HomeMy WebLinkAbout2019-9-11Commissioners:
ConCom Minutes for September 11 2019 adopted Sept. 25
CONSERVATION COMMISSION_, T
PUBLIC MEETING T UW N C L E 1 .
2 Bathing Beach Road
Nantucket, Massachusetts 02554 2 � i 9 � � C � � A
www.nantucket-ma.gov 8:49
Wednesday, September 11, 2019
4 Fairgrounds Road, Training Room — 5:00 p.m.
Ashley Erisman (Chair), Ian Golding (Vice Chair), Ernie Steinauer, David LaFleur, Joe Topham,
Seth Engelbourg, and Maureen Phillips
Called to order at 5:00 p.m.
Staff in attendance: Jeff Carlson, Natural Resources Coordinator; Joanne Dodd, Natural Resources Office Administrator
Attending Members: Erisman, Golding, LaFleur, Topham, Engelbourg, Phillips
Absent Members: Steinauer
Late Arrivals: None
Earlier Departure: None
Agenda adopted by unanimous consent
*Matter has not been heard
I. PUBLIC MEETING
A. Announcements
B. Public Comment
1. Burton Balkind — Asked if there were any findings on the sediment he provided at the June 191'.
Carlson — After our Massachusetts Endangered Species Act (MESA) visit, there were questions about the sediment
deposited. That was forwarded to Department of Environmental Protection (DEP) for review, which could result in a
court date; we should have that shortly.
Balldnd — He sent Mr. Carlson photos from the September 71i storm showing the exposed tubes and no walkable
beach. As of today, the tubes are covered. He asked if they are permitted to push beach sand up onto the template. The
picture shows that the sand is darker; and there is a 12" trench on the beach.
Carlson — Excavation outside of installing the geotubes is not part of the permit. He will check on that.
2. R.J. Turcott, Nantucket Land Council — Asked if there have been updates on the quarterly monitoring from `Sconset
Beach Preservation Foundation (SBPF).
Carlson —That is also being reviewed by Mass. DEP. We'll proceed accordingly once we hear from them.
11. PUBLIC HEARING
A. Notice of Intent
1. LAZ Family N.T. — 20 Waqoit Road (90-5) SE48-3131 (Cont. 09/25/2019)
2. Phil Pastan —111 Eel Point Road (32-3) SE48-3231
Sitting Erisman, Golding, LaFleur, Topham, Phillips
Documentation Site and topographical plans, photos, requisite departmental reports and correspondence.
Representative Stan Humphries, Environmental Consulting & Restoration, LLC
Public RJ. Turcott, Nantucket Land Council
Discussion (5:04) Humphries — Reviewed changes to the plan. Provided a letter objection to the claim that the combination of
the sand drift fence and coir logs makes it a coastal engineering structure (CES). The zig-zag fence has been
removed from the plan; it's just coir envelopes. The letter addresses the need for nourishment, 166 cubic
yards (CY) will be committed. We will monitor the amount of sand in front of the coastal bank every year.
There is a waiver request under no adverse impact/no reasonable alternative; the pre -1978 issue is moot.
Turcott — Asked if the Board considers this a dune; coir logs prevent landward movement of the dune.
Golding — After the site visit, he decided it is mostly wind-blown sand; he doesn't think it's a dune.
LaFleur — He agrees that it is wind-blown sand.
Erisman — To her that's a dune; they are mobile and change. There is a history of dune action in this area.
Discussion about whether this is a dune or piled -up, wind-blown sand.
Humphries — He disagrees that the project will prevent landward movement. The dune would have to move
up the bank and deposit itself on top; that is a possibility. It's not migrating laterally.
Erisman — We need a winter without the structure; if it survives, we have a dune. We need that time.
Phillips — The dynamic nature of the dune makes it hard to define it. It's all opinions until we have factual
data. Waiting a year makes sense to her; then we'll have more data on this spot.
Humphries — We'd be willing to accept a condition to postpone the implementation of the project and report
back to the commission.
Turcott — Agrees with the idea of taking the fencing away for a winter.
Humphries — He wants to leave the fence, if we remove it, that could be more disruptive. Asked for a
continuation.
Staff None
Motion Continued to September 251i by unanimous consent.
Vnte N / � TnuPll)ouru rec lice ll
Page l of 6
ConCom Minutes for September 11 2019 adopted Sept. 25
3. Ceylon Elves, LLC — 3 Wyers Way Lot x1(41-380) SE48-3230
4. Ceylon Elves, LLC — 3 Wyers Way Lot B (41-380) SE48-3229
Sitting Erisman, Golding, LaFleur, Topham, Engelbourg, Phillips
Documentation Site and topographical plans, photos, requisite departmental reports and correspondence.
Representative David M. Haines, Haines Hydrogeologic Consulting
Public None
Discussion (5:17) Haines — Asked for a 2 -week continuance to resolve some issues.
Staff None
Motion Continued Lot A and Lot B to September 25th by unanimous consent.
Vote N/A
5. *New England Development — Old South Wharf (42.2.4.2-90) SE48-3239
Sitting Erisman, Golding, LaFleur, Topham, Engelbourg, Phillips
Documentation Site and topographical plans, photos, requisite departmental reports and correspondence.
Representative Katie Barnicle, Wedand Scientist A.E.Com
Mike Duffy, Nantucket Islands Resorts (NIR), LLC
Public None
Discussion (5:19) Barnicle — NIR, LLC wants to repair Old South Wharf northeastern side bulkheads. Bulkheads have about
40 -year lifespan. Addressed comments in letters from Division of Marine Fisheries (DMF) and Mass. DEP.
Resource areas are: flood plain, land subject to tidal action, land under the ocean, land containing shellfish,
and coastal bank. Will install new steel bulkhead in front of and as close to the old steel bulkhead as possible;
corrected an error in the square footage of fill, which will be 1,160 square feet (SF); submitted that correction
to the file. Explained the work protocol. Looking into whether to replace the cap with metal or concrete,
which would be 1 -foot higher to protect the wharf from water inundation; asked for flexibility that the height
be 6" to 1'. Stormwater management, water on the wharf is pretty clean but will create biospheres around
structures to capture roof runoff. Under Chapter 91 License, we have to repair and maintain the bulkhead.
Referred to her letter of responses to the DEP and DMF comments. Found quahogs under some of the outer
piers; were told scallopers will throw quahogs in his area so don't think it's a viable, important shellfish area.
Water quality will be part of our Army Corps of Engineers' permit. This bulkhead was designed to be deep
enough should dredging be necessary in the future. Allowable under the local bylaw and is water dependent.
Golding — Asked what they will do with the silt that ends up in suspension in the water during pile driving.
When this was put in, they ran into issues of oil -saturated sand; asked if they would look at possible oil
saturation.
Barnicle — That would typically be a combination of water and sediment; we allow siltation to settle before
we remove the barrier. There will be a siltation boom in place before work starts. On the landside, we will
relocate some of the utilities; we would have to report it during that process. Typically, we don't sample the
bottom before work and after work; be we aren't dredging so don't anticipate that. Piles are driven down until
the point of "refusal."
LaFleur — Typically the boom will contain the silt; dredging would disturb the bottom much more than pile
driving.
Engelbourg — Asked why the height isn't being based upon the sea -level rise models rather than trying to
guess.
Barnicle — 5.97 is the elevation our modelers have chosen; the question is the materials and what works best.
If we do it on three sides, it creates a bathtub effect. There are various solutions, which we are working
through.
Engelbourg — He'd like to see that process and any innovative strategies coming out of it.
Erisman — Asked where the finger piers will be stored during work; this is a velocity zone.
Duffy - The finger piers will be removed and replaced in kind; there is no storage.
Staff Have everything needed to close.
Motion Motion to Close. (made by: Golding) (seconded by: Engelbourg)
Vote Carried unanimously
6. *262 Polpis Nominee Trust — 262 Polpis Road (25-1) SE48-3240
Sitting Erisman, Golding, LaFleur, Topham, Engelbourg, Phillips
Documentation Site and topographical plans, photos, requisite departmental reports and correspondence.
Representative Brian Madden, LEC Environmental Consulting
Steven Cohen, Cohen & Cohen Law P.C.
Don Bracken, Bracken Engineering
Mark Cutone, Mark Cutone Architect
Public None
Discussion (5:42) Madden — Additions to an existing structure, landscaping, pool, cabana, and remove existing guesthouse: that
area to be restored in kind. All activity is within existing lawn area. Land subject to coastal storm flowage is at
elevation 8; all work is outside that and no structures within the 50 -foot buffer. There will be in -ground water
filtration for pool runoff. Asking for a waiver from 2 -foot separation from high ground water for the pool
and footings; we confirmed the groundwater here is tidally affected; documented it at 5.771 feet during full -
moon high tide Proposed 2,000 SF invasive species management of phragmites within the 25 -foot area.
Page 2 of 6
ConCom Minutes for September 11. 2019. adopted Sept. 25
Phillips — Confirmed all work is between the 50- and 100 -foot buffers. risked if the pool and footings why
the pool isn't being moved to a better location on the lot.
Golding —The waiver is for the deep end of the pool.
Madden — The pool bottom is 12 feet to 4 feet; the shallow end will have the 2 -foot separation but not the
deep end. The house is on a crawl space. The waiver is based on the premise of a long-term net benefit and
no adverse impact.
Cutofie — The deep end of the pool accounts for about 325 SF.
Erisman — There is an area where the lawn extends into the wetland; asked if that will be reestablished.
Reestablishing the boundary is important to the invasive management.
Madden — We can look at that.
Phillips — agrees with Ms. Erisman. One could argue that to be true mitigation, it should last as long as the
structures. Her concern is the long-term impact for structures requiring waivers.
Madden — The existing guesthouse is being removed and those footings are within the 2 feet of groundwater.
They would agree to annual monitoring.
Cohen — The comments about the impact of the pool; our position is there is no negative impact of the pool.
To the point of wetland revegetation, we can accommodate that.
Erisman — The deep end of the pool is well within high water during a storm.
Bracken — Presented the graph they used to monitor, day to day, the fluctuation of groundwater during tides.
Phillips — Asked how the foundation of the guesthouse will be restored.
Madden — Filled to surrounding grade and establish the lawn.
Erisman — Would like to see a plan for reestablishing the wetland and a plant list with native plants for the
record. If they are going to do the 2-1, they'd like to see the plan.
Madden —risked for a 2 -week continuance.
Staff This is a huge site with a lot of areas the intrude upon the wetland buffers.
Motion Continued to September 25f by unanimous consent.
Vote N/A
7. *Chuckrow Nominee Trust — 25 Quaise Road (26-12) SE48-3241 (Cont. 09/25/2019)
8. *3 Pond Road Nominee Trust — 3 Pond Road (56-151.1) NAN - 129
Sitting Erisman, Golding, LaFleur, Topham, Engelbourg, Phillips
Documentation Site and topographical plans, photos, requisite departmental reports and correspondence.
Representative Mark Rits, Site Design Engineering
Public None
Discussion (6:01) Rits — This is for removal of a shed within the 50 -buffer to straddle the 100 -foot buffer. Remove an existing
septic within the 100 -foot buffer and replace with a sewer line. Construct a pervious driveway within the 50 -
and 100 -foot buffers. This is local jurisdiction only. The pool is outside jurisdiction.
Phillips —risked what the firepit consists of.
Staff Have everything needed to close.
Motion Motion to Close. (made by: Engelbourg) (seconded by: LaFleur)
Vote Carried unanimously
9. *Great State Properties — 92 Washington Extension (42.2.3-22) SE48-
Sitting Erisman, Golding, LaFleur, Topham, Engelbourg, Phillips
Documentation Site and topographical plans, photos, requisite departmental reports and correspondence.
Representative None
Public None
Discussion (6:05) Not opened at this time.
Staff We don't have a file number and they have requested a continuance.
Motion Continued to September 25th by unanimous consent.
Vote N/A
10. Gisela Leinhard —11 Jonathan Way (75-42) SE48-3217
Sitting Erisman, Golding, LaFleur, Topham, Engelbourg, Phillips
Documentation Site and topographical plans, photos, requisite departmental reports and correspondence.
Representative Jeff Blackwell, Blackwell & Assoc.
Dan Bailey, Pierce & Atwood, LLP
David M. Haines, Haines Hydrogeologic Consulting
Public R.J. Turcott, Nantucket Land Council
Discussion (6:05) (5:16) By unanimous consent, moved to the end of the NOI's at the representative's request.
Blackwell — He and David Haines reviewed the wetland boundaries; there is a bordering vegetated wetland to
the north as well as an isolated vegetated wetland on the property; submitted the revised site plan.
Haines — When he delineated the wetland the first time, he went to the property line; since then he looked at
information on the abutting property. It is a circular wetland system; it could be due to being in a depression
and water table. He doesn't know of any clay in that area.
Blackwell — We were able to research composting toilets; the owner is willing to incorporate them into this
septic system. Reviewed the various composting toilets and how they reduce contaminants. Under Title 9,
they have to store up to two years of material Applied for the groundwater off -set waiver for the house
Page 3 of 6
93o t abed
•jno uouepuno3 amus
atp 2xrn j sanjasap ease aamosaj ag.L mou uouupuno3 atp aeotuas of asuas smut jt sag so3 'asnoq aqj $utAout
glum $uoie aausgmistp juuoutppe st jusodosd ajeusajju atLL •0$ 01 Ifum axil 1,ust $ttitpauuos $uuJnsjsuoJ loop apts
Dip uo umop Dun:) axis `jou so assom aq pjnom 11 $utnoutas nxpagm `.3tjom ssan$ ne st sjje3 1t uagM — sdglrqd
.1Ig jo janoJ a jnogjtm paljoddns `tttesmJtujs aq j,uptnom Sag,L — anajdr'I
uuatjl $ugM jnouptm uado 13aj azam sjjem atp
3t uaddeq ptnom wq- pa3jsv •sjtem uouepuno3 atp 3o Algtgejs atp jnoge ujjaJuoJ lnoge pwjiej DA — sdijjigd
•jetp op o1 ajgtssod ajam IT 3t pa3pu °3iueq ggj azgtqujsap of $uuuem jou pue asnuJrm Axau
u $utneg uaamlgq aJuujeq a st 1T asneJaq sajum do sVos jetp sanoJ pajeja$an a so3 pa3jse peg aH — 2jnogja2ug
.Imgdoy 'illi ipFA saaAV — Jnaj3E'I
•iatjun3 eaju axil azgtgejsap jjtm 1t `mou uouupumo3 atp gnOnjal am 3t luup pgusaJuoJ s,DH — mmgdo,L
•11 ltuuad Sguuusou j,uop am anxim uasu uu ut 3iJap u ppnq o1 tuaup $utmojje osju st usaJuoJ 13H — ulutusug
•11a3 OZ punoxu aq of IT sassan$ jnq asuas stq aeeg 1,usaop aH — ojs>'gszg
•Treq atp pue paureluretu aq o1 alumnus atp 3o Ind atp tuos3 mou aJuujstp atp p 3jsV — 2jnogja2ug
-,UtP1oJ
•ajasJuoJ st jaa3-S atp jnq `.mou paeotuas aq jt xa3asd pinom aqS — urmsug
•tesodosd
jenotuas jexil uo s1q$noxp so3 pwjsu ' ilpmb suadduq jetp 33njq stgi $uotu uotsosa pexi ae,alA — sdi jpqd
•24amua sjt to pgnotuas aq pjnom uouupuno3
Dip `33njq axil tuos3 1ag3 ;)Ag of lag am uagAN •paureluretu aq jjtm upxou axil o1 east; asatjLL — oiregsvq
(ajgtpnuut st puu Jtut atp $utsn jou st uagog)
•0ued u tptm paJujdgs
aq pjnom 3j3gp amp 'aJuulstp tunuutxutu urelutum o1 asnoq Dip 3o apts amp uo aq jjtm mels ;nj,L — ojjvgsEg
•panouja.T aq jjtm iegm pure $uustxa st xiJjod agj patusguoD — ginogjaSug
•sjajinge amp tuos3 jjoddns 3o sauaj a si an%L •1t sano
pap u tptm asn Imp so3 a2mu$ sapun anup atp $uturelureuj jnq uouepuno3 pajuaun atp 3o Ugas $urssasppe
sauaj pm meld pastnax u papraosd }tttuq $utpoj3 uu uo amjanus u 3o uouuJopj so3 st sp — oj=gseg
•1sanbgs s,anuejuasasdaz DT lu MON 9T44 JO pug axil 01 panouj `luasuoJ snotuttreun gig
•uagoD •jZAZ 3o jeetue zo3 ssaunoJ atues axil pa3IsF' — oijegsrg ((.t:5)
(K:9) uoissnasU
Jui `ttJtmoD pue I j33t3njueN `uoJmL'jZI
JRgnd
D'd mul uagog V uaxioD `uaxioD uaegjS
S;)—nS V $utzaaut$ug 4a3t3n4t-N `ouegseO ij`'
anuejuasaidaU
•aJuapuodsguoJ put; sljodaz juluauuuudap ajtsmbas `sologd `suejd ju:)Tgdes$odoj puu ajtS
uoue4uaum3OCj
sdtijtujI `$mogja$ug `umgdol `snai•tlu-I `2utplog `uumsug
$tjtlltS
Z£Z£-8bgS (Zb-SL) Puo21 sajxeg Lit V S11 — DTI `P21 jamq LIT PUU DTI `p -d sajxug S11 '11
F / N
gjOA
•juasuoJ snotutuuun Sq vtSZ i3gTuajdaS o1 panuuuo:)
1109014
•pajagei SpJauoJ spuupanm atp anuq of aeuq jsn( am talup aql 3o ssajp rIn satjddu psupum aJu u ujo3sad ;nLL
'HOS aq1 tretp amjauls just uoppisas
loo3-00i m0 •,fep a suojiu$ 0££ je jno xuuu put; uouupdas Imp ;o luauujJeua agj 01 s0ud paluasa slot
st uoudaJxa aqj °spuupam ujos3 jaa3 001 $utaq sppq gaaat asmbai jutp suouejtt$as Judas suq HOS jv3ol in0
•aetuu 01 ammo mojje 04 panouu gq snp pa31su puu ajuj st aeuejuasasdas xLL
33VIS
aJuenuuuoJ Spam -Z a $uusanbas sum ttaAmjJutg •jpi pauaguog — urcusug
(•Jttu $utsn joN) — jjaA%jJejg
passajjs st it asneJaq ease stat ttt utouxujsuoJ
$uuttuq pajsa$$ns ffpnjs aqj `lipsuj `asop 1a$ (axil uagm spuepgm pjumoj ansnJ of spuaj sajempunos$
`sjuuuttuujuoJ tjt aseajJUT ue aq jjtnm azagj `alts stop uo Judas u uaaq sanau seg asagj aJuts `puepam axil XU 13
4aa3 0£ptu ssud U m juangja :0661 ut Pauotsstunuoa IN ipnjS uaut�-iatszoH axil paBuetD — uoaml
•pastngs aq of spaau alup atp 3t p33tse `.puepam pajeja$ae pajuiost
axil glum alup ams axil aneq am mou 'puepam paju lm $uuapsoq u sem IT pres uuid juut$uo ;)qL — ueutsug
uouuJoj stxil ut Imp $unop 3jqujso3tuo3 jaa3 j,usaop aH •salemajsem uo Spnjs ssej',qn u of paua3au
•tualsSs Judas aql 3o sluauodtuoJ gluurmga pure uoues4jt3 glum stat jttuzad o1 uoudo agj st asaILL — jjaAunavjg
•sujajsSs Judas 3o aptslno uouusaig uo suoudo lnoqu pa3isV—.$snogja2ug
'HOS atp
uetp ialJtzjs suouejn$as mua 01 Aluotpne amp anug j,usaop tuoDuoD !,�[Iuotpne axil si (I -10q) tpisaH 30 p.Tuog
axil 1nq S apt,L uuxij xajJujs suouejn$az ldopu uuJ ilium uioJ u s,fes S apu Judas amp tuos3 13up umop lou
st puepam atp 113udun asjanpu ou umogs an,Satp s1aa3 aH •ua$outu Danpai su tjam su snsogdsogd sajeuttuga
,ijjettlste tualsSs 3o ad,(4 Stull `•jattol $uusodwoJ aq1 o1 $uto$ an am Stam st Imp `saerem pjag gJaaj joo3-001
axil of 1Jadsas gjtIA •uouJafgo lnotptm pajuux$ uaaq Slauunoj suq ;exit °$ttuglemap ajuitt$as 01 0$e sseaX Zi
jnoqu patisgqujsa sum uouuzedas joo3-Z - -am jmuzJ aqj un o$ of spaau luxp luguodtuoJ japoj $uusodtuoJ
u so3 Ajjumadsa `gnuutualju ou st gjaxp `jsgnba.Tjantem axil xapun uouujudas loo3-Z amp of jJadsas tpl/% — "Ima
•suouujagxiap $u!mp panpts=3 aq 1,upjnogs puu auq Auadosd
sjgj uuos3 jaa3 OOb an spuepam $unpunosms puu puod ssgngN tuo,L •moi; sajempunoA uo suodas uaut,A
-SajssoH paematngZi -ands jmen u uo aq ittm asnog amp °iajumpunoz$ axil aeoge jsnj aq jjtm gJtgm `s$tjuoo3
SZ •j gS Pal opo 6IOZ 11 iaqujaj aS so3 salnutt� ujoDuoD
ConCom Minutes for September 11, 2019, adopted Sept. 25
Topham — He doesn't think moving the house will have that much impact; it's a pretty quiet process.
Removing the foundation is a large disturbance.
Turcott — If the house is in danger and has to be moved, other structures, where that structure was, would also
be in danger and increases liability. The bluff will continue to erode. The foundation should be vacated and
filled in. asked who is responsible if the foundation isn't removed in a timely manner after the bluff comes to
within 5 feet of the wall and it falls over the bluff.
Cohen — His understanding is that removal conditions are typically when the structure becomes exposed
versus a distance.
Gasbarro — If the reuse of the garage is not approved, we wouldn't bother to fill the foundation; as a portion
become exposed, we would remove that portion.
Erisman — Asked how deep the foundation goes.
Gasbarro — It is essential an 8 -foot wall; on the road side, it's only a couple of feet due to how the grade drops.
Golding — Asked about compacted versus uncompacted sand or soil; he thinks you'd want it to be compacted
and the Order of Conditions would be so drafted.
Discussion about the need for a performance bond if the foundation is going to remain in place.
Cohen — Having the escrow money sitting idle way in advance of need would be onerous for his client. There
will be conditions attached to the license from the Select Board as well as Zoning Board of Appeals
restrictions.
LaFleur — We all agree that capping the garage with a deck is not feasible.
Erisman — Wants to keep this open for a plan eliminating the deck over the garage.
Cohen — Asked for a 2 -week continuance.
Staff Removal of the foundation something that would be conditioned with a performance bond in the form of an
escrow account in lieu of action. We can set a time limit after which the performance bond is activated. Five
feet is a good mechanism to start things moving; we don't want to wait until a certain amount is exposed.
At the next meeting, he will have a draft order for the removal of the house and filling the foundation.
Motion Continued to September 25s' by unanimous consent.
Vote N/A
B. Amended Orders of Conditions
1. 85 North Sankaty Road — 85 North Sankaty Road (49-91) SE48-3226
Sitting Erisman, Golding, LaFleur, Topham, Engelbourg, Phillips
Documentation Site and topographical plans, photos, requisite departmental reports and correspondence.
Representative David M. Haines, Haines Hydrogeologic Consulting
Public None
Discussion (7:06) Haines — This amendment is for relocation of the cabana and pool and to add a patio with fire pit; the
demarcation between 25- and 50 -foot buffers has been readjusted. The amount of disturbance is no more than
50%. Nothing will occur outside lawn area.
Staff None
Motion Motion to Approve as an amended order. (made by: Golding) (seconded by: LaFleur)
Vote Carried unanimously
2. Terry Kelley & Aveen Irwin — 87 Hummock Pond Road (56-310.1) SE48-3252
Sitting Erisman, Golding, LaFleur, Topham, Engelbourg, Phillips
Documentation Site and topographical plans, photos, requisite departmental reports and correspondence.
Representative Jeff Blackwell, Blackwell & Assoc.
Public None
Discussion (7:11) Blackwell — This amendment is to allow construction of a shed more than 50 feet from the bordering
vegetated wetland and to swing the driveway around the shed, which requires relocation of a mature privet
hedge. Shed foundation will be a mono -pour, which extends no more than 30 inches into the ground. The
water in the well can fluctuate between 17 feet and 15 feet from the surface.
Engelbourg — Asked what will happen where the hedge is now.
Blackwell — Part will become part of the driveway; the rest would be meadow to be mowed once a year.
Staff None
Motion Motion to Approve as an amended order. (made by: Engelbourg) (seconded by: Topham)
Vote Carried unanimously
III. PUBLIC MEETING
C. Minor Modifications
1. 11 Meadow Lane, LLC —11 Meadow Lane (41-448 Lot 6 B) SE48-3098
Sitting Erisman, Golding, LaFleur, Topham, Engelbourg, Phillips
Documentation Site and topographical plans, photos, requisite departmental reports and correspondence.
Discussion (7:16) None
Staff This is for a deck with steps, outdoor shower, and sewer connection.
Motion Motion to Approve as a minor modification. (made by: Topham) (seconded by: LaFleur)
Vote Carried unanimously
Page 5 of 6
ConCom Minutes for September 11 2019 adopted Sept. 25
D. Certificates of Compliance
1. Sixty -Four Walsh Street, LLC — 66 Walsh Street (formerly 64 Walsh Street Lot 1) SE48-2921 (Cont. 09/25/2019)
2. Hardman — 51B Madaket Road (41-325.1) SE48-3110 (Cont. 11/20/2019)
E. Orders of Condition
1. Marsha Fader — 36 Liberty Street (42.3.4-83) SE48-3206
Sitting Erisman, LaFleur, Topham, Engelbourg, Phillips
Documentation Draft Order of Conditions
Staff Reviewed the conditions; report for use of herbicides, pesticides, and fertilizer, and monitoring photos. We
didn't determine if the pond has a connection. There is finding related to the pond. Condition 26 outlines
reporting. Condition 27 addresses removing pond water. Will add Condition 28 about temporary structures.
Will add Condition 29 about plants to be used.
Discussion (7:17) Erisman — Asked if there is a finding that the pond is now connected to groundwater; we talked about that.
Engelbourg — We talked about seasonal tenting.
Erisman — We talked about no cultivars being added.
Motion Motion to Approve as amended. (made by: LaFleur) (seconded by: Topham)
Vote Carried 6-0 (Golding, recused)
2. Sara & Thomas D.C. Brown & Little — 9 North Avenue (42.4.4-58) SE48-3234
Sitting Erisman, Golding, LaFleur, Topham, Phillips
Documentation Draft Order of Conditions
Staff Reviewed conditions.
Discussion (7:22) None
Motion Motion to Approve as submitted. (made by: LaFleur) (seconded by: Topham)
Vote Carried 6-0 (Engelbourg, recused)
3. New England Development — Old South Wharf (42.2.4.2-90) SE48-3239
Sitting Erisman, Golding, LaFleur, Topham, Engelbourg, Phillips
Documentation Draft Order of Conditions
Staff Reviewed the conditions; memorialized the construction protocol. He will add that.
Discussion (7:24) Engelbourg — Asked if the bulkhead cap height should be conditioned.
Motion Motion to Approve as amended. (made by: Golding) (seconded by: LaFleur)
Vote Carried unanimously
4. 3 Pond Road Nominee Trust — 3 Pond Road (56-151.1) NAN-129
Sitting Erisman, Golding, LaFleur, Topham, Engelbourg, Phillips
Documentation Draft Order of Conditions
Staff Reviewed conditions.
Discussion (7:26) None
Motion Motion to Approve as submitted. (made by: Phillips) (seconded by: LaFleur)
Vote Carried unanimously
F. Other Business
1. Approval of Minutes — 08/28/2019: Adopted by unanimously consent.
2. Monitoring Report: None
3. Reports: None
4. Commissioners Comment:
a. Engelbourg — He was at Hummock Pond when pond management launched their boat; the way they were operating
didn't strike me as safe: an 8 -foot boat holding three people with no life jackets and the fertilizer.
Carlson — We didn't condition the safety of the vessel, but he'll follow up on that. Safety is not within our purview.
Turcott — He was fielding phone calls about that from concerned neighbors.
b. Erisman — Members are encouraged to attend one of the Open Meeting Law sessions Thursday and Friday.
c. Phillips — Asked if there can be an executive session to discuss SBPF litigation with Town Counsel.
Erisman — She wants to hold until we have all information. The Select Board is holding an executive session on
Thursday to discuss that.
Carlson — We'll go over the information from the Select Board session then schedule a ConCom executive session.
5. Administrator/Staff Reports
a. At the next meeting, we will address an incident concerning emptying a pool; it happened last week.
Adjourned at 7:42 p.m. by unanimous consent.
Submitted by:
Terry L. Norton
Page 6 of 6