Loading...
HomeMy WebLinkAbout2014_4_28 Sconset Bluff Updated Returns Plans_201404281737588627April 28, 2014 Nantucket Conservation Commission 2 Bathing Beach Road Nantucket, MA 02554 Subject: Updated Returns Plans Baxter Road Temporary Stabilization Project (SE 048-2610) Dear Chairman Steinauer: Please find attached plan and isometric views of the returns in a design that should be responsive to the Commission’s requests. Although the Notice of Intent is for four-tiers of geotubes with full returns, as previously submitted, the enclosed plans provide the design information for the Commission to issue an Order for 3-tiers of geotubes, as-built, with geotextile, jute or coir returns, to-be-built. Please note that the isometric plan for the three-tier return also reduces the beach excavation that is applied for in the 4-tier version (+3 to +4 MLW instead of +0 MLW). Neither version would involve any bank excavation. Please also note that the plan view also updates the base map using the current shoreline and bank contours from the survey data gathered for the recently submitted updated as-built of the existing three-tier system. We look forward to discussing this further with the Commission at the April 30 public hearing. Please contact me at (703) 489-8945 or via email at mhartnett@epsilonassociates.com for any questions regarding this submission. Sincerely, EPSILON ASSOCIATES, INC. Maria B. Hartnett Senior Consultant Encl. PRINCIPALS Theodore A Barten, PE Margaret B Briggs Michael E Guski, CCM Dale T Raczynski, PE Cindy Schlessinger Lester B Smith, Jr Robert O’Neal, CCM, INCE Andrew D Magee Michael D Howard, PWS Laura E Rome AJ Jablonowski, PE Douglas J Kelleher Samuel G Mygatt, LLB 1943-2010 ASSOCIATES Maureen A Cavanaugh David E Hewitt, LEED AP Stephen H. Slocomb, PE 3 Clock Tower Place, Suite 250 Maynard, MA 01754 www.epsilonassociates.com 978 897 7100 FAX 978-897-00999 EaM~t ]cV`aa0HM