holdgate 49381 1/27/2014 03:12:47PM 1,CAT 966H 16.83 454.41$ 21,099.15$ P&M Reis 90675 1/27/2014 7:30 Tri Axle 22 594.00$ P&M Reis 90675 1/27/2014 8:06 Tri Axle 22 594.00$ P&M Reis 90675 1/27/2014 8:41 Tri Axle 22 594.00$ P&M Reis 90675 1/27/2014 9:14 Tri Axle 22 594.00$ P&M Reis 90675 1/27/2014 9:55 Tri Axle 22 594.00$ P&M Reis 90675 1/27/2014 10:30 Tri Axle 22 594.00$ P&M Reis 90675 1/27/2014 11:04 Tri Axle 22 594.00$ P&M Reis 90675 1/27/2014 11:46 Tri Axle 22 594.00$ P&M Reis 90675 1/27/2014 12:25 Tri Axle 22 594.00$ P&M Reis 90675 1/27/2014 1:03 Tri Axle 22 594.00$ P&M Reis 90675 1/27/2014 1:40 Tri Axle 22 594.00$ P&M Reis 90675 1/27/2014 2:13 Tri Axle 22 594.00$ P&M Reis 90675 1/27/2014 2:47 Tri Axle 22 594.00$ P&M Reis 90675 1/27/2014 3:22 Tri Axle 22 594.00$ P&M Reis 90675 1/27/2014 7:42 New Mack 20 540.00$ P&M Reis 90675 1/27/2014 8:20 New Mack 20 540.00$ P&M Reis 90675 1/27/2014 9:26 New Mack 20 540.00$ P&M Reis 90675 1/27/2014 10:09 New Mack 20 540.00$ P&M Reis 90675 1/27/2014 10:46 New Mack 20 540.00$ P&M Reis 90675 1/27/2014 11:28 New Mack 20 540.00$ P&M Reis 90675 1/27/2014 12:03 New Mack 20 540.00$ P&M Reis 90675 1/27/2014 12:40 New Mack 20 540.00$ P&M Reis 90675 1/27/2014 1:23 New Mack 20 540.00$ P&M Reis 90675 1/27/2014 1:55 New Mack 20 540.00$ P&M Reis 90675 1/27/2014 2:36 New Mack 20 540.00$ P&M Reis 90675 1/27/2014 3:06 New Mack 20 540.00$ P&M Reis 90675 1/27/2014 7:34 Truck #5 20 540.00$ P&M Reis 90675 1/27/2014 8:10 Truck #5 20 540.00$ P&M Reis 90675 1/27/2014 8:45 Truck #5 20 540.00$ P&M Reis 90675 1/27/2014 9:20 Truck #5 20 540.00$ P&M Reis 90675 1/27/2014 9:58 Truck #5 20 540.00$ P&M Reis 90675 1/27/2014 10:38 Truck #5 20 540.00$ P&M Reis 90675 1/27/2014 11:09 Truck #5 20 540.00$ P&M Reis 90675 1/27/2014 11:52 Truck #5 20 540.00$ P&M Reis 90675 1/27/2014 12:28 Truck #5 20 540.00$ P&M Reis 90675 1/27/2014 1:06 Truck #5 20 540.00$ P&M Reis 90675 1/27/2014 1:42 Truck #5 20 540.00$ P&M Reis 90675 1/27/2014 2:17 Truck #5 20 540.00$ P&M Reis 90675 1/27/2014 2:50 Truck #5 20 540.00$ P&M Reis 90675 1/27/2014 7:45 Perry 16 432.00$ P&M Reis 90675 1/27/2014 8:30 Perry 16 432.00$ P&M Reis 90675 1/27/2014 9:00 Perry 16 432.00$ P&M Reis 90675 1/27/2014 9:35 Perry 16 432.00$ P&M Reis 90675 1/27/2014 10:08 Perry 16 432.00$ P&M Reis 90675 1/27/2014 10:45 Perry 16 432.00$ P&M Reis 90675 1/27/2014 11:20 Perry 16 432.00$ P&M Reis 90675 1/27/2014 12:00 Perry 16 432.00$ P&M Reis 90675 1/27/2014 1:30 Perry 16 432.00$ P&M Reis 90675 1/27/2014 1:10 Perry 16 432.00$ P&M Reis 90675 1/27/2014 1:50 Perry 16 432.00$ P&M Reis 90675 1/27/2014 2:26 Perry 16 432.00$ P&M Reis 90675 1/27/2014 3:10 Perry 16 432.00$ P&M Reis 90675 1/27/2014 7:00 Truck #12 16 432.00$ P&M Reis 90675 1/27/2014 8:00 Truck #12 16 432.00$ P&M Reis 90675 1/27/2014 8:30 Truck #12 16 432.00$ P&M Reis 90675 1/27/2014 9:10 Truck #12 16 432.00$ P&M Reis 90675 1/27/2014 9:45 Truck #12 16 432.00$ P&M Reis 90675 1/27/2014 10:20 Truck #12 16 432.00$ P&M Reis 90675 1/27/2014 10:58 Truck #12 16 432.00$ P&M Reis 90675 1/27/2014 11:40 Truck #12 16 432.00$ Page 21 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 90675 1/27/2014 12:15 Truck #12 16 432.00$ P&M Reis 90675 1/27/2014 12:55 Truck #12 16 432.00$ P&M Reis 90675 1/27/2014 1:30 Truck #12 16 432.00$ P&M Reis 90675 1/27/2014 2:05 Truck #12 16 432.00$ P&M Reis 90675 1/27/2014 2:40 Truck #12 16 432.00$ P&M Reis 90675 1/27/2014 3:20 Truck #12 16 432.00$ P&M Reis 90675 1/27/2014 7:40 AJ Truck 16 432.00$ P&M Reis 90675 1/27/2014 8:15 AJ Truck 16 432.00$ P&M Reis 90675 1/27/2014 8:50 AJ Truck 16 432.00$ P&M Reis 90675 1/27/2014 9:30 AJ Truck 16 432.00$ P&M Reis 90675 1/27/2014 10:05 AJ Truck 16 432.00$ P&M Reis 90675 1/27/2014 10:40 AJ Truck 16 432.00$ P&M Reis 90675 1/27/2014 11:15 AJ Truck 16 432.00$ P&M Reis 90675 1/27/2014 11:58 AJ Truck 16 432.00$ P&M Reis 90675 1/27/2014 12:35 AJ Truck 16 432.00$ P&M Reis 90675 1/27/2014 1:10 AJ Truck 16 432.00$ P&M Reis 90675 1/27/2014 1:50 AJ Truck 16 432.00$ P&M Reis 90675 1/27/2014 2:25 AJ Truck 16 432.00$ P&M Reis 90675 1/27/2014 3:00 AJ Truck 16 432.00$ P&M Reis 90675 1/27/2014 7:47 Jason 18 486.00$ P&M Reis 90675 1/27/2014 8:28 Jason 18 486.00$ P&M Reis 90675 1/27/2014 9:05 Jason 18 486.00$ P&M Reis 90675 1/27/2014 9:41 Jason 18 486.00$ P&M Reis 90675 1/27/2014 10:17 Jason 18 486.00$ P&M Reis 90675 1/27/2014 10:53 Jason 18 486.00$ P&M Reis 90675 1/27/2014 11:30 Jason 18 486.00$ P&M Reis 90675 1/27/2014 12:10 Jason 18 486.00$ P&M Reis 90675 1/27/2014 12:44 Jason 18 486.00$ P&M Reis 90675 1/27/2014 1:18 Jason 18 486.00$ P&M Reis 90675 1/27/2014 2:01 Jason 18 486.00$ P&M Reis 90675 1/27/2014 2:32 Jason 18 486.00$ 44,928.00$ Holdgate 49391 1/28/2014 07:12:52AM 1,CAT 966H 19.6 529.20$ Holdgate 49391 1/28/2014 07:16:37AM 1,CAT 966H 20.38 550.26$ Holdgate 49391 1/28/2014 07:23:51AM 1,CAT 966H 15.48 417.96$ Holdgate 49391 1/28/2014 07:49:54AM 1,CAT 966H 20.11 542.97$ Holdgate 49391 1/28/2014 08:00:48AM 1,CAT 966H 15.69 423.63$ Holdgate 49391 1/28/2014 08:05:32AM 1,CAT 966H 22.33 602.91$ Holdgate 49391 1/28/2014 08:24:19AM 1,CAT 966H 21.74 586.98$ Holdgate 49391 1/28/2014 08:35:14AM 1,CAT 966H 16.36 441.72$ Holdgate 49391 1/28/2014 08:40:38AM 1,CAT 966H 21.48 579.96$ Holdgate 49391 1/28/2014 09:02:28AM 1,CAT 966H 16.28 439.56$ Holdgate 49391 1/28/2014 09:12:59AM 1,CAT 966H 16.3 440.10$ Holdgate 49391 1/28/2014 09:19:52AM 1,CAT 966H 22.13 597.51$ Holdgate 49391 1/28/2014 09:43:16AM 1,CAT 966H 24.14 651.78$ Holdgate 49391 1/28/2014 09:49:04AM 1,CAT 966H 17.44 470.88$ Holdgate 49391 1/28/2014 09:58:04AM 1,CAT 966H 16.71 451.17$ Holdgate 49391 1/28/2014 10:15:50AM 1,CAT 966H 21.9 591.30$ Holdgate 49391 1/28/2014 10:24:12AM 1,CAT 966H 16.98 458.46$ Holdgate 49391 1/28/2014 10:21:27AM 1,CAT 966H 15.7 423.90$ Holdgate 49391 1/28/2014 10:50:50AM 1,CAT 966H 21.69 585.63$ Holdgate 49391 1/28/2014 10:58:47AM 1,CAT 966H 16.14 435.78$ Holdgate 49391 1/28/2014 11:10:52AM 1,CAT 966H 21.54 581.58$ Holdgate 49391 1/28/2014 11:56:17AM 1,CAT 966H 21.69 585.63$ Holdgate 49391 1/28/2014 11:58:55AM 1,CAT 966H 16.42 443.34$ Holdgate 49391 1/28/2014 12:01:58PM 1,CAT 966H 21.95 592.65$ Holdgate 49391 1/28/2014 12:29:24PM 1,CAT 966H 22.23 600.21$ Holdgate 49391 1/28/2014 12:35:26PM 1,CAT 966H 16.56 447.12$ Holdgate 49391 1/28/2014 01:05:37PM 1,CAT 966H 22.37 603.99$ Holdgate 49391 1/28/2014 01:08:42PM 1,CAT 966H 21.99 593.73$ Holdgate 49391 1/28/2014 01:13:45PM 1,CAT 966H 16.91 456.57$ Holdgate 49391 1/28/2014 01:41:11PM 1,CAT 966H 21.76 587.52$ Holdgate 49391 1/28/2014 01:51:07PM 1,CAT 966H 17.24 465.48$ Holdgate 49391 1/28/2014 02:00:29PM 1,CAT 966H 22.92 618.84$ Holdgate 49391 1/28/2014 02:18:42PM 1,CAT 966H 22.43 605.61$ Holdgate 49391 1/28/2014 02:25:53PM 1,CAT 966H 18.17 490.59$ Holdgate 49391 1/28/2014 02:42:22PM 1,CAT 966H 26.82 724.14$ Holdgate 49391 1/28/2014 02:53:08PM 1,CAT 966H 21.29 574.83$ Holdgate 49391 1/28/2014 02:59:30PM 1,CAT 966H 18.35 495.45$ 19,688.94$ P&M Reis 90681 1/28/2014 7:45 Tri Axle 22 594.00$ P&M Reis 90681 1/28/2014 8:35 Tri Axle 22 594.00$ P&M Reis 90681 1/28/2014 9:13 Tri Axle 22 594.00$ P&M Reis 90681 1/28/2014 10:01 Tri Axle 22 594.00$ Page 22 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 90681 1/28/2014 10:38 Tri Axle 22 594.00$ P&M Reis 90681 1/28/2014 11:22 Tri Axle 22 594.00$ P&M Reis 90681 1/28/2014 11:53 Tri Axle 22 594.00$ P&M Reis 90681 1/28/2014 12:33 Tri Axle 22 594.00$ P&M Reis 90681 1/28/2014 1:12 Tri Axle 22 594.00$ P&M Reis 90681 1/28/2014 1:48 Tri Axle 22 594.00$ P&M Reis 90681 1/28/2014 2:30 Tri Axle 22 594.00$ P&M Reis 90681 1/28/2014 3:05 Tri Axle 22 594.00$ P&M Reis 90681 1/28/2014 7:48 New Mack 20 540.00$ P&M Reis 90681 1/28/2014 8:42 New Mack 20 540.00$ P&M Reis 90681 1/28/2014 9:19 New Mack 20 540.00$ P&M Reis 90681 1/28/2014 10:04 New Mack 20 540.00$ P&M Reis 90681 1/28/2014 10:42 New Mack 20 540.00$ P&M Reis 90681 1/28/2014 11:14 New Mack 20 540.00$ P&M Reis 90681 1/28/2014 11:47 New Mack 20 540.00$ P&M Reis 90681 1/28/2014 12:30 New Mack 20 540.00$ P&M Reis 90681 1/28/2014 1:05 New Mack 20 540.00$ P&M Reis 90681 1/28/2014 1:38 New Mack 20 540.00$ P&M Reis 90681 1/28/2014 2:19 New Mack 20 540.00$ P&M Reis 90681 1/28/2014 2:55 New Mack 20 540.00$ P&M Reis 90681 1/28/2014 7:38 Truck #5 20 540.00$ P&M Reis 90681 1/28/2014 8:21 Truck #5 20 540.00$ P&M Reis 90681 1/28/2014 9:02 Truck #5 20 540.00$ P&M Reis 90681 1/28/2014 9:52 Truck #5 20 540.00$ P&M Reis 90681 1/28/2014 10:31 Truck #5 20 540.00$ P&M Reis 90681 1/28/2014 11:08 Truck #5 20 540.00$ P&M Reis 90681 1/28/2014 11:42 Truck #5 20 540.00$ P&M Reis 90681 1/28/2014 12:21 Truck #5 20 540.00$ P&M Reis 90681 1/28/2014 1:00 Truck #5 20 540.00$ P&M Reis 90681 1/28/2014 1:58 Truck #5 20 540.00$ P&M Reis 90681 1/28/2014 2:40 Truck #5 20 540.00$ P&M Reis 90681 1/28/2014 3:18 Truck #5 20 540.00$ P&M Reis 90681 1/28/2014 7:30 Perry 16 432.00$ P&M Reis 90681 1/28/2014 8:05 Perry 16 432.00$ P&M Reis 90681 1/28/2014 8:50 Perry 16 432.00$ P&M Reis 90681 1/28/2014 9:30 Perry 16 432.00$ P&M Reis 90681 1/28/2014 10:15 Perry 16 432.00$ P&M Reis 90681 1/28/2014 10:50 Perry 16 432.00$ P&M Reis 90681 1/28/2014 11:30 Perry 16 432.00$ P&M Reis 90681 1/28/2014 12:05 Perry 16 432.00$ P&M Reis 90681 1/28/2014 12:35 Perry 16 432.00$ P&M Reis 90681 1/28/2014 1:15 Perry 16 432.00$ P&M Reis 90681 1/28/2014 2:00 Perry 16 432.00$ P&M Reis 90681 1/28/2014 2:50 Perry 16 432.00$ P&M Reis 90681 1/28/2014 7:03 Truck #12 16 432.00$ P&M Reis 90681 1/28/2014 8:07 Truck #12 16 432.00$ P&M Reis 90681 1/28/2014 8:45 Truck #12 16 432.00$ P&M Reis 90681 1/28/2014 9:45 Truck #12 16 432.00$ P&M Reis 90681 1/28/2014 10:25 Truck #12 16 432.00$ P&M Reis 90681 1/28/2014 11:00 Truck #12 16 432.00$ P&M Reis 90681 1/28/2014 11:35 Truck #12 16 432.00$ P&M Reis 90681 1/28/2014 12:11 Truck #12 16 432.00$ P&M Reis 90681 1/28/2014 1:00 Truck #12 16 432.00$ P&M Reis 90681 1/28/2014 1:40 Truck #12 16 432.00$ P&M Reis 90681 1/28/2014 2:30 Truck #12 16 432.00$ P&M Reis 90681 1/28/2014 3:10 Truck #12 16 432.00$ P&M Reis 90681 1/28/2014 7:24 AJ Truck 16 432.00$ P&M Reis 90681 1/28/2014 8:01 AJ Truck 16 432.00$ P&M Reis 90681 1/28/2014 8:48 AJ Truck 16 432.00$ P&M Reis 90681 1/28/2014 9:26 AJ Truck 16 432.00$ P&M Reis 90681 1/28/2014 10:11 AJ Truck 16 432.00$ P&M Reis 90681 1/28/2014 10:47 AJ Truck 16 432.00$ P&M Reis 90681 1/28/2014 11:26 AJ Truck 16 432.00$ P&M Reis 90681 1/28/2014 12:12 AJ Truck 16 432.00$ P&M Reis 90681 1/28/2014 12:50 AJ Truck 16 432.00$ P&M Reis 90681 1/28/2014 1:42 AJ Truck 16 432.00$ P&M Reis 90681 1/28/2014 2:23 AJ Truck 16 432.00$ P&M Reis 90681 1/28/2014 3:00 AJ Truck 16 432.00$ P&M Reis 90681 1/28/2014 7:40 Jason 18 486.00$ P&M Reis 90681 1/28/2014 8:26 Jason 18 486.00$ P&M Reis 90681 1/28/2014 9:06 Jason 18 486.00$ P&M Reis 90681 1/28/2014 9:43 Jason 18 486.00$ Page 23 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 90681 1/28/2014 10:16 Jason 18 486.00$ P&M Reis 90681 1/28/2014 10:55 Jason 18 486.00$ P&M Reis 90681 1/28/2014 11:33 Jason 18 486.00$ P&M Reis 90681 1/28/2014 12:05 Jason 18 486.00$ P&M Reis 90681 1/28/2014 12:45 Jason 18 486.00$ P&M Reis 90681 1/28/2014 1:23 Jason 18 486.00$ P&M Reis 90681 1/28/2014 2:06 Jason 18 486.00$ P&M Reis 90681 1/28/2014 2:43 Jason 18 486.00$ P&M Reis 90681 1/28/2014 3:21 jason 18 486.00$ 41,958.00$ Holdgate 49401 1/30/2014 07:23:31AM 1,CAT 966H 21.74 586.98$ Holdgate 49401 1/30/2014 07:26:10AM 1,CAT 966H 20.58 555.66$ Holdgate 49401 1/30/2014 07:43:29AM 1,CAT 966H 16 432.00$ Holdgate 49401 1/30/2014 08:03:04AM 1,CAT 966H 21.08 569.16$ Holdgate 49401 1/30/2014 08:27:57AM 1,CAT 966H 22.54 608.58$ Holdgate 49401 1/30/2014 08:40:17AM 1,CAT 966H 17.01 459.27$ Holdgate 49401 1/30/2014 08:46:32AM 1,CAT 966H 23.31 629.37$ Holdgate 49401 1/30/2014 09:08:50AM 1,CAT 966H 23.83 643.41$ Holdgate 49401 1/30/2014 09:22:02AM 1,CAT 966H 19.07 514.89$ Holdgate 49401 1/30/2014 09:32:00AM 1,CAT 966H 24.43 659.61$ Holdgate 49401 1/30/2014 09:44:47AM 1,CAT 966H 19.31 521.37$ Holdgate 49401 1/30/2014 09:53:47AM 1,CAT 966H 24.34 657.18$ Holdgate 49401 1/30/2014 09:55:56AM 1,CAT 966H 18.37 495.99$ Holdgate 49401 1/30/2014 10:08:30AM 1,CAT 966H 24.58 663.66$ Holdgate 49401 1/30/2014 10:23:07AM 1,CAT 966H 18.12 489.24$ Holdgate 49401 1/30/2014 10:33:45AM 1,CAT 966H 23.54 635.58$ Holdgate 49401 1/30/2014 10:36:55AM 1,CAT 966H 18.14 489.78$ Holdgate 49401 1/30/2014 10:56:02AM 1,CAT 966H 23.15 625.05$ Holdgate 49401 1/30/2014 10:58:09AM 1,CAT 966H 17.83 481.41$ Holdgate 49401 1/30/2014 11:10:51AM 1,CAT 966H 22.74 613.98$ Holdgate 49401 1/30/2014 11:24:37AM 1,CAT 966H 17.56 474.12$ Holdgate 49401 1/30/2014 11:38:16AM 1,CAT 966H 24.39 658.53$ Holdgate 49401 1/30/2014 11:50:01AM 1,CAT 966H 23.73 640.71$ Holdgate 49401 1/30/2014 11:57:57AM 1,CAT 966H 18.34 495.18$ Holdgate 49401 1/30/2014 12:22:47PM 1,CAT 966H 23.74 640.98$ Holdgate 49401 1/30/2014 12:45:24PM 1,CAT 966H 23.84 643.68$ Holdgate 49401 1/30/2014 12:47:35PM 1,CAT 966H 18.59 501.93$ Holdgate 49401 1/30/2014 12:57:34PM 1,CAT 966H 23 621.00$ Holdgate 49401 1/30/2014 01:20:12PM 1,CAT 966H 25.24 681.48$ Holdgate 49401 1/30/2014 01:24:13PM 1,CAT 966H 19.82 535.14$ Holdgate 49401 1/30/2014 01:42:18PM 1,CAT 966H 25.11 677.97$ Holdgate 49401 1/30/2014 01:53:19PM 1,CAT 966H 25.38 685.26$ Holdgate 49401 1/30/2014 01:56:42PM 1,CAT 966H 19.31 521.37$ Holdgate 49401 1/30/2014 02:17:15PM 1,CAT 966H 22.99 620.73$ Holdgate 49401 1/30/2014 02:27:21PM 1,CAT 966H 23.98 647.46$ Holdgate 49401 1/30/2014 02:35:07PM 1,CAT 966H 18.38 496.26$ Holdgate 49401 1/30/2014 02:57:00PM 1,CAT 966H 23.7 639.90$ 21,513.87$ P&M Reis 90714 1/30/2014 7:40 Tri Axle 22 594.00$ P&M Reis 90714 1/30/2014 8:36 Tri Axle 22 594.00$ P&M Reis 90714 1/30/2014 9:19 Tri Axle 22 594.00$ P&M Reis 90714 1/30/2014 9:59 Tri Axle 22 594.00$ P&M Reis 90714 1/30/2014 10:45 Tri Axle 22 594.00$ P&M Reis 90714 1/30/2014 11:33 Tri Axle 22 594.00$ P&M Reis 90714 1/30/2014 12:35 Tri Axle 22 594.00$ P&M Reis 90714 1/30/2014 1:15 Tri Axle 22 594.00$ P&M Reis 90714 1/30/2014 1:45 Tri Axle 22 594.00$ P&M Reis 90714 1/30/2014 2:30 Tri Axle 22 594.00$ P&M Reis 90714 1/30/2014 3:00 Tri Axle 22 594.00$ P&M Reis 90714 1/30/2014 7:20 New Mack 20 540.00$ P&M Reis 90714 1/30/2014 8:20 New Mack 20 540.00$ P&M Reis 90714 1/30/2014 9:05 New Mack 20 540.00$ P&M Reis 90714 1/30/2014 10:10 New Mack 20 540.00$ P&M Reis 90714 1/30/2014 11:10 New Mack 20 540.00$ P&M Reis 90714 1/30/2014 11:50 New Mack 20 540.00$ P&M Reis 90714 1/30/2014 7:25 Truck #5 20 540.00$ P&M Reis 90714 1/30/2014 8:34 Truck #5 20 540.00$ P&M Reis 90714 1/30/2014 9:36 Truck #5 20 540.00$ P&M Reis 90714 1/30/2014 10:36 Truck #5 20 540.00$ P&M Reis 90714 1/30/2014 11:48 Truck #5 20 540.00$ P&M Reis 90714 1/30/2014 12:53 Truck #5 20 540.00$ P&M Reis 90714 1/30/2014 1:34 Truck #5 20 540.00$ P&M Reis 90714 1/30/2014 2:14 Truck #5 20 540.00$ P&M Reis 90714 1/30/2014 2:49 Truck #5 20 540.00$ Page 24 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 90714 1/30/2014 7:30 Perry 16 432.00$ P&M Reis 90714 1/30/2014 8:40 Perry 16 432.00$ P&M Reis 90714 1/30/2014 9:45 Perry 16 432.00$ P&M Reis 90714 1/30/2014 10:45 Perry 16 432.00$ P&M Reis 90714 1/30/2014 11:55 Perry 16 432.00$ P&M Reis 90714 1/30/2014 1:00 Perry 16 432.00$ P&M Reis 90714 1/30/2014 1:40 Perry 16 432.00$ P&M Reis 90714 1/30/2014 2:20 Perry 16 432.00$ P&M Reis 90714 1/30/2014 2:55 Perry 16 432.00$ P&M Reis 90714 1/30/2014 7:30 Truck #12 16 432.00$ P&M Reis 90714 1/3/1900 8:43 Truck #12 16 432.00$ P&M Reis 90714 1/30/2014 9:55 Truck #12 16 432.00$ P&M Reis 90714 1/30/2014 7:50 AJ Truck 16 432.00$ P&M Reis 90714 1/30/2014 8:50 AJ Truck 16 432.00$ P&M Reis 90714 1/30/2014 9:50 AJ Truck 16 432.00$ P&M Reis 90714 1/30/2014 10:45 AJ Truck 16 432.00$ P&M Reis 90714 1/30/2014 11:20 AJ Truck 16 432.00$ P&M Reis 90714 1/30/2014 1:14 AJ Truck 16 432.00$ P&M Reis 90714 1/30/2014 2:00 AJ Truck 16 432.00$ P&M Reis 90714 1/30/2014 2:40 AJ Truck 16 432.00$ P&M Reis 90714 1/30/2014 3:20 AJ Truck 16 432.00$ 23,706.00$ Holdgate 49415 1/30/2014 07:29:58AM 1,CAT 966H 21.8 588.60$ Holdgate 49415 1/31/2014 07:38:46AM 1,CAT 966H 17.87 482.49$ Holdgate 49415 1/31/2014 07:42:44AM 1,CAT 966H 23.85 643.95$ Holdgate 49415 1/31/2014 08:07:55AM 1,CAT 966H 24.25 654.75$ Holdgate 49415 1/31/2014 08:10:22AM 1,CAT 966H 18.12 489.24$ Holdgate 49415 1/31/2014 08:23:29AM 1,CAT 966H 23.88 644.76$ Holdgate 49415 1/31/2014 08:28:35AM 1,CAT 966H 18.36 495.72$ Holdgate 49415 1/31/2014 08:45:16AM 1,CAT 966H 24.26 655.02$ Holdgate 49415 1/31/2014 08:53:09AM 1,CAT 966H 18.29 493.83$ Holdgate 49415 1/31/2014 8:57:04AM 1,CAT 966H 22.99 620.73$ Holdgate 49415 1/31/2014 09:27:03AM 1,CAT 966H 18.93 511.11$ Holdgate 49415 1/31/2014 09:29:43AM 1,CAT 966H 24.83 670.41$ Holdgate 49415 1/31/2014 09:32:28AM 1,CAT 966H 23.58 636.66$ Holdgate 49415 1/31/2014 09:35:54AM 1,CAT 966H 18.99 512.73$ Holdgate 49415 1/31/2014 9:57:48AM 1,CAT 966H 25.67 693.09$ Holdgate 49415 1/31/2014 10:27:05AM 1,CAT 966H 24.59 663.93$ 9,457.02$ P&M Reis 90728 1/31/2014 7:29 Tri Axle 22 594.00$ P&M Reis 90728 1/31/2014 8:18 Tri Axle 22 594.00$ P&M Reis 90728 1/31/2014 8:54 Tri Axle 22 594.00$ P&M Reis 90728 1/31/2014 9:36 Tri Axle 22 594.00$ P&M Reis 90728 1/31/2014 7:23 Truck #5 20 540.00$ P&M Reis 90728 1/31/2014 8:13 Truck #5 20 540.00$ P&M Reis 90728 1/31/2014 8:55 Truck #5 20 540.00$ P&M Reis 90728 1/31/2014 9:28 Truck #5 20 540.00$ P&M Reis 90728 1/31/2014 8:50 Perry 16 432.00$ P&M Reis 90728 1/31/2014 9:45 Perry 16 432.00$ 5,400.00$ P&M Reis 90730 2/1/2014 7:17 Tri Axle 22 594.00$ P&M Reis 90730 2/1/2014 7:51 Tri Axle 22 594.00$ P&M Reis 90730 2/1/2014 8:21 Tri Axle 22 594.00$ P&M Reis 90730 2/1/2014 9:06 Tri Axle 22 594.00$ P&M Reis 90730 2/1/2014 9:35 Tri Axle 22 594.00$ P&M Reis 90730 2/1/2014 10:05 Tri Axle 22 594.00$ P&M Reis 90730 2/1/2014 10:35 Tri Axle 22 594.00$ P&M Reis 90730 2/1/2014 11:01 Tri Axle 22 594.00$ P&M Reis 90730 2/1/2014 7:22 New Mack 20 540.00$ P&M Reis 90730 2/1/2014 8:03 New Mack 20 540.00$ P&M Reis 90730 2/1/2014 8:36 New Mack 20 540.00$ P&M Reis 90730 2/1/2014 9:14 New Mack 20 540.00$ P&M Reis 90730 2/1/2014 9:45 New Mack 20 540.00$ P&M Reis 90730 2/1/2014 10:19 New Mack 20 540.00$ P&M Reis 90730 2/1/2014 10:57 New Mack 20 540.00$ P&M Reis 90730 2/1/2014 7:12 Truck #5 20 540.00$ P&M Reis 90730 2/1/2014 7:49 Truck #5 20 540.00$ P&M Reis 90730 2/1/2014 8:21 Truck #5 20 540.00$ P&M Reis 90730 2/1/2014 9:00 Truck #5 20 540.00$ P&M Reis 90730 2/1/2014 9:30 Truck #5 20 540.00$ P&M Reis 90730 2/1/2014 10:00 Truck #5 20 540.00$ P&M Reis 90730 2/1/2014 7:27 Perry 16 432.00$ P&M Reis 90730 2/1/2014 8:05 Perry 16 432.00$ P&M Reis 90730 2/1/2014 8:47 Perry 16 432.00$ P&M Reis 90730 2/1/2014 9:19 Perry 16 432.00$ Page 25 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total P&M Reis 90730 2/1/2014 9:48 Perry 16 432.00$ P&M Reis 90730 2/1/2014 10:24 Perry 16 432.00$ P&M Reis 90730 2/1/2014 11:00 Perry 16 432.00$ P&M Reis 90730 2/1/2014 11:07 AJ Truck 16 432.00$ 15,288.00$ Holdgate 49439 2/3/2014 10:08:19AM 1,CAT 966H 25.45 687.15$ Holdgate 49439 2/3/2014 10:11:43AM 1,CAT 966H 26.18 706.86$ Holdgate 49439 2/3/2014 10:43:27AM 1,CAT 966H 26.64 719.28$ Holdgate 49439 2/3/2014 10:53:32AM 1,CAT 966H 24.35 657.45$ Holdgate 49439 2/3/2014 11:18:01AM 1,CAT 966H 24.19 653.13$ 3,423.87$ Reis 90742 2/3/2014 9:00 Tri Axle 22 594.00$ Reis 90742 2/3/2014 9:35 Tri Axle 22 594.00$ Reis 90742 2/3/2014 10:10 Tri Axle 22 594.00$ Reis 90742 2/3/2014 10:45 Tri Axle 22 594.00$ Reis 90742 2/3/2014 11:20 Tri Axle 22 594.00$ Reis 90742 2/3/2014 11:55 Tri Axle 22 594.00$ Reis 90742 2/3/2014 12:35 Tri Axle 22 594.00$ Reis 90742 2/3/2014 1:25 Tri Axle 22 594.00$ Reis 90742 2/3/2014 2:05 Tri Axle 22 594.00$ Reis 90742 2/3/2014 2:45 Tri Axle 22 594.00$ Reis 90742 2/3/2014 3:25 Tri Axle 22 594.00$ Reis 90742 2/3/2014 9:00 New Mack 20 540.00$ Reis 90742 2/3/2014 9:40 New Mack 20 540.00$ Reis 90742 2/3/2014 10:15 New Mack 20 540.00$ Reis 90742 2/3/2014 10:45 New Mack 20 540.00$ Reis 90742 2/3/2014 11:25 New Mack 20 540.00$ Reis 90742 2/3/2014 12:00 New Mack 20 540.00$ Reis 90742 2/3/2014 12:45 New Mack 20 540.00$ Reis 90742 2/3/2014 1:03 New Mack 20 540.00$ Reis 90742 2/3/2014 2:15 New Mack 20 540.00$ Reis 90742 2/3/2014 2:56 New Mack 20 540.00$ Reis 90742 2/3/2014 3:34 New Mack 20 540.00$ Reis 90742 2/3/2014 9:15 Truck #5 20 540.00$ Reis 90742 2/3/2014 9:55 Truck #5 20 540.00$ Reis 90742 2/3/2014 10:32 Truck #5 20 540.00$ Reis 90742 2/3/2014 11:08 Truck #5 20 540.00$ Reis 90742 2/3/2014 11:47 Truck #5 20 540.00$ Reis 90742 2/3/2014 12:27 Truck #5 20 540.00$ Reis 90742 2/3/2014 1:28 Truck #5 20 540.00$ Reis 90742 2/3/2014 2:08 Truck #5 20 540.00$ Reis 90742 2/3/2014 2:47 Truck #5 20 540.00$ Reis 90742 2/3/2014 3:26 Truck #5 20 540.00$ Reis 90742 2/3/2014 9:35 Truck #12 16 432.00$ Reis 90742 2/3/2014 10:15 Truck #12 16 432.00$ Reis 90742 2/3/2014 10:55 Truck #12 16 432.00$ Reis 90742 2/3/2014 11:34 Truck #12 16 432.00$ Reis 90742 2/3/2014 12:15 Truck #12 16 432.00$ Reis 90742 2/3/2014 1:00 Truck #12 16 432.00$ Reis 90742 2/3/2014 1:48 Truck #12 16 432.00$ Reis 90742 2/3/2014 2:30 Truck #12 16 432.00$ Reis 90742 2/3/2014 3:15 Truck #12 16 432.00$ Reis 90742 2/3/2014 9:10 Perry 16 432.00$ Reis 90742 2/3/2014 11:00 Perry 16 432.00$ Reis 90742 2/3/2014 11:45 Perry 16 432.00$ Reis 90742 2/3/2014 12:20 Perry 16 432.00$ Reis 90742 2/3/2014 2:12 Perry 16 432.00$ Reis 90742 2/3/2014 1:02 Perry 16 432.00$ Reis 90742 2/3/2014 2:50 Perry 16 432.00$ Reis 90742 2/3/2014 3:30 Perry 16 432.00$ 25,218.00$ Holdgate 49444 2/4/2014 07:24:28AM 1,CAT 966H 22.59 609.93$ Holdgate 49444 2/4/2014 07:27:16AM 1,CAT 966H 17.29 466.83$ Holdgate 49444 2/4/2014 07:31:10AM 1,CAT 966H 21.21 572.67$ Holdgate 49444 2/4/2014 08:01:29AM 1,CAT 966H 23.27 628.29$ Holdgate 49444 2/4/2014 08:04:08AM 1,CAT 966H 18.23 492.21$ Holdgate 49444 2/4/2014 0.342847222 1,CAT 966H 19.41 524.07$ Holdgate 49444 2/4/2014 08:19:12AM 1,CAT 966H 24.74 667.98$ Holdgate 49444 2/4/2014 08:37:15AM 1,CAT 966H 24.95 673.65$ Holdgate 49444 2/4/2014 08:51:26AM 1,CAT 966H 19.36 522.72$ Holdgate 49444 2/4/2014 08:56:53AM 1,CAT 966H 24.67 666.09$ Holdgate 49444 2/4/2014 09:12:46AM 1,CAT 966H 19.33 521.91$ Holdgate 49444 2/4/2014 09:16:00AM 1,CAT 966H 24.12 651.24$ Holdgate 49444 2/4/2014 009:36:36AM 1,CAT 966H 19.86 536.22$ Holdgate 49444 2/4/2014 09:41:08AM 1,CAT 966H 25.1 677.70$ Page 26 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total Holdgate 49444 2/4/2014 09:45:59AM 1,CAT 966H 19.4 523.80$ Holdgate 49444 2/4/2014 09:51:14AM 1,CAT 966H 24.88 671.76$ Holdgate 49444 2/4/2014 10:14:51AM 1,CAT 966H 18.71 505.17$ Holdgate 49444 2/4/2014 10:17:46AM 1,CAT 966H 25.7 693.90$ Holdgate 49444 2/4/2014 10:20:37AM 1,CAT 966H 19.74 532.98$ Holdgate 49444 2/4/2014 10:26:46AM 1,CAT 966H 25.57 690.39$ Holdgate 49444 2/4/2014 10:51:12AM 1,CAT 966H 21.33 575.91$ Holdgate 49444 2/4/2014 10:54:48AM 1,CAT 966H 24.98 674.46$ Holdgate 49444 2/4/2014 10:57:26AM 1,CAT 966H 19.87 536.49$ Holdgate 49444 2/4/2014 11:05:49AM 1,CAT 966H 26.49 715.23$ Holdgate 49444 2/4/2014 11:26:50AM 1,CAT 966H 20.14 543.78$ Holdgate 49444 2/4/2014 11:30:02AM 1,CAT 966H 25.38 685.26$ Holdgate 49444 2/4/2014 11:32:50AM 1,CAT 966H 18.9 510.30$ Holdgate 49444 2/4/2014 11:42:15AM 1,CAT 966H 26.15 706.05$ Holdgate 49444 2/4/2014 12:05:45PM 1,CAT 966H 17.73 478.71$ Holdgate 49444 2/4/2014 12:08:56PM 1,CAT 966H 24.83 670.41$ Holdgate 49444 2/4/2014 12:11:29PM 1,CAT 966H 18.34 495.18$ Holdgate 49444 2/4/2014 12:19:49PM 1,CAT 966H 24.56 663.12$ Holdgate 49444 2/4/2014 12:41:15PM 1,CAT 966H 19.73 532.71$ Holdgate 49444 2/4/2014 12:44:43PM 1,CAT 966H 26.99 728.73$ Holdgate 49444 2/4/2014 12:47:18PM 1,CAT 966H 19.2 518.40$ Holdgate 49444 2/4/2014 12:58:43PM 1,CAT 966H 23.06 622.62$ Holdgate 49444 2/4/2014 01:18:07PM 1,CAT 966H 20.08 542.16$ Holdgate 49444 2/4/2014 01:21:13PM 1,CAT 966H 24.79 669.33$ Holdgate 49444 2/4/2014 01:23:44PM 1,CAT 966H 20.4 550.80$ Holdgate 49444 2/4/2014 01:53:50PM 1,CAT 966H 19.36 522.72$ Holdgate 49444 2/4/2014 01:56:44PM 1,CAT 966H 25.84 697.68$ Holdgate 49444 2/4/2014 01:59:12PM 1,CAT 966H 19.2 518.40$ Holdgate 49444 2/4/2014 02:30:54PM 1,CAT 966H 26.09 704.43$ Holdgate 49444 2/4/2014 02:33:40PM 1,CAT 966H 26.87 725.49$ Holdgate 49444 2/4/2014 02:35:46PM 1,CAT 966H 20.25 546.75$ Holdgate 49444 2/4/2014 03:05:32PM 1,CAT 966H 25.85 697.95$ Holdgate 49444 2/4/2014 03:08:49PM 1,CAT 966H 19.21 518.67$ Holdgate 49444 2/4/2014 03:11:19PM 1,CAT 966H 25.43 686.61$ 28,867.86$ Reis 90751 2/4/2013 7:20 Truck #12 16 432.00$ Reis 90751 2/4/2013 8:00 Truck #12 16 432.00$ Reis 90751 2/4/2013 8:40 Truck #12 16 432.00$ Reis 90751 2/4/2013 9:20 Truck #12 16 432.00$ Reis 90751 2/4/2013 10:00 Truck #12 16 432.00$ Reis 90751 2/4/2013 10:37 Truck #12 16 432.00$ Reis 90751 2/4/2013 11:16 Truck #12 16 432.00$ Reis 90751 2/4/2013 11:55 Truck #12 16 432.00$ Reis 90751 2/4/2013 12:30 Truck #12 16 432.00$ Reis 90751 2/4/2013 1:16 Truck #12 16 432.00$ Reis 90751 2/4/2013 1:52 Truck #12 16 432.00$ Reis 90751 2/4/2013 2:30 Truck #12 16 432.00$ Reis 90751 2/4/2013 3:07 Truck #12 16 432.00$ Reis 90751 2/4/2013 11:00 Truck #5 20 540.00$ Reis 90751 2/4/2013 11:35 Truck #5 20 540.00$ Reis 90751 2/4/2013 12:12 Truck #5 20 540.00$ Reis 90751 2/4/2013 12:47 Truck #5 20 540.00$ Reis 90751 2/4/2013 1:24 Truck #5 20 540.00$ Reis 90751 2/4/2013 1:57 Truck #5 20 540.00$ Reis 90751 2/4/2013 2:35 Truck #5 20 540.00$ Reis 90751 2/4/2013 3:11 Truck #5 20 540.00$ Reis 90751 2/4/2013 7:15 New Mack 20 540.00$ Reis 90751 2/4/2013 7:45 New Mack 20 540.00$ Reis 90751 2/4/2013 8:30 New Mack 20 540.00$ Reis 90751 2/4/2013 9:08 New Mack 20 540.00$ Reis 90751 2/4/2013 9:45 New Mack 20 540.00$ Reis 90751 2/4/2013 10:15 New Mack 20 540.00$ Reis 90751 2/4/2013 10:45 New Mack 20 540.00$ Reis 90751 2/4/2013 8:45 Tri Axle 22 594.00$ Reis 90751 2/4/2013 9:18 Tri Axle 22 594.00$ Reis 90751 2/4/2013 9:50 Tri Axle 22 594.00$ Reis 90751 2/4/2013 10:00 Tri Axle 22 594.00$ Reis 90751 2/4/2013 11:00 Tri Axle 22 594.00$ Reis 90751 2/4/2013 11:43 Tri Axle 22 594.00$ Reis 90751 2/4/2013 12:17 Tri Axle 22 594.00$ Reis 90751 2/4/2013 12:50 Tri Axle 22 594.00$ Reis 90751 2/4/2013 1:25 Tri Axle 22 594.00$ Reis 90751 2/4/2013 2:00 Tri Axle 22 594.00$ Page 27 of 27 Vendor Invoice #Date Time Truck ID Quantity Cost Invoice Total Reis 90751 2/4/2013 2:46 Tri Axle 22 594.00$ Reis 90751 2/4/2013 3:25 Tri Axle 22 594.00$ 20,844.00$ Reis 90757 2/5/2014 10:23 Tri Axle 22 594.00$ Reis 90757 2/5/2014 10:30 New Mack 20 540.00$ Reis 90770 2/6/2014 7:30 Tri Axle 22 594.00$ Reis 90770 2/6/2014 8:07 Tri Axle 22 594.00$ Reis 90770 2/6/2014 9:30 Tri Axle 22 594.00$ Reis 90770 2/6/2014 10:11 Tri Axle 22 594.00$ Reis 90770 2/6/2014 7:30 New Mack 20 540.00$ Reis 90770 2/6/2014 8:30 New Mack 20 540.00$ Reis 90770 2/6/2014 9:00 New Mack 20 540.00$ Reis 90770 2/6/2014 9:49 New Mack 20 540.00$ Reis 90770 2/6/2014 11:13 New Mack 20 540.00$ Reis 90770 2/6/2014 12:23:00 PM New Mack 20 540.00$ Reis 90770 2/6/2014 7:35:00 AM Truck #5 20 540.00$ Reis 90770 2/6/2014 8:19:00 AM Truck #5 20 540.00$ Reis 90770 2/6/2014 9:00:00 AM Truck #5 20 540.00$ Reis 90770 2/6/2014 9:40 Truck #5 20 540.00$ Reis 90770 2/6/2014 10:17 Truck #5 20 540.00$ Reis 90770 2/6/2014 11:06 Truck #5 20 540.00$ Reis 90770 2/6/2014 12:12 Truck #5 20 540.00$ Reis 90770 2/6/2014 8:40:00 AM AJ Truck 16 432.00$ Reis 90770 2/6/2014 x jason 18 486.00$ Reis 90770 2/6/2014 x jason 18 486.00$ Reis 90770 2/6/2014 x jason 18 486.00$ Reis 90770 2/6/2014 x jason 18 486.00$ Reis 90770 2/6/2014 x jason 18 486.00$ Reis 90770 2/6/2014 11:06 Perry 16 432.00$ Reis 90770 2/6/2014 12:11 Perry 16 432.00$ Reis 90770 2/6/2014 1:15 Perry 16 432.00$ Reis 90770 2/6/2014 8:45 Truck #12 16 432.00$ Reis 90770 2/6/2014 9:24 Truck #12 16 432.00$ Reis 90770 2/6/2014 10:23 Truck #12 16 432.00$ Reis 90770 2/6/2014 11:25 Truck #12 16 432.00$ Reis 90770 2/6/2014 12:30 Truck #12 16 432.00$ 15,714.00$ Totals 39,204.24 Invoice Date 1/14/2014 Invoice # 49207 Bill To Sconset Beach Preservation 18 Sesapana Rd. Nantucket, MA 02554 Holdgate Partners Po Box 427, 1 Barnard Valley Rd Nantucket, MA 02554 Terms Net 30 Account #Job Description Phone #508-228-4266 Fax #508-825-2013 Balance Due Subtotal Sales Tax (6.25%) Payments/Credits Signature Longfin LLC dba Date Item Code DescriptionQuantity Price Each Amount 1/14/2014 Sand - SBPF Hill sand per yard Delivered18.95 27.00 511.65 1/14/2014 Sand - SBPF Hill sand per yard Delivered22.52 27.00 608.04 1/14/2014 Sand - SBPF Hill sand per yard Delivered23.34 27.00 630.18 1/14/2014 Sand - SBPF Hill sand per yard Delivered17.51 27.00 472.77 1/14/2014 Sand - SBPF Hill sand per yard Delivered23.46 27.00 633.42 1/14/2014 Sand - SBPF Hill sand per yard Delivered23.51 27.00 634.77 1/14/2014 Sand - SBPF Hill sand per yard Delivered18.56 27.00 501.12 1/14/2014 Sand - SBPF Hill sand per yard Delivered23.56 27.00 636.12 1/14/2014 Sand - SBPF Hill sand per yard Delivered23.48 27.00 633.96 1/14/2014 Sand - SBPF Hill sand per yard Delivered18.96 27.00 511.92 1/14/2014 Sand - SBPF Hill sand per yard Delivered22.59 27.00 609.93 1/14/2014 Sand - SBPF Hill sand per yard Delivered22.85 27.00 616.95 1/14/2014 Sand - SBPF Hill sand per yard Delivered18.14 27.00 489.78 1/14/2014 Sand - SBPF Hill sand per yard Delivered23.84 27.00 643.68 1/14/2014 Sand - SBPF Hill sand per yard Delivered23.57 27.00 636.39 1/14/2014 Sand - SBPF Hill sand per yard Delivered19.51 27.00 526.77 1/14/2014 Sand - SBPF Hill sand per yard Delivered23.74 27.00 640.98 1/14/2014 Sand - SBPF Hill sand per yard Delivered23.63 27.00 638.01 1/14/2014 Sand - SBPF Hill sand per yard Delivered18.58 27.00 501.66 1/14/2014 Sand - SBPF Hill sand per yard Delivered23.32 27.00 629.64 1/14/2014 Sand - SBPF Hill sand per yard Delivered23.4 27.00 631.80 1/14/2014 Sand - SBPF Hill sand per yard Delivered23.75 27.00 641.25 1/14/2014 Sand - SBPF Hill sand per yard Delivered23.39 27.00 631.53 1/14/2014 Misc Plant & Equipment Rental1 3,300.00 3,300.00 $16,912.32 $16,912.32 $0.00 $0.00 Invoice Date 1/15/2014 Invoice # 49228 Bill To Sconset Beach Preservation 18 Sesapana Rd. Nantucket, MA 02554 Holdgate Partners Po Box 427, 1 Barnard Valley Rd Nantucket, MA 02554 Terms Net 30 Account #Job Description Phone #508-228-4266 Fax #508-825-2013 Balance Due Subtotal Sales Tax (6.25%) Payments/Credits Signature Longfin LLC dba Date Item Code DescriptionQuantity Price Each Amount 1/15/2014 Sand - SBPF Hill sand per yard Delivered21.88 27.00 590.76 1/15/2014 Sand - SBPF Hill sand per yard Delivered17.62 27.00 475.74 1/15/2014 Sand - SBPF Hill sand per yard Delivered22.2 27.00 599.40 1/15/2014 Sand - SBPF Hill sand per yard Delivered22.99 27.00 620.73 1/15/2014 Sand - SBPF Hill sand per yard Delivered17.48 27.00 471.96 1/15/2014 Sand - SBPF Hill sand per yard Delivered22.37 27.00 603.99 1/15/2014 Sand - SBPF Hill sand per yard Delivered22.8 27.00 615.60 1/15/2014 Sand - SBPF Hill sand per yard Delivered17.29 27.00 466.83 1/15/2014 Sand - SBPF Hill sand per yard Delivered23.08 27.00 623.16 1/15/2014 Sand - SBPF Hill sand per yard Delivered22.48 27.00 606.96 1/15/2014 Sand - SBPF Hill sand per yard Delivered17.34 27.00 468.18 1/15/2014 Sand - SBPF Hill sand per yard Delivered22.83 27.00 616.41 1/15/2014 Sand - SBPF Hill sand per yard Delivered23.86 27.00 644.22 1/15/2014 Sand - SBPF Hill sand per yard Delivered17.57 27.00 474.39 1/15/2014 Sand - SBPF Hill sand per yard Delivered22.54 27.00 608.58 1/15/2014 Sand - SBPF Hill sand per yard Delivered23.09 27.00 623.43 1/15/2014 Sand - SBPF Hill sand per yard Delivered17.32 27.00 467.64 1/15/2014 Sand - SBPF Hill sand per yard Delivered23.31 27.00 629.37 1/15/2014 Sand - SBPF Hill sand per yard Delivered23.84 27.00 643.68 1/15/2014 Sand - SBPF Hill sand per yard Delivered17.94 27.00 484.38 1/15/2014 Sand - SBPF Hill sand per yard Delivered24.17 27.00 652.59 1/15/2014 Sand - SBPF Hill sand per yard Delivered23.91 27.00 645.57 1/15/2014 Sand - SBPF Hill sand per yard Delivered18.26 27.00 493.02 1/15/2014 Sand - SBPF Hill sand per yard Delivered23.85 27.00 643.95 1/15/2014 Sand - SBPF Hill sand per yard Delivered23.86 27.00 644.22 1/15/2014 Sand - SBPF Hill sand per yard Delivered17.83 27.00 481.41 Page 1 Invoice Date 1/15/2014 Invoice # 49228 Bill To Sconset Beach Preservation 18 Sesapana Rd. Nantucket, MA 02554 Holdgate Partners Po Box 427, 1 Barnard Valley Rd Nantucket, MA 02554 Terms Net 30 Account #Job Description Phone #508-228-4266 Fax #508-825-2013 Balance Due Subtotal Sales Tax (6.25%) Payments/Credits Signature Longfin LLC dba Date Item Code DescriptionQuantity Price Each Amount 1/15/2014 Sand - SBPF Hill sand per yard Delivered22.93 27.00 619.11 1/15/2014 Sand - SBPF Hill sand per yard Delivered24.24 27.00 654.48 1/15/2014 Sand - SBPF Hill sand per yard Delivered23.63 27.00 638.01 1/15/2014 Sand - SBPF Hill sand per yard Delivered23.31 27.00 629.37 1/15/2014 Sand - SBPF Hill sand per yard Delivered23.54 27.00 635.58 1/15/2014 Sand - SBPF Hill sand per yard Delivered23.24 27.00 627.48 1/15/2014 Misc Plant & Equipment Rental1 3,300.00 3,300.00 Page 2 $22,000.20 $22,000.20 $0.00 $0.00 BAXTER ROAD TEMPORARY STABILIZATION PROJECT NOTICE OF INTENT (DEP FILE NO. SE 048-2610) RESPONSE TO LETTER FROM NANTUCKET LAND COUNCIL DATED FEBRUARY 18, 2014 March 13, 2014 This document provides responses to the above-referenced letter. For ease of review, the comments in the Nantucket Land Council’s letter have been grouped into categories. 1. As-Built Plan and Surveys Comments: o Up to date survey of beach elevations fronting the project and immediately north and south of the project should be required….. o A current mean high tide line (HTL) should be clearly labeled on the Plan. o Surveyed position and elevation of the seaward extent of geotube #1 should be provided on the As-Built Plan. o The seaward extent and profile of placed nourishment and seaward extent and profile of proposed nourishment should be shown on the updated beach profiles. o The project benchmarks should be shown on the As-Built Plan with the appropriate horizontal and vertical coordinates. o Updated survey of top of coastal bank (at a minimum in construction zones) should be required. o Design Plans and As-Built Plans of the proposed constructed geotube design should be stamped by the design engineer. In addition, written comments should be provided on the As-Built Plan by the design engineer to certify what was constructed and the methods used (this is a new design and the Commission should require official approval by a professional coastal engineer). Response: The submitted as-built plan was performed by a Professional Land Surveyor (PLS) and meets the standard requirements for a Record Drawing. As indicated on the plan, Blackwell & Associates and Woods Hole Group established on-site benchmarks at locations north and south of the project site. There is no requirement that these benchmarks need to be shown on the as-built plan, nor is it typical for the benchmarks to be shown. In this instance, the benchmarks were not shown since they are located to the north and south of the depicted project area. The as-built plan was prepared at the completion of construction, as is typical, and notes that geotubes #1 and #2 were not surveyed due to their position below geotube #3. However, the location of geotube #3 is known with precision, as are the dimensions and degree of overlap of geotubes #1 and #2, so the positions of geotubes #1 and #2 and the anchor tube can also be reliably determined, as shown on the as-built plan. There can be no reasonable doubt as to the locations of geotubes #1 and #2 and the anchor tube, hence the appropriateness of the PLS to stamp the as-built drawings. Response to Nantucket Land Council Letter dated February 14, 2014 1 In relations to the current beach contours and elevations, SBPF performed an extensive LIDAR survey in July 2013 at the onset of permitting (as reflected on the as-built survey) and has committed to continue to survey the project area on a semi-annual basis. The next survey is scheduled for mid-April, and will include both the beach and the top of bank. To obtain additional coverage of the geotube installation area during the April survey, SBPF will add additional transects within the project area and 300 feet to the north and south, so that the spacing between transects is approximately every 100-200 feet. . Additionally, as noted previously, the as-built stamp is stamped by a PLS, which is the requirement for the Record Drawing. The design plans for the project, as submitted on November 19, 2013, are likewise stamped by the design engineer. This meets the typical requirements for design and as-built plans. We disagree that the constructed project is a “new” design, the simple omission of the fourth tube did not change the dimensions and locations of the lowest three geotubes, all of which are clearly depicted on the existing design plans. Finally, the attached sketch shows the approximate dimensions and volume of the nourishment template at the completion of construction. Tables 1 and 2 (attached to the “Supplemental Information for March 19, 2014 Hearing”) document that the project has fulfilled its sand delivery requirements. 2. Volume of Sand Delivered Comments: o Written accounting of existing beach sand and supplied nourishment sand… o Delivery slips documenting the volume of nourishment placed on the beach cet1ified by the design engineer. Response: Tables 1 and 2 (attached to the “Supplemental Information for March 19, 2014 Hearing”) document the volumes of sand used for construction and demonstrate that the project has fulfilled its sand delivery requirements. 3. Stormwater Drain Comment: o Stamped As-Built Plan detailing the constructed drainage pipe (an appropriate professional engineer should stamp plans or at a minimum comment on the design). Response: The memo from Mark Haley dated March 12, 2014 addresses the general design of the stormwater drainage pipe. 4. Construction Information Comment: o Written narrative of work required to construct proposed design and appropriate waiver requests for proposal. Response: Response to Nantucket Land Council Letter dated February 14, 2014 2 The construction process has been described in the previous written submittals to the Commission between October and December 2013. Construction information has also been presented at various Conservation Commission meetings between October and February; therefore, we disagree that further information is needed. 5. New Notice of Intent Comment o This "hearing" has consisted of several amended designs and the applicants should be required to submit a new and complete package of information for the newly constructed design so that it can be adequately reviewed by the Commission and by the public. Response The project has established a substantial record of information throughout the hearing process in October, November, and December 2013 that is completely relevant to the emergency project. We disagree that the simple omission of a fourth tube during the winter construction, at the direction of the Commission, constitutes a “new” project. The “Supplemental Information for March 19, 2014 Hearing” document clearly outlines those areas where SBPF and TON are requesting changes to the existing record. 6. Photographs The purpose of the photographs is not explicitly stated; however, we infer it may be related to the matter of the position of the High Tide Line (HTL) and whether the US Army Corps of Engineers (USACE) holds jurisdiction over the project. This matter is exhaustively addressed in the “Supplemental Information for March 19, 2014 Hearing” document and the attached correspondence with the USACE. As indicated in the exchange with the USACE, the HTL was staked on the beach at the beginning of construction. The construction crew was aware of the HTL location on the beach and made every effort to stay landward of that line. We note that the HTL is a stillwater elevation and that the USACE definition of HTL specifically excludes storm surges, of which there were a number during the construction period. As a result, there were times when wave run up moved well landward of the HTL and the construction dike placed to create the slurry trench. We expect that some of the photos depicted these occurrences. The USACE has reviewed our correspondence, discussed the matter extensively with us and others, and has indicated that it is taking no further action on the work completed to date. Response to Nantucket Land Council Letter dated February 14, 2014 3 Figure 1 Approximate Sand Template Sconset Bluff Emergency Project Nantucket, Massachusetts THIS DRAWING IS NOT TO SCALE Approximate Existing Template Volume of 14 CY/LF Total Mitigation Volume of 22 CY/LF Delivered 30' TOP ELEV. 21.3' 5'3-SAND FILLED 45' CIRCUMFERENCE GEOTUBES 30 '