Loading...
HomeMy WebLinkAboutMilone and MacBroom 2013_11_05_201404011029079787“PROJECT SITE VICINITY MAP:PREPARED BY:LOCATION MAP:BAXTER ROAD TEMPORARY STABILIZATIONNOI SUBMISSIONBAXTER ROADNANTUCKET, MASSACHUSETTSPREPARED FOR:TOWN OF NANTUCKETNANTUCKET, MASSACHUSETTSNOT TO SCALENOT TO SCALEOne Financial Plaza1350 Main Street, Suite 1012Springfield, Massachusetts 01103(413) 241-6920 Fax (413) 241-6911www.miloneandmacbroom.comLIST OF DRAWINGSSHEET NO.TITLE1TITLE SHEET2EXISTING CONDITIONS3GENERAL PLAN4TYPICAL CROSS SECTION5FLANKING DETAILDESIGNER:DATE:P.E. NO.:BY:MILONE & MACBROOM, INC.PROJECT SITEMilone & MacBroom, Inc. - 2013PROJECTSITEPROJECT SITEOctober 25, 2013REVISED: NOVEMBER 5, 2013James MacbroomNovember 5, 2013430526CONSTRUCTION STAGING AREA7-11CROSS SECTIONS SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKED--OCT. 25, 20132967-111" = 200'EXISTING CONDITIONS - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROADSLOPE STABILIZATION0'100'200'01/2"1"EXISTSHEET NO.2 OF 11 15+0016+0017+0018+0019+0020+0021+0022+0023+0024+0025+0026+0027+0028+0029+0030+0031+0032+0033+0034+0035+0036+0037+0038+0039+0040+0041+0042+0043+0044+0044+08.52SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKED--OCT. 25, 20132967-111" = 200'GENERAL PLAN - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROADSLOPE STABILIZATIONGENSHEET NO.3 OF 110'100'200'01/2"1" SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKED--OCT. 25, 20132967-11HOR: 1"=20'VERT: 1"=20'TYPICAL CROSS SECTION - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROADSLOPE STABILIZATION0'10'20'01/2"1"TYPSHEET NO.4 OF 11 SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKED--OCT. 25, 20132967-11HOR: 1"=20'VERT: 1"=20'TYPICAL FLANKING DETAIL - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROADSLOPE STABILIZATION0'10'20'01/2"1"TYPSHEET NO.5 OF 11 30+0031+0032+0033+0034+0035+00SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKED--OCT. 25, 20132967-111" = 40'STAGING PLAN - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROADSLOPE STABILIZATIONSTAGINGSHEET NO.6 OF 110'20'40'01/2"1" 23+00-1001020304050607080-10010203040506070800.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0024+00-1001020304050607080-10010203040506070800.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0025+00-1001020304050607080-10010203040506070800.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.00SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKED--OCT. 25, 2013HOR: 1"=40'VERT: 1"=40'CROSS SECTIONS - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROADSLOPE STABILIZATION0'20'40'01/2"1"PROJECT NO.2967-11X-SECTION7 OF 11SHEET NO. 26+00-1001020304050607080-10010203040506070800.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0027+00-1001020304050607080-10010203040506070800.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0028+00-1001020304050607080-10010203040506070800.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.00SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKED--OCT. 25, 2013HOR: 1"=40'VERT: 1"=40'CROSS SECTIONS - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROADSLOPE STABILIZATION0'20'40'01/2"1"PROJECT NO.2967-11X-SECTION8 OF 11SHEET NO. 29+00-1001020304050607080-10010203040506070800.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0030+00-100102030405060708090-1001020304050607080900.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0031+00-100102030405060708090-1001020304050607080900.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.00SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKED--OCT. 25, 2013HOR: 1"=40'VERT: 1"=40'CROSS SECTIONS - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROADSLOPE STABILIZATION0'20'40'01/2"1"PROJECT NO.2967-11X-SECTION9 OF 11SHEET NO. 32+00-100102030405060708090-1001020304050607080900.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0033+00-100102030405060708090-1001020304050607080900.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0034+00-100102030405060708090-1001020304050607080900.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.00SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKED--OCT. 25, 2013HOR: 1"=40'VERT: 1"=40'CROSS SECTIONS - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROADSLOPE STABILIZATION0'20'40'01/2"1"PROJECT NO.2967-11X-SECTION10 OF 11SHEET NO. 35+00-100102030405060708090100-1001020304050607080901000.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0036+00-100102030405060708090100-1001020304050607080901000.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.0037+00-100102030405060708090100-1001020304050607080901000.0025.0050.0075.00100.00125.00150.00175.00200.00225.00250.00275.00300.00325.00350.00375.00400.00425.00450.000.00SHEET NAMEREVISIONS“DATEPROJECT NO.DESIGNEDRSDSCALEDRAWNSMWCHECKED--OCT. 25, 2013HOR: 1"=40'VERT: 1"=40'CROSS SECTIONS - TEMPORARY SLOPE STABILIZATIONNANTUCKET, MASSACHUSETTSBAXTER ROADSLOPE STABILIZATION0'20'40'01/2"1"PROJECT NO.2967-11X-SECTION11 OF 11SHEET NO. 9 2 .4 9 2 .3 9 2 .2 9 0 .8 9 0 .7 9 0 .5BAXTER ROADSANKATY ROADSANKATY HEAD ROADISABELLE'S WAYPOLPIS ROAD ISOBELS WAY ANNES LANE BAYBERRY LANE ELDRIDGE LANE 88 8 9 9 0 9 1 9 2 9 4 9 3 88.3 8 8 .6 8 9 .5 8 9 .2 8 9 .8 9 0 .6 9 1 .5 9 2 .5 9 3 .5 0 0 700 600 500 400 300 200 100 700 600 500 400 300 200 100 800 feet 800 feet 63 69 71 67 65 85 99 97 87 73 83 101 105 109 81 79 93 91 77 117 75 115 113 119 107 107A Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP,swisstopo, and the GIS User Community G:\Projects\Lighthouse\2013\WHG_Profiles\profiles_REV1.mxd Figure 1WHG Survey Lines Baxter Road Nantucket, MA LEGEND Basemap Imagery: 2013 Col-East/2011 ESRI Participating Property WHG Survey Line New WHG Survey Line 0 200 400100Feet1 inch = 400 feetScale1:4,800