HomeMy WebLinkAboutIn Town Bike Path Overview_201407081547519172FFY 2015 and 2016 In-Town Multi-Use Path Cost estimate is $1,161,600.20 5.5’ 4’ 11’ 11’ 4’ DRAFT FY 2015-18 TIP FFY 2015 and 2016 In-Town Multi-Use 1.Final design (100%) is under review by MassDOT 2.Recommended to be reprogrammed from FY 2014 to FY 2015 do to May 22nd letter from Local Historical Commission of adverse historical impacts. 3.Additional time recommended to address concerns to determine that the project has no adverse effect to historical resources. 4.Massachusetts Historical Commission will make determination of adverse effect after additional coordination and input from MassDOT Environmental, Local Historical Commission, and Town officials. 5.Cost estimate is $1,161,600.20 FFY 2015 and 2016 In-Town Multi-Use Path Summary of Nantucket Historical Commission Concerns: 1.Destruction or alteration of all or part of the site •Dramatic increase in fill •Path’s 14 foot surface,14+ foot base, and 2 foot elevation vs railroad’s 10 foot surface, 15 foot base, and 2 foot elevation 2.Isolation or alteration of site’s surrounding environment •No certainty that future phases of project will be completed 3.Introduction of elements that are out of character with site •Asphalt, sheeting, and fencing are inappropriate materials. •Project will leave no trace of site’s historic significance. 4.Other concerns: more outreach and visual aids necessary •Photo renderings are necessary •Note regarding outreach: Comments were requested in October 2011, historical/environmental site visit conducted in May 2012 (attended by NHC), public hearing held September 2013, additional request for comments in November 2013 and April 2014 Requested Action: 1.Recommend the NP&EDC amend the FY 2014 – 2017 TIP to include resurfacing a portion of Polpis Road in FY 2014. FFY Action Project ID# Total Federal Source 2014 Delete from Section 1A In-Town Shared Use Path (Washington St to Orange St) (AC-1) 606433 $269,523 $215,618 STP 2014 Add to section 1A Resurfacing and Related Work on Polpis Road from east of North Pasture Lane to Fulling Mill Road 607914 $269,523 $215,618 STP Requested Action: 2.Recommend the NP&EDC approve the FY 2015 – 2018 TIP as shown below Highway: Transit: FFY Highway Projects Project ID Funding Category Federal Funds State Funds Total Funding 2015 In-Town Shared Use Path (Washington St to Orange St) (AC-1) 606433 STP* $193,872 $48,468 $242,340 CMAQ** $65,994 $16,498 $82,492 Projects to be determined TBD HSIP*** $21,998 $2,444 $24,442 2016 In-Town Shared Use Path (Washington St to Orange St) (AC-2) 606433 STP* $234,629 $58,657 $293,286 CMAQ** $54,994 $13,749 $68,743 Projects to be determined TBD HSIP*** $19,798 $2,200 $21,998 2017 Projects to be determined TBD STP* $234,629 $58,657 $293,286 CMAQ** $54,994 $13,749 $68,743 HSIP*** $19,798 $2,200 $21,998 2018 Projects to be determined TBD STP* $234,629 $58,657 $293,286 CMAQ** $54,994 $13,749 $68,743 HSIP*** $19,798 $2,200 $21,998 FFY Transit Agency Line Item Transit Project Carry Over Federal Funds SCA (state aid) LCL (local aid) Total 2015 NRTA 300900 OPERATING ASSISTANCE $531,803 $394,651 $137,152 $1,063,606 2016 NRTA 300900 OPERATING ASSISTANCE 2015 $537,588 $394,651 $142,937 $1,075,176 2017 NRTA 300900 OPERATING ASSISTANCE 2016 $543,287 $394,651 $148,636 $1,086,574 2018 NRTA 300900 OPERATING ASSISTANCE 2017 $549,043 $394,651 $154,392 $1,098,086