HomeMy WebLinkAboutFull Set NOI Plans 3-14-2014_201409050924433260SIGN AND POST
EXISTING PROPOSED
185 CONTOURS
CURBING
DIRECT BURIAL CABLE
OVERHEAD CABLE
BYCL
SYEL
WGL
DYCL
SWEL
YGL
BWLL
SWLL
CW
SL
BROKEN YELLOW CENTER LINE (10' LINE, 30' SPACE TYP.) - 4"
SOLID YELLOW EDGE LINE
WHITE GORE LINE - 12"
DOUBLE YELLOW CENTER LINE
YELLOW GORE LINE - 12"
SOLID WHITE EDGE LINE
BROKEN WHITE LANE LINE (10' LINE, 30' SPACE TYP.)
SOLID WHITE LANE LINE
CROSSWALK
STOP LINE - 12"
SOLID WHITE CHANNELIZATION LINE - 8"SWCHL
SOLID YELLOW CENTER LINE SYCL
DOTTED WHITE LANE LINE - 4" (2' LINE, 4' SPACE)DWLL
EXISTING PROPOSED
LEGEND
SIGN AND POST (TWO POSTS)
LEGEND "ONLY" - WHITE
PAVEMENT ARROW - WHITE
JERSEY BARRIER ON BRIDGE OR JERSEY BARRIER JB OR BRJB
CB CATCH BASIN
CI CURB INLET
BUOY
FLAG POLE
GAS PUMP
DI DROP INLET
MAIL BOX
GRANITE POST
PLANTER
POST
TELEPHONE BOOTH
VAULT
VALVE
WELL
ELECTRIC MANHOLE (HANDHOLE)
GATE POST
FLOW LINE
GAS GATE
BORING HOLE
MONITORING WELL
TEST PIT
CONCRETE HEADWALL
HANDHOLE
STONE HEADWALL
HYDRANT
POLE WITH DOUBLE LIGHT
LIGHT POLE
COUNTY BOUND
GPS POINT
CABLE MANHOLE
ELECTRIC MANHOLE
GAS MANHOLE
STONE BOUND
TRAVERSE OR TRIANGULATION STATION
MISC MANHOLE
OTHER MANHOLE
SEWER MANHOLE
TELEPHONE MANHOLE
TRANS. POLE
WATER MANHOLE
MHD BOUND
MONUMENT
TOWN OR CITY BOUND
WATER GATE
TROLLEY POLE OR GUY POLE
PM
ELECTRICAL GROUND
PARKING METER
UP W ITH 1 LIGHT
UP W ITH FIREBOX
UTILITY POLE
GATE VALVEGV
BUSH
TREE
SWAMP / MARSH
FIRE ALARM BOXFA
RIP RAP
GUARD RAIL
CULVERT
STEEL SHEETING RETAINING WALL
TREE LINE OR LIMIT OF CLEARING AND GRUBBING
BALANCE STONE WALL
DRAIN PIPE (DOUBLE LINE 24 INCH AND OVER)
SEWER MAIN " "
ELECTRIC DUCT " "
GAS MAIN " "
WATER MAIN " "
TELEPHONE DUCT " "
EXISTING PROPOSED
PROPERTY LINE OR APPROXIMATE PROPERTY LINE
TOWN OR CITY LAYOUT
COUNTY LAYOUT
STATE HIGHWAY LAYOUT
EASEMENT
TOWN OR CITY BOUNDARY LINE
RAILROAD SIDELINE
FL
DRAINAGE MANHOLED
STONE DHWL
PLANTER
CONC. HDWL
STUMP
BUSH
HYD
LPDL
LPL
S
VLV
ULT
UPL
UFB
WG
VLT
TPL OR GUY
WELL
BH
CO. BD.
BUOY
MB
FPL
MHB
MON
POST
GRAN POST
SB
TSN
TBH
TEP
TOWN OR CITY BD.
DIRECTION OF TRAFFIC FLOW
EHH
CHAIN LINK FENCE X X X X
BANK OF RIVER OR STREAM
BORDER OF WETLAND
TOP OR BOTTOM OF SLOPE
SAWCUT LINE
CEDAR SPLIT RAIL FENCE
T
LIMIT OF EDGE OF PAVEMENT OR COLD PLAN & OVERLAY
100 FT WETLAND OR 200 FT RIVERFRONT BUFFER
GENERAL SYMBOLS (CONT.)
GUTTER LINE AT DRIVEWAYS
PAVEMENT MARKINGS AND SIGNING SYSBOLS
GENERAL SYMBOLS
606433-HD2 (LEG).DWG24-Jan-2014606433-HD2 (LEG).DWG24-Jan-2014ABBREVIATIONS
AADT
ABAN
ADJ
APPROX.
A.C.
ACCM PIPE
BIT.
BC
BD.
BL
BLDG
BMP
BO
BOS
BR.
CB
CBCI
CC
CCM
CEM
CI
CIP
CLF
CL
CMP
CSP
CO.
CONC
CONT
CONST
CR GR
DHV
DI
DIA
DIP
DW
DWY
ELEV (OR EL.)
EMB
EOP
EXIST (OR EX)
EXC
F&C
F&G
FDN.
FLDSTN
GD
GG
GI
GIP
GRAN
GRAV
GRD
HDW, HW
HMA
HOR
HYD
INV
JCT
L
LB
LP
LT
MAX
MH
MHB
MIN
NIC
NO.
PC
PCC
P.G.L.
PI
POC
POT
PRC
PROJ
PROP
PSB
PVI
PVT
PVMT
PWW
ANNUAL AVERAGE DAILY TRAFFIC
ABANDON
ADJUST
APPROXIMATE
ASPHALT CONCRETE
ASPHALT COATED CORRUGATED
BITUMINOUS
BOTTOM OF CURB
BOUND
BASELINE
BUILDING
BEST MANAGEMENT PRACTICE
BY OTHERS
BOTTOM OF SLOPE
BRIDGE
CATCH BASIN
CATCH BASIN WITH CURB INLET
CEMENT CONCRETE
CEMENT CONCRETE MASONRY
CEMENT
CURB INLET
CAST IRON PIPE
CHAIN LINK FENCE
CENTERLINE
CORRUGATED METAL PIPE
CORRUGATED STEEL PIPE
COUNTY
CONCRETE
CONTINUOUS
CONSTRUCTION
CROWN GRADE
DESIGN HOURLY VOLUME
DROP INLET
DIAMETER
DUCTILE IRON PIPE
STEADY DON'T WALK -
DRIVEWAY
ELEVATION
EMBANKMENT
EDGE OF PAVEMENT
EXISTING
EXCAVATION
FRAME AND COVER
FRAME AND GRATE
FOUNDATION
FIELDSTONE
GROUND
GAS GATE
GUTTER INLET
GALVANIZED IRON PIPE
GRANITE
GRAVEL
GUARD
HEADWALL
HOT MIX ASPHALT
HORIZONTAL
HYDRANT
INVERT
JUNCTION
LENGTH OF CURVE
LEACHING BASIN
LIGHT POLE
LEFT
MAXIMUM
MANHOLE
MASSACHUSETTS HIGHWAY BOUND
MINIMUM
NOT IN CONTRACT
NUMBER
POINT OF CURVATURE
POINT OF COMPOUND CURVATURE
PROFILE GRADE LINE
POINT OF INTERSECTION
POINT ON CURVE
POINT ON TANGENT
POINT OF REVERSE CURVATURE
PROJECT
PROPOSED
PLANTABLE SOIL BORROW
POINT OF VERTICAL INTERSECTION
POINT OF VERTICAL TANGENCY
PAVEMENT
PAVED WATER WAY
R
R&D
RCP
RD
RDWY
REM
RET
RET WALL
ROW
RR
R&R
R&S
RT
SB
SHLD
SMH
ST
STA
SSD
SHLO
SW
T
TAN
TEMP
TC
TOS
TYP
UP
VAR
VERT
VC
WCR
WG
WIP
WM
X-SECT
RADIUS OF CURVATURE
REMOVE AND DISPOSE
REINFORCED CONCRETE PIPE
ROAD
ROADWAY
REMOVE
RETAIN
RETAINING WALL
RIGHT-OF-WAY
RAILROAD
REMOVE AND RESET
REMOVE AND STACK
RIGHT
STONE BOUND
SHOULDER
SEWER MANHOLE
STREET
STATION
STOPPING SIGHT DISTANCE
STATE HIGHWAY LAYOUT LINE
SIDEWALK
TANGENT DISTANCE OF CURVE/
TRUCK PERCENTAGE
TANGENT
TEMPORARY
TOP OF CURB
TOP OF SLOPE
TYPICAL
UTILITY POLE
VARIES
VERTICAL
VERTICAL CURVE
WHEELCHAIR RAMP
WATER GATE
WROUGHT IRON PIPE
WATER METER/WATER MAIN
CROSS SECTION
1.TOPOGRAPHICAL AND WETLAND INFORMATION FROM A PLAN BY GREENMAN-PEDERSEN, INC. ENTITLED "TOWN OF NANTUCKET - IN-TOWN BIKE
PATH" (UNDATED). HORIZONTAL DATUM: NAD83, VERTICAL DATUM: NAVD88.
2.THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY
VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES
BEFORE COMMENCING WORK, AND SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE
CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONTRACTOR SHALL NOTIFY
"DIG-SAFE" (1-888-344-7233) AT LEAST 72 HOURS BEFORE EXCAVATING.
3.WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, THE LOCATION, ELEVATION AND SIZE OF THE UTILITY SHALL
BE ACCURATELY DETERMINED WITHOUT DELAY BY THE CONTRACTOR, AND THE INFORMATION FURNISHED TO THE ENGINEER FOR
RESOLUTION OF THE CONFLICT.
4.THE CONTRACTOR SHALL ALTER THE MASONRY OF THE TOP SECTION OF ALL EXISTING DRAINAGE STRUCTURES AS NECESSARY FOR
CHANGES IN GRADE, AND RESET ALL WATER AND DRAINAGE FRAMES, GRATES AND BOXES TO THE PROPOSED FINISH SURFACE GRADE.
REQUIRED NEW MASONRY SHALL BE CLAY BRICK CONFORMING TO M4.05.2.
5.THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS FOR THE ALTERATION AND ADJUSTMENT OF GAS, ELECTRIC, TELEPHONE AND ANY
OTHER PRIVATE UTILITIES BY THE UTILITY COMPANIES.
6.TREES AND SHRUBS WITHIN THE LIMITS OF GRADING SHALL BE REMOVED ONLY UPON APPROVAL OF THE ENGINEER.
7.CONTRACTOR TO INSPECT AND REMOVE PIPE SEDIMENTS AS DIRECTED BY THE ENGINEER WITHIN THE PROJECT LIMITS INCLUDING PIPES
THAT DISCHARGE TO SPY POND.
8.AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE
CONTRACTOR TO THEIR ORIGINAL CONDITION AT NO EXPENSE TO THE OWNER.
9.THE TERM "PROPOSED" (PROP) MEANS WORK TO BE CONSTRUCTED USING NEW MATERIALS OR, WHERE APPLICABLE, RE-USING EXISTING
MATERIALS IDENTIFIED AS "REMOVE AND RESET" (R&R).
10.ALL LATERAL DRAIN PIPES SHALL BE INSTALLED WITH A PITCH OF .01 FOOT PER FOOT (MINIMUM) UNLESS NOTED OTHERWISE ON THE
DRAWINGS.
11.ALL EXISTING STATE, COUNTY, CITY, AND TOWN LOCATION LINES AND PRIVATE PROPERTY LINES HAVE BEEN ESTABLISHED FROM AVAILABLE
INFORMATION AND THEIR EXACT LOCATION ARE NOT GUARANTEED.
12.THIS PROJECT DISTURBS MORE THAN ONE ACRE OF LAND AND FALLS WITHIN THE NPDES CONSTRUCTION GENERAL PERMIT (CGP) PROGRAM
AND EPA JURISDICTION. PRIOR TO THE START OF CONSTRUCTION CONTRACTOR IS TO FILE A CGP NOTICE OF INTENT WITH THE EPA AND
PREPARE A STORMWATER POLLUTION PREVENTION PLAN IN ACCORDANCE WITH THE NPDES REGULATIONS. CONTRACTOR SHALL CONFIRM
THE OWNER HAS ALSO FILED A NOTICE OF INTENT WITH THE EPA.
13.WETLAND BOUNDARIES ARE BASED ON THE MASSGIS WETLANDS DATA LAYER AND REVIEWED IN THE FIELD BY A VHB ENVIRONMENTAL
SCIENTIST. THE BOUNDARIES WERE REVISED AS NEEDED ON THE PLANS TO REFLECT EXISTING CONDITIONS IN THE FIELD. THE
JURISDICTIONAL STATUS OF THE WETLAND RESOURCE AREAS WAS DETERMINED DURING THE FIELD INVESTIGATION.
14.CONTRACTOR TO REMOVE INVASIVE SPECIES WITHIN THE PROJECT LIMITS. SEE SPECIAL PROVISION 102.3
GENERAL NOTES
PORTLAND ORANGE
METAL PIPE
HH HAND HOLE
GTD GRADE TO DRAIN
PVC POINT OF VERTICAL CURVE
FES FLARED END SECTION
R&D REMOVE AND DISCARD
PT POINT OF TANGENCY
OCS OUTLET CONTROL STRUCTURE
BM BENCH MARK
MTRV MONUMENT TRAVERSE POINT
HTSET HUB WITH TACK SET
FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----2 31
606433
LEGEND, ABBREVIATIONS, & GENERAL NOTES
COMPOST FILTER TUBE
PRF POST & RAIL FENCE
FULL DEPTH PAVEMENT
39
30
31 32 33 34 35
36 37 38
2
0
2122101112131415154
0
4
1
4
2
B
E
G
I
N
+
0
0
.
0
0
E
N
D
+
5
0
.
0
0
5
0
5
1
5
1
B
E
G
I
N
+
0
0
.
0
0
E
N
D
+
5
0
.
0
0 606433-HD3 (KEY).DWG24-Jan-2014606433-HD3 (KEY).DWG24-Jan-201450'0 50'
SCALE 1" = 50'
100'
FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----3 31
606433
KEY PLAN
STA
2
1
+
0
2
.
8
1
GOOSE
POND
LANE
ɔ
=STA
3
0
+
0
0
.
0
0
IN
-
TOWN
MU
LT
I
-USE
PATH
ɔ
STA 20+00.00 GOOSE POND LANE ɔ =
STA 13+33.48 ORANGE STREET ɔ
STA 40+00.00 BEAR STREET ɔ =
STA 12+33.97 ORANGE STREET ɔ
STA 50+00.00 SPRUCE STREET ɔ =
STA 10+69.29 ORANGE STREET ɔ DEPTH PAVEMENT
GRANITE BLOCK
PAVEMENT R&R
PROP 5'-6"
HMA WALK
REM TREES (2)
REM FENCE
PROP GRAN CURB
TYPE VB (TYP)
PROP FULL
DEPTH PAVEMENTSAWCUT SAWCUTPROP FULL
DEPTH PAVEMENTBOS
PROP MICROMILL
AND OVERLAY
R&R MB(4)
SAWCUT
PROP HMA
DRIVE
5 5)(1&(
PROP COMPOST
FILTER TUBES
PROP FULL DEPTH
PAVEMENT LESS THAN 4'
REM HEDGES
REM
HEDGES
LINE OF
EASEMENT
LINE OF
EASEMENT
LINE OF
EASEMENT
REM HEDGES
RET HEDGES
1
2
'
PROP TREE
PROTECTION
END CURB
P
R
O
P
GRAN TRA
N
S
I
T
I
O
N
R&R CURB CORNER
REM TREE
BEGIN R&R BALANCED
STONE WALL, +09
END R&R BALANCED
STONE WALL, +75
R&R EXIST
GRAN CURB
PROP CEM
CONC WALK
R&R BOUND
SAWCUT
RET
RET
RET
RET
RET
RET
PROP FULL
PROP 3" AGED
PINE BARK MULCH
72
100' WETLAND
BUFFER
1
2
3
4
5
LIMIT OF
WETLAND
100' YEAR FLOOD
ELEVATION 8'
RET
RET 303
122202110
11
12
13
14
1540414250
5151PC +64
.49PT
+
1
1
.
0
8
WETLAND PLANT MATERIAL SCHEDULE
KEY BOTANICAL NAME SIZEQTY.
2"-2.5" CALIPERQV2
COMMON NAME
Cherry - Kwanzan
R&R BALANCED
STONE WALL
RET EXIST CURB
AND BRICK WALK
72
R&R
FENCE
(BO)BOSPROP TREE
PROTECTION
(TYP)15'15'15'1
2
'PC +20.39PC +89.89
PT +41.61PT +04.20
10'
BEGIN PROP
STOCKADE
12" MIN CLEARANCE
TO EDGE OF ROAD
PROP 4'-6"
HMA WALK
REM HEDGES
RET
RET
RETMEET EXISTR&R BRICK WALK
PROP
TOPSOIL
PROP GRAN CURB
TYPE VB (TYP)
END CURB PROP
GRAN TRANSITION
GRANITE BLOCK
PAVEMENT R&R
PROP ROADSIDE
TREE PROTECTION
RET STEPS
BOS
STOCKADE
FENCE, +96
PROP FULL
DEPTH PAVEMENT
QV (2)
COMPOST
PROP
PROP 2" COMPOST
TOPSOIL WITH
2" LOAM AND SEED
SEASHELL
WALK
PROP 2" COMPOST
TOPSOIL WITH
2" LOAM AND SEED
RET MB(6)
REM
FENCE, +00
END PROP 606433-HD6 (GEN).DWG24-Jan-2014606433-HD6 (GEN).DWG24-Jan-201420'0 20'
SCALE 1" = 20'
40'
FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----5 31
606433
CONSTRUCTION PLANS
HIGHWAY GUARD DETAILS
NONE
FOR PROFILE: SEE SHEETS NO.8 & 9
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
SEE UTILITY PLANS
DRAINAGE DETAILS
SEE UTILITY PLANS
CONTINUED ON
SHEET NO. 6
STA 21+02.81 GOOSE POND LANE ɔ =
STA 30+00.00 IN-TOWN MULTI-USE PATH ɔ
REMOVE
BOLLARDS
RET TREE
PROP SPLITTER ISLAND WITH
TREES (2)
REMOVE
WALL WITH FENCE
PROP STEEL SHEETING
MULTI-USE PATH
PROP 10'-0"
CONCRETE PAVERS
PROP PRECAST
2" COMPOST TOPSOIL
PROP 2'-0" SHOULDER
PROP FULL DEPTH
PAVEMENT
BEGIN PROP STEEL
SHEETING WALL AND
CEDAR RAIL FENCE +12
BEGIN PROP STEEL
SHEETING WALL +93BOSMULTI-USE PATH
PROP FULL DEPTH
BOS
BOS
BOS
BOS
18" CULVERTS (2)
RETAIN EXISTING
PROP BICYCLE
PARKING RACK
SHEETING WALL +40
END PROP STEEL
PROP FULL
DEPTH PAVEMENT
COBBLE PAVING AND GRANITE
BOS
PROP 6'-0" BENCH (TYP)
PROP LINE OF
TEMP EASEMENT
LINE OF EASEMENT
(TYP)
+7 +88BOS
LINE OF
EASEMENT
WITH 2" LOAM AND SEED
PROP BOULDER
BARRIER (TYP)
TRIM TREE
PROP TREE
PROTECTION
SHEETING WALL +85
END PROP STEEL
QV (3)
INSTALL STEEL SHEETING TO TOP
OF EXISTING CULVERTS MAINTAIN
CONTINUOUS PROP TOP OF
SHEETING (TYP)
PAVEMENT
LIMIT OF
SALT MARSH
LIMIT OF
WETLAND
5234 LIMIT OF FULL DEPTH STEEL SHEETING WALL
RETRETMEET EXIST
FENCE
30
31
32 33
34 35
222
0
2114PI +21.46
PC +64.49
PC +59.70
PC +88.51
PC +41.31 PC +55.92
PT +11.08
PT +82.06 PT +15.15
PT +62.62
QV (1)REMARKSBEGIN PROP CEDAR
RAIL FENCE +85
RAIL FENCE +48
END PROP CEDAR
EDGING TYPE SB (SEE DETAIL)
P
C
+
2
0
.
3
9
PC +89.89 PT +41.61PT +04.20
12'
12'10'10'+43 +51
BOS
PROP COMPOST
FILTER TUBES
PROP FULL DEPTH
MULTI-USE PATH
PAVEMENT (SEE DETAIL)
PROP CEDAR
RAIL FENCE
END PROP CEDAR
5$,/)(1&(
2" COMPOST TOPSOIL
PROP 2'-0" SHOULDER
WITH 2" LOAM AND SEED
PROP 2" COMPOST
TOPSOIL WITH
2" LOAM AND SEED
WATER
MEAN HIGH
ELEV = 1.14
WATER
MEAN HIGH
ELEV = 1.14
WATER
ANNUAL HIGH
ELEV = 2.31
WATER
ANNUAL HIGH
ELEV = 2.31 606433-HD6 (GEN).DWG13-Mar-2014606433-HD6 (GEN).DWG13-Mar-201420'0 20'
SCALE 1" = 20'
40'
FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----6 31
606433
CONSTRUCTION PLANS
HIGHWAY GUARD DETAILS
NONE
CONTINUED ONSHEET NO. 5FOR PROFILE: SEE SHEET NO. 9
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
NONE
CONTINUED ONSHEET NO. 7CONTINUED ON
SHEET NO. 5
CONCRETE PAVERS
PROP PRECAST
2" COMPOST TOPSOIL
PROP 2'-0" SHOULDER
BOS
BOS
BOS
PROP BICYCLE
PARKING RACK
SHEETING WALL +40
END PROP STEEL
FILTER TUBES
PROP COMPOST
SAWCUTPROP 6'-0" BENCH (TYP)
LINE OF EASEMENT
+7 +88
LINE OF
EASEMENT
WITH 2" LOAM AND SEED
DEPTH PAVEMENT
PROP FULL
LIMIT OF
WETLAND
REM TREES (2)
PROP
HMA DRIVE
SHEETING WALL +85
END PROP STEEL
PROP BOULDER
BARRIER (TYP)
QV (3)
LIMIT OF
SALT MARSH
34 35
36
37 38
PI +21.46PC +41.31 PC +55.92PT +62.62
PT +84.36
PT +
4
1
.
2
2
PT +69.66
RETRET
QV (1)
REM
WETLAND PLANT MATERIAL SCHEDULE
KEY BOTANICAL NAME SIZEQTY.
2"-2.5" CALIPERQV4
COMMON NAME
Oak - Black
REMARKS
RAIL FENCE +48
END PROP CEDAR
PROP SPLITTER ISLAND WITH
COBBLE PAVING AND GRANITE
EDGING TYPE SB (SEE DETAIL)10'10'10'10'
FILTER TUBES
PROP COMPOST
PROP 4' WIDE
4" DENSE GRADED
CRUSHED STONE
+43 +51
6
PROP CEDAR
RAIL FENCE
END PROP CEDAR
5$,/)(1&(
2" COMPOST TOPSOIL
PROP 2'-0" SHOULDER
WITH 2" LOAM AND SEED
PROP 2" COMPOST
TOPSOIL WITH
2" LOAM AND SEED
WATER
MEAN HIGH
ELEV = 1.14
WATER
MEAN HIGH
ELEV = 1.14
WATER
ANNUAL HIGH
ELEV = 2.31
WATER
ANNUAL HIGH
ELEV = 2.31 606433-HD6 (GEN).DWG13-Mar-2014606433-HD6 (GEN).DWG13-Mar-201420'0 20'
SCALE 1" = 20'
40'
FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----7 31
606433
CONSTRUCTION PLANS
HIGHWAY GUARD DETAILS
NONE
CONTINUED ONSHEET NO. 6FOR PROFILE: SEE SHEET NO. 9
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
SEE BELOW
DRAINAGE DETAILS
SEE BELOW
9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00
NAVD 88
BASE ELEV
-20.00
-10
0
10
20
30
-20
-10
0
10
20
30
9+00 10+00 10.3411+00 9.919.4912+00 9.068.6413+00 8.217.7914+00 15+00 16+00
0.17%
-0.85%
-1.80%MEET EXISTINGN1752366.7063E100386.0271STA 10+58.00LIMIT OF WORKN1752111.6524E100701.4321STA 14+65.00LIMIT OF WORKORANGE STREET
SPRUCE
STREET
BEAR
STREET
BEAR
WAY
GOOSE
POND
LANE
STA 20+00.00 GOOSE POND LANE ɔ =
STA 13+33.48 ORANGE STREET ɔ
EXISTING
PROPOSED
GRADE
GRADE
STA 40+00.00 BEAR STREET ɔ =
STA 12+33.97 ORANGE STREET ɔ
STA 50+00.00 SPRUCE STREET ɔ =
STA 10+69.29 ORANGE STREET ɔ
BASE FLOOD 8'PROPOSED GRADEMEET EXIST
MEET EXIST GRADE BREAK STA = 10+58.00ELEV = 10.49GRADE BREAK STA = 10+78.00ELEV = 10.52GRADE BREAK STA = 14+20.00ELEV = 7.62GRADE BREAK STA = 14+40.00ELEV = 7.2619+00 20+00 21+00 22+00 23+0019+00 8.3620+00 7.016.3021+00 22+00 23+00
NAVD 88
BASE ELEV
-20.00
-10
0
10
20
-20
-10
0
10
20
-2.00%-3.00%
-1.03%
ORANGE
STREET
IN-TOWN
MULTI-USE PATH
GOOSE POND LANE
STA 20+00.00 GOOSE POND LANE ɔ =
STA 13+33.48 ORANGE STREET ɔ
STA 21+02.81 GOOSE POND LANE ɔ =
STA 30+00.00 IN-TOWN MULTI-USE PATH ɔ
EXISTINGPROPOSED
GRADEGRADE
BASE FLOOD 8'
PROPOSED FULL
DEPTH PAVEMENT
MEET EXISTINGSTA 21+25.00LIMIT OF WORK67$PROPOSED GRADEGRADE BREAK STA = 20+00.00
ELEV = 8.36
GRADE BREAK STA = 20+15.01
ELEV = 8.06
GRADE BREAK STA = 20+60.00
ELEV = 6.71
GRADE BREAK STA = 21+25.00
ELEV = 6.04 606433-HD6 (PROF).DWG24-Jan-2014606433-HD6 (PROF).DWG24-Jan-2014FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----8 31
606433
PROFILES
29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00
HIGH POINT ELEV = 6.56
HIGH POINT STA = 31+43.70
PVI STA = 31+70.00
PVI ELEV = 6.61
A.D. = -3.37%
K = 17.79
60' VC
PVC: 31+40ELEV: 6.55PVT: 32+00ELEV: 5.66227.1' SSD
HIGH POINT ELEV = 6.32
HIGH POINT STA = 36+02.30
PVI STA = 36+00.00
PVI ELEV = 6.50
A.D. = -2.48%
K = 24.23
60' VC
PVC: 35+70ELEV: 6.10PVT: 36+30ELEV: 6.16298.3' SSD
NAVD 88
BASE ELEV
-20.00
Multi-Use Path
-10
0
10
20
-20
-10
0
10
20
29+00 6.2630+00 6.366.4731+00 6.545.6632+00 4.082.8433+00 3.173.8334+00 4.505.1735+00 5.836.3136+00 5.935.3637+00 38+00 39+00 40+00
0.21%
-3.16%1.33%
-1.14%
LOW POINT ELEV = 2.78
LOW POINT STA = 33+12.21
PVI STA = 33+00.00
PVI ELEV = 2.50
A.D. = 4.50%
K = 13.34
60' VC
PVC: 32+70ELEV: 3.45PVT: 33+30ELEV: 2.90GOOSE POND
LANE
MULTI-USE PATH
EXTENSION
WASHINGTON STREET
MEET EXISTINGN1752402.3562E101397.6541STA 37+71.00LIMIT OF WORKEXISTING GRADE
PROPOSED GRADE
STA 21+02.81 GOOSE POND LANE ɔ =
STA 30+00.00 IN-TOWN MULTI-USE PATH ɔ
IN-TOWN
BASE FLOOD 8'
ANNUAL HIGH WATER 2.31
MEAN HIGH WATER 1.14
MEAN LOW WATER -1.89
EXISTING GRADE
PROPOSED GRADE
PROP FULL
DEPTH PAVEMENT
PROPOSED GRADE606433-HD6 (PROF).DWG24-Jan-2014606433-HD6 (PROF).DWG24-Jan-2014FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----9 31
606433
PROFILES
3
303
12021404142505151
END +99.45PC +20.39
PC +89.89PT +41.61PT +04.20
PC +64
.49PT
+
1
1
.
0
8
PC +21.62
7.85' LT
BEGIN +00.
0
0
PC +08.45 PT +75.31
END +32.53
10.24
10.21
10.21
10.04
9.82
9.98
9.61
9.79
9.40
9.56
9.19
9.28
8.97
9.06
8.84
8.76
8.55
8.33
8.24 7.97 7.73
7.53
7.19
7.19
7.447.75
7.94
8.04
8.13
8.34
8.55
8.76
8.51
6.766.766.396.396.186.175.955.94STA 50+00.00 SPRUCE STREET ɔ =
STA 10+69.29 ORANGE STREET ɔ =
STA 40+00.00 BEAR STREET ɔ =
STA 12+33.97 ORANGE STREET ɔ =
STA 20+00.00 GOOSE POND LANE ɔ =
STA 13+33.48 ORANGE STREET ɔ =
PC +15.35
15.00' RT
PT +26.70
7.73' RT
PT +53.89
11.33' RT
PC +11.87
3.22' LT
PT +14.26
5.19' LT PT +22.26
3.19' LT
PC +22.26
0.74' RT
PC +11.87
0.78' RT
PT +14.26
2.74' RT14.92'8.85'15.00'15.89'15.42'12.40'12.62'12.77'15.00'11.55'1
2
.
0
0
'
7.73'
6.70
'
6.
0
0
'
5.0
0
'
5.
4
2
'
10.00'15.00'+82.48
15.00'+05.00
+43.49
+23.95
CONSTRU
C
T
I
O
N
ɔ
14.29'14.77'+25.09 +37.41
PC +46.07
13.80' LT
PT +35.68
11.38' LT
Curve Table
Curve #Delta Radius Length
2.47'
GOOSE POND LANE CONSTRUCTION BASELINE DATA
NUMBER
L5
C3
L6
C4
L7
STARTING
STATION
20+00.00
20+20.39
20+41.61
20+89.89
21+04.20
NORTHING
100608.080
100620.740
100628.406
100632.284
100634.449
EASTING
1752204.932
1752220.912
1752240.376
1752288.493
1752302.627
CURVE DATA
R=36.00
L=21.22' T=10.93'
R=100.00
L=14.31' T=7.17'
LINE DATA
1
(
20.39'
1
(
48.27'
1
(
95.25'
ENDING
STATION
20+20.39
20+41.61
20+89.89
21+04.20
21+99.45
NORTHING
100620.740
100628.406
100632.284
100634.449
100655.564
EASTING
1752220.912
1752240.376
1752288.493
1752302.627
1752395.507
ORANGE STREET CONSTRUCTION BASELINE DATA
NUMBER
L1
C1
L2
STARTING
STATION
10+00.00
13+08.45
14+75.31
NORTHING
100339.085
100588.727
100707.765
EASTING
1752400.771
1752219.610
1752103.522
CURVE DATA
R=575.00
L=166.86' T=84.02'
LINE DATA
1
:
308.45'
1
:
57.22'
ENDING
STATION
13+08.45
14+75.31
15+32.53
NORTHING
100588.727
100707.765
100742.527
EASTING
1752219.610
1752103.522
1752058.066
10
11
12
13
14
15 606433-HD7 (ALGN).DWG24-Jan-2014606433-HD7 (ALGN).DWG24-Jan-201420'0 20'
SCALE 1" = 20'
40'
FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----10 31
606433
CURB TIE & GRADING PLANS
FOR PROFILE: SEE SHEETS NO.8 & 9
CONTINUED ON
SHEET NO. 11
BOS
BOS
+7 +88
R=50' L=93'
30 31
32 33
34 35
2
0
21END +99
.45
PC +20.39
PC +89.89PT +41.61PT +04.20
PI +21.46
PC +64.49
PC +59.70
PC +88.51
PC +41.31 PC +55.92
PT +11.08
PT +82.06 PT +15.15
PT +62.62PC +21.627.85' LTPC +08.458.247.977.737.537.757.948.046.766.766.396.396.186.175.955.94STA 21+02.81 GOOSE POND LANE ɔ =
STA 30+00.00 MULTI-USE PATH ɔ =
PC +15.3515.00' RT
PT +26.707.73' RT PT +53.8911.33' RTPC +11.873.22' LTPT +14.265.19' LTPT +22.263.19' LTPC +22.260.74' RT0.78' RTPT +14.262.74' RT12.40'12.62'12.00'
7.73'6.70'
6.00'
5.00'
5.42'10.00'10.00'10.00'15.00'14.29'14.77'+25.09+37.41PC +46.0713.80' LTParcel Table
Line #/Curve #Length Direction/Delta Radius Tangent
MULTI-USE PATH CONSTRUCTION BASELINE DATA
NUMBER
L8
L9
C5
C6
L10
C7
L11
C8
L12
L13
C9
STARTING
STATION
30+00.00
31+11.08
30+64.49
31+59.70
31+82.06
32+88.51
33+15.15
33+41.31
33+62.62
34+21.46
35+55.92
NORTHING
100634.151
100742.684
100696.706
100791.224
100813.453
100918.729
100945.237
100971.372
100992.568
101050.765
101184.206
EASTING
1752301.273
1752324.027
1752316.959
1752326.912
1752329.233
1752345.013
1752347.553
1752348.657
1752350.687
1752359.407
1752375.929
CURVE DATA
R=250.00
L=46.58' T=23.36'
R=250.00
L=22.36' T=11.19'
R=250.00
L=26.64' T=13.33'
R=200.00
L=21.30' T=10.66'
R=80.00
L=28.43' T=14.37'
LINE DATA
1
(
64.49'
1
(
48.63'
1
(
106.45'
1
(
26.16'
1
(
58.85'
1
(
134.46'
ENDING
STATION
30+64.49
31+59.70
31+11.08
31+82.06
32+88.51
33+15.15
33+41.31
33+62.62
34+21.46
35+55.92
35+84.36
NORTHING
100696.706
100791.224
100742.684
100813.453
100918.729
100945.237
100971.372
100992.568
101050.765
101184.206
101212.448
EASTING
1752316.959
1752326.912
1752324.027
1752329.233
1752345.013
1752347.553
1752348.657
1752350.687
1752359.407
1752375.929
1752374.38714 606433-HD7 (ALGN).DWG24-Jan-2014606433-HD7 (ALGN).DWG24-Jan-201420'0 20'
SCALE 1" = 20'
40'
FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----11 31
606433
CURB TIE & GRADING PLANS
CONTINUED ONSHEET NO. 10FOR PROFILE: SEE SHEET NO. 9 CONTINUED ONSHEET NO. 12CONTINUED ON
SHEET NO. 10
BOS
+7 +88
R=50' L=93'
34 35
36
37 38 END +77.91
PI +21.46PC +41.31 PC +55.92PT +62.62
PT +84
.
3
6
PT +41.22
PT +69.66
PC +79.26
3.87' LT
PT +81.65
1.91' LT
PT +81.66
2.09' RT
PC +79.27
4.06' RT
PC +71.26
1.86' LT
PT +71.26
2.06' RT10.00'10.00'Parcel Table
Line #/Curve #Length Direction/Delta Radius Tangent
MULTI-USE PATH CONSTRUCTION BASELINE DATA
NUMBER
C9
C8
L12
L13
C10
C11
L14
STARTING
STATION
35+55.92
33+41.31
33+62.62
34+21.46
35+84.36
36+41.22
36+69.66
NORTHING
101184.206
100971.372
100992.568
101050.765
101212.448
101267.704
101294.717
EASTING
1752375.929
1752348.657
1752350.687
1752359.407
1752374.387
1752381.228
1752389.611
CURVE DATA
R=80.00
L=28.43' T=14.37'
R=200.00
L=21.30' T=10.66'
R=80.00
L=56.87' T=29.69'
R=80.00
L=28.43' T=14.37'
LINE DATA
1
(
58.85'
1
(
134.46'
1
(
208.25'
ENDING
STATION
35+84.36
33+62.62
34+21.46
35+55.92
36+41.22
36+69.66
38+77.91
NORTHING
101212.448
100992.568
101050.765
101184.206
101267.704
101294.717
101501.390
EASTING
1752374.387
1752350.687
1752359.407
1752375.929
1752381.228
1752389.611
1752415.200MEET EXISTING606433-HD7 (ALGN).DWG24-Jan-2014606433-HD7 (ALGN).DWG24-Jan-201420'0 20'
SCALE 1" = 20'
40'
FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----12 31
606433
CURB TIE & GRADING PLANS
CONTINUED ONSHEET NO. 6FOR PROFILE: SEE SHEET NO. 9
11'11'
4'1
2
'
STA 20+00.00 GOOSE POND LANE ɔ =
STA 13+33.48 ORANGE STREET ɔ
STA 40+00.00 BEAR STREET ɔ =
STA 12+33.97 ORANGE STREET ɔ
STA 50+00.00 SPRUCE STREET ɔ =
STA 10+69.29 ORANGE STREET ɔ
SWEL
DYCL
SWEL
8' CWSL
R1-1 (30")
W11-2
D3-1
D3-3
W16-7p
+27
+44
+24
+55
+8
+15
W11-15
W11-15
D3-1
D3-2
SWEL
+1510
11
12
13
14
15
15
PC +08.45 PT +75.31
2021PC +20.39PC +89.89 PT +41.61PT +04.20
30404142606433-HD8 (STRP).DWG24-Jan-2014606433-HD8 (STRP).DWG24-Jan-201420'0 20'
SCALE 1" = 20'
40'
FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----13 31
606433
TRAFFIC SIGN & PAVEMENT MARKINGS
CONTINUED ON
SHEET NO. 14
STA 21+02.81 GOOSE POND LANE ɔ =
STA 30+00.00 IN-TOWN MULTI-USE PATH ɔ
SLR1-1 (18")
R5-3 SYCL
R5-3
D3-3
END SYCL +1514PC +08.45222
0
21P
C
+
2
0
.
3
9
PC +89.89PT +41.61PT +04.20
30
31
32 33
34 35PI +21.46
PC +64.49
PC +59.70
PC +88.51
PC +41.31 PC +55.92
PT +11.08
PT +82.06 PT +15.15
PT +62.62
SYCL 606433-HD8 (STRP).DWG24-Jan-2014606433-HD8 (STRP).DWG24-Jan-201420'0 20'
SCALE 1" = 20'
40'
FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----14 31
606433
TRAFFIC SIGN & PAVEMENT MARKINGS
CONTINUED ONSHEET NO. 13CONTINUED ONSHEET NO. 15CONTINUED ON
SHEET NO. 13
SLR1-1 (18")
SYCL
R5-3
+75
39
34 35
36
37 38
PI +21.46PC +41.31 PC +55.92PT +62.62
PT +84.36
PT +
4
1
.
2
2
PT +69.66
R7-1dBEGIN SYC
L 606433-HD8 (STRP).DWG24-Jan-2014606433-HD8 (STRP).DWG24-Jan-201420'0 20'
SCALE 1" = 20'
40'
FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----15 31
606433
TRAFFIC SIGN & PAVEMENT MARKINGS
CONTINUED ONSHEET NO. 14
R&R UP (BO)
ADJ
ADJ
ADJ(BO)
ADJADJ
ADJ
ADJ
ADJ
ADJ
R&R UP(BO)
R&R
STA
2
1
+
0
2
.
8
1
GOOSE
POND
LANE
ɔ
=STA
3
0
+
0
0
.
0
0
IN
-
TOWN
MU
LT
I
-USE
PATH
ɔ
STA 20+00.00 GOOSE POND LANE ɔ =
STA 13+33.48 ORANGE STREET ɔ
STA 40+00.00 BEAR STREET ɔ =
STA 12+33.97 ORANGE STREET ɔ
STA 50+00.00 SPRUCE STREET ɔ =
STA 10+69.29 ORANGE STREET ɔ
ORANGE STREET DRAINAGE STRUCTURE DATA
NO.
1
2
TYPE
CB
EX DMH
STATION
12+38.6
14.0 R
12+38.3
12.1 L
RIM ELEV.
8.88
8.95
INV. IN
(1) 5.24
INV. OUT
5.38
REMARKS
PROP GUY (BO)
ADJ
PROP EHH
PROP THH (BO)
PROP CATV HH (BO)
GUY(BO)
PROP EHH
PROP THH (BO)
PROP CATV
HH (BO)
,1&+(/(&&21'8,7
TYPE NM (4 BANK)
ADJ
ADJ
REM
UP(BO)303
122202110
11
12
13
14
15
1540414250
5151PC +20.39PC +89.89PT +41.61PT +04.20
PC +64
.49PT
+
1
1
.
0
8
ADJ
R&R PROPANE 22' - 12" RCP1
2
ADJ WM
ADJ
ADJ
ADJ
ADJ
ADJ
PROP GUY (BO)
TANKS (BO)
PROP 2-3" ELEC COND TYPE RM
GALVANIZED RISERS AND SWEEPS
PROP 2-3" ELEC COND TYPE NM
PLASTIC SWEEPS
ADJ 606433-HD8 (UTIL).DWG24-Jan-2014606433-HD8 (UTIL).DWG24-Jan-201420'0 20'
SCALE 1" = 20'
40'
FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----17 31
606433
UTILITY PLANS
CONTINUED ON
SHEET NO. 18
18" CULVERTS (2)
RETAIN EXISTING
+7 +88
STA 21+02.81 GOOSE POND LANE ɔ =
STA 30+00.00 IN-TOWN MULTI-USE PATH ɔ
ADJ ADJ
INSTALL STEEL SHEETING TO TOP
OF EXISTING CULVERTS MAINTAIN
CONTINUOUS PROP TOP OF
SHEETING (TYP)
LIMIT OF FULL DEPTH STEEL SHEETING WALL
ADJ30 31
32 33
34 35
222
0
2114P
C
+
2
0
.
3
9
PC +89.89PT +41.61PT +04.20
PC +64.49 PT +11.08
PC +59.70 PT +82.06 PC +88.51 PT +15.15 PC +41.31 PT +62.62 PI +21.46 PC +55.92
ADJ 606433-HD8 (UTIL).DWG24-Jan-2014606433-HD8 (UTIL).DWG24-Jan-201420'0 20'
SCALE 1" = 20'
40'
FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----18 31
606433
UTILITY PLANS
CONTINUED ONSHEET NO. 17CONTINUED ONSHEET NO. 19CONTINUED ON
SHEET NO. 17
+7 +88 ADJ
39
34 35
36
37 38
PC +41.31 PT +62.62 PI +21.46 PC +55.92
PT +84
.
3
6
PT +
4
1
.
2
2
PT +69.66
RET
ADJ 606433-HD8 (UTIL).DWG24-Jan-2014606433-HD8 (UTIL).DWG24-Jan-201420'0 20'
SCALE 1" = 20'
40'
FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----19 31
606433
UTILITY PLANS
CONTINUED ONSHEET NO. 18
10'-0"
HOT MIX ASPHALT
2'-0"
GRASS
2'-0"
GRASS
5'-0" (TY
P
)
PATH
EDGING
TYPE SB (TYP)COBBLE
PAVING
2'-0"
RADIUS
(TYP)
MULTI-USE PATH SHLDRSHLDR
12" WHITE
STOP LINE
WITH COBBLE PAVING
SCALE:NOT TO SCALE
DWG:
DEC 2005DATE:
SPLITTER ISLAND
BOULDER
BARRIERBOULDER
BARRIER 9'-0" (TYP)12'-0" (TYP)24" DETECTABLE
WARNING PANEL
A A
SECTION A-A
TYPE SB (TYP)
VARIOUS SIZES
PROP BEACH COBBLES
4" CEMENT MORTAR (M4.02.15)
EXIST. EDGE
OF ROAD
8'-0"4'-0"8'-0"
CEMENT CONCRETE
PROP FULL DEPTH MULTI-USE
SEE NOTES
PAYMENT FOR CEMENT CONCRETE
SETTING BED
RAISE GRAVEL BORROW
2-IN HIGHER AT CENTER
OF ISLAND
1-INCH MAX.
COBBLES PROTRUDE
4" (MIN)
GRAVEL BORROW
NOTE:
BE INCLUDED IN THE UNIT PRICE
BID FOR GRANITE EDGING.
FOR EDGING INSTALLATION SHALL7'-0" (TYP)CEMENT CONCRETE
SIDEWALK AT ROADWAY
(M/E 107.6.5R)
6" MIN
12" MAX
SCALE:SCALE:
S-STD.
H-STD.
NOT TO SCALE
BOULDER BARRIER
3/4 - 1 C.Y. STONE BOULDER
MACHINE PLACED WITH A MIN.
OF 6" EMBEDMENT
MULCH OR LOAM & SEED
6" GRAVEL BORROW SUBBASE
EXISTING SOIL
TO BE SPACED 6' O.C. WHEN MORE THAN ONE
NOTE:24"-36"9"
(MIN)
CONCRETE
FOOTING
GRADE
FINISHED
BICYCLE RACK UNITS SHALL CONSIST OF FOUR INVERTED "U" PIPES
INVERTED "U" PIPES SHALL BE PLACED PARALLEL TO EACH OTHER
CONCRETE SHALL BE 4000 PSI, 3/4 IN, 565 CEMENT CONCRETE
1.
2.
3.
NOTES:
SCALE:
BICYCLE RACK
NOT TO SCALE6"(MIN)30 INCHES ON CENTER
16.5"-24"
PROP GRAN EDGING
PROP GRAN
PATH PAVEMENT 30" (TYP)30" CLEAR(TYP)PLAN
RACK SYSTEM
4-UNIT BICYCLE
30" CLEAR
(TYP)ROOTBALL SHALL BE PLACED ON
TREE WRAP SHALL NOT BE USED
COMPLETELY REMOVE SYNTHETIC BURLAP & LACING
BACKFILL MIX PER SPECIAL PROVISIONS
DURING THE FIRST 24 HOURS AFTER PLANTING
WATERING SAUCER SHALL BE FLOODED TWICE
TREE SHALL BE SET PLUMB
ABOVE FINISHED GRADE AFTER SETTLEMENT
CUT & ROLL BACK 1/3 OF BURLAP BEFORE BACKFILLING.
3 INCH HIGH EARTH WATERING SAUCER AROUND TREE PIT
2-3 INCHES AGED PINE BARK MULCH (PULL MULCH AWAY
TREE SHALL BE PLANTED SO THAT CROWN IS 3 INCHES
MIN. 2 X ROOTBALL DIAMETER
ROOTBALL
UNDISTURBED SUBGRADE
DO NOT CUT LEADER
FROM TRUNK OF TREE)
6 INCHES
BELOW
ROOTBALL
DECIDUOUS TREE PLANTING
H-STD.
S-STD.
SCALE: NOT TO SCALE
*
EXIST. EDGE
OF ROAD
BOULDER
BARRIER
BOULDER
BARRIER
A A
2'-0"
RADIUS
(TYP)
10'-0"
HOT MIX ASPHALT
2'-0" GRASS
MULTI-USE PATH
SHOULDER
2'-0" GRASS
SHOULDER
5'-0" (T
Y
P
)
PATH
9'-0"
24" DETECTABLE
WARNING PANEL
(M/E 107.6.5R)
6" MIN
12" MAX
CEMENT CONCRETE
SIDEWALK AT ROADWAY12'-0" (TYP)COBBLE
PAVING
EDGING
TYPE SB (TYP)
PROP GRAN
STATION 30+15STATION 36+80
12" WHITE
STOP LINE
CONCRETE
FOOTING 606433-HD5 (DET).DWG24-Jan-2014606433-HD5 (DET).DWG24-Jan-2014FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----22 31
606433
CONSTRUCTION DETAILS
* VERTICAL TRANSITION
30" TYP
*DRIVEWAY SLOPED TO MEET BACK OF SIDEWALK GRADE
PAVEMENT
TREATMENT VARIES
HMA DRIVE
CEM CONC RAMP
PROP VERTICAL GRANITE CURB
SURFACECEM1.5%
SECTION A-A
BACK OF
SIDEWALK
SAWCUT
EXIST
HMA DRIVE
A
MIN
30" TYP
GUTTER LINE
HMA
DRIVE
DRIVEWAY WIDTH VARIES
SAWCUT & MEET EXISTHMA DRIVE
BACK OF SIDEWALK LINE
A
EDGE OF DRIVE
EXIST. CURB OR
PLAN
TRANSITION SECTION - TYP
24"
36"
36" MIN 24"
HMA DRIVEWAY
1" LIP
DWG:
DATE:
SCALE:
HMA
WALK WALK
VARIES
TYPICAL DRIVEWAY WITH FULL DEPTH
PAVEMENT CONSTRUCTION - BEAR WAY
NOT TO SCALE
APRIL 2003
DRIVE-12
CONC CONC
RAMP
CEM5'-0" MIN4"X4" PRESSURE TREATED SIGN POST
PAINTED "NANTUCKET GRAY"7'-0" TYP*THIS DIMENSION SHALL BE A MINIMUM OF 5' AND
A MAXIMUM OF 8' FOR ACCESSIBLE SIGNAGE IN
THE COMMONWEALTH OF MASSACHUSETTS.
*THIS DIMENSION SHALL BE A MINIMUM OF 5' FOR
ACCESSIBLE SIGNAGE.
*
2&7<3
Fence Elevation
WHITE CEDAR POST
Fence Post*32"72"30"GRADE
18"
FINISHED
PIN AT END POSTS
* TREAT THIS SECTION OF POST WITH A
WOOD PRESERVATIVE AS SPECIFIED
BY THE FENCE MANUFACTURER.
12" CHAMFERED TOP
612"
SCALE:SCALE:
S-STD.
H-STD.
NTS
CEDAR RAIL FENCE
10"-12" APPROX.
SCALE:SCALE:
S-STD.
H-STD.
NTS
SIGN POST
ATTACH SIGN TO WOOD POST WITH
TWO 12" DIA. X 212" LONG GALVANIZED
LAG BOLTS AND WASHERS
PROPOSED SIGN - SEE
PLANS FOR TYPE AND
LOCATION
FINISH GRADE, MATERIAL VARIES -
SEE DRAWINGS
16" DIA. CEMENT CONCRETE FOOTING
36"8'
24"
EDGE OF PAVEMENT
12"
OF THERMOPLASTIC.
(TWO - 6" LINES) WILL BE ACCEPTED.
2. LAYOUT OF CROSSWALKS SHALL BE APPROVED BY A
1. ALL 12" THERMOPLASTIC LINES SHALL BE APPLIED
IN ONE APPLICATION, NO COMBINATION OF LINES
NANTUCKET DPW REPRESENTATIVE PRIOR TO APPLICATION
12"STOP LINENOTES:
4'
CROSSWALK INSTALLATION
H-STD.
S-STD.
SCALE: NOT TO SCALE
OR CURB LINE (TYP)
3'-0" MIN
EDGE OF HMA BIKE PATH
SCALE:SCALE:
S-STD.
H-STD.
NTS
TYPE NM (4 BANK)
E
E C
T
PROP 3" ELEC CONDUIT
TYPE NM - PLASTICSAND2'-6"1'-6"6" DETECTABLE METALLIC
WARNING TAPE (ORANGE)
6" DETECTABLE METALLIC
WARNING TAPE (RED)
PROP PAVEMENT SURFACE
3"3"3"3"6"
3"
3"
3"
CONCRETE
ENCASED
3" ELECRICAL CONDUIT -
E = ELECTRIC
T = TELEPHONE
C = CABLE TV
1712
10"-12" APPROX.
212"X7" WHITE
CEDAR POST
WHITE CEDAR
HAND-HEWN SPLIT RAIL
7"
2"X6" RAIL
SLOT (TYP)40"RAMP
CEM
CONC 606433-HD5 (DET).DWG24-Jan-2014606433-HD5 (DET).DWG24-Jan-2014FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----23 31
606433
CONSTRUCTION DETAILS
DIR
E
C
T
I
O
N
O
F
F
L
O
W
COMPOST FILTER TUBE
MINIMUM 12 INCHES IN DIAMETER WITH AN
EFFECTIVE HEIGHT OF 9.5 INCHES.
TUBES FOR COMPOST FILTERS SHALL BE JUTE
MESH OR APPROVED BIODEGRADABLE
MATERIAL. ADDITIONAL TUBES SHALL BE USED
AT THE DIRECTION OF THE ENGINEER.
UNDISTURBED SUBGRADE
TAMP TUBES IN PLACE TO ENSURE GOOD
CONTACT WITH SOIL SURFACE. IT IS NOT
NECESSARY TO TRENCH TUBES INTO EXISTING
GRADE.
2 IN. DEEP x 12 IN. WIDE LAYER OF LOOSE
COMPOST MATERIAL PLACED ON UPHILL/FLOW
SIDE OF TUBES TO FILL SPACE BETWEEN SOIL
SURFACE AND TUBES.
PROVIDE A 3 FT. MINIMUM OVERLAP AT ENDS OF
TUBES TO JOIN IN A CONTINUOUS BARRIER AND
MINIMIZE UNIMPEDED FLOW.
STAKE JOINING TUBES SNUGLY AGAINST EACH
OTHER TO PREVENT UNFILTERED FLOW
BETWEEN THEM.
SECURE ENDS OF TUBES WITH STAKES SPACED
18 IN. APART THROUGH TOPS OF TUBES.
DIRECTION OF FLOW PROTECTED AREALIMIT OF WORK
COMPOST FILTER TUBE (TYP.)
LOOSE COMPOST LAYER
UNTREATED HARDWOOD STAKE (TYP.)
2 INCH X 2 INCH X 3 FEET UNTREATED
HARDWOOD STAKES, UP TO 5 FT. APART OR AS
REQUIRED TO SECURE TUBES IN PLACE.
WHEN STAKING IS NOT POSSIBLE, SUCH AS
WHEN TUBES MUST BE PLACED ON PAVEMENT,
HEAVY CONCRETE OR CINDER BLOCKS CAN BE
USED BEHIND TUBES UP TO 5 FT. APART OR AS
REQUIRED TO SECURE TUBES IN PLACE.
3.0 FT. MIN.AREA OF DISTURBANCEINSTALLATION TO OCCUR AT OR WIITHIN LIMIT
OF WORK TO PREVENT IMPACTS TO RESOURCE
AREAS.
DWG:
DATE:
SCALE:
N/A
SEPT 2011
NOT TO SCALE
COMPOST FILTER TUBES
PLAN VIEW - JOIN DETAIL
N.T.S.
1.PROVIDE A MINIMUM TUBE DIAMETER OF 12 INCHES FOR SLOPES UP TO 50 FEET IN LENGTH WITH A SLOPE RATIO OF
3H:1V OR STEEPER. LONGER SLOPES OF 3H:1V MAY REQUIRE LARGER TUBE DIAMETER OR ADDITIONAL COURSING OF
FILTER TUBES TO CREATE A FILTER BERM. REFER TO MANUFACTURER'S RECOMMENDATIONS FOR SITUATIONS WITH
LONGER OR STEEPER SLOPES.
2.INSTALL TUBES ALONG CONTOURS AND PERPENDICULAR TO SHEET OR CONCENTRATED FLOW.
3.DO NOT INSTALL IN PERENNIAL, EPHEMERAL OR INTERMITTENT STREAMS.
4.CONFIGURE TUBES AROUND EXISTING SITE FEATURES TO MINIMIZE SITE DISTURBANCE AND MAXIMIZE CAPTURE AREA
OF STORMWATER RUN-OFF.
NOTES:
DWG:
DATE:
SCALE:
WHEELCHAIR RAMP 4
STA 20+30 LT
NOT TO SCALE
OCT 2008
WCR-03
SIDEWALK WIDTH
1.5%ROADWAY*
SECTION A-A
VARIES (9.0' MIN)
8" GRAVEL BORROW TYPE B
A
A 7.25
'LEFT S
IDETRANSITION
PLAN VIEW
RAMP CONTROL
ȭ OPENING
POINT
PLAIN
CEM CONC
GRANITE CURB
TRANSITION CURB (TYP)
GRANITE TRANSITION
WIDTH VARIES
CEM CONC
WALK
(PER MASSDOT CONSTRUCTION
DETECTABLE WARNING PANEL
STANDARD DETAIL E107.6.5R)
1.5%* MAX CROSS SLOPE
"LEVEL LANDING"LOAM & SEEDLOAM
&
S
E
E
D
SLOPE
*
1.5%7.5% MAX SLOPE*4" CEM CONC DETECTABLE
WARNING PANEL
GRANITE BLOCK PAVEMENT
H-STD.
S-STD.
SCALE: NOT TO SCALE
SEASHELL WALK
H-STD.
S-STD.
SCALE: NOT TO SCALE
PRECAST CONCRETE PAVERS
H-STD.
S-STD.
SCALE: NOT TO SCALE
BRICK WALK
H-STD.
S-STD.
SCALE: NOT TO SCALE
R&R EXISTING GRANITE
BLOCKS
4" STONE DUST
8" GRAVEL BORROW
3" CRUSHED
SEASHELLS
6" GRAVEL BORROW
PROPOSED PRECAST
CONCRETE PAVERS
1" SAND SETTING BED
8" GRAVEL BORROW
TYPE I GEOTEXTILE
FABRIC
R&R EXISTING BRICK
6" CEMENT CONCRETE
6" GRAVEL BORROW
MORTAR SETTING BED
TYPE VB - 6" REVEAL 606433-HD5 (DET).DWG24-Jan-2014606433-HD5 (DET).DWG24-Jan-2014FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----24 31
606433
CONSTRUCTION DETAILS
7.72
7.68
CONTROL POINT
ELEVATION
3
2
TRANSITION
LEFT RIGHT
ROADWAY
GUTTERWIDTHLOCATIONNO.
WHEELCHAIR RAMP DATA
-0.86%
-0.86%
NOTES:
1.
COMMENTS
ON ALL WHEEL CHAIR RAMPS - SEE MASSDOT E107.6.5R
DETECTABLE WARNING PANELS SHALL BE INSTALLED
5'-0"
5'-0"
7'-8"
6'-6"6'-9"11.89 RT
13+50.8
3" REVEAL LEFT
TRANSITION
4 7.32 -2.09%VARIES --11'-0"6.65 LT
20+31.2
TRANSITION
CEM CONC
5'
A
OBLIQUE VIEW
A
GRANITE CURB (TYP)
DWG:
DATE:
SCALE:
SIDEWALK WIDTH
4.0 ft
1.5%
LANDING
ROADWAY
7.5% MAX**
SECTION A-A
RIGHT SIDE
TRANSITION
LEFT SIDE
1.5% MAX CROSS SLOPE
"LEVEL LANDING"
REVEAL VARIES
RAMP CONTROL POINTGRANITE TRANSITION
CURB (TYP)
4" CEM CONC
**
*
5.00'
TRANSITION CURB (TYP)
GRANITE CURB (TYP)
DWG:
DATE:
SCALE:
1.5%* MAX CROSS SLOPE
"LEVEL LANDING"
RIGHT SI
D
E
TRANSITI
O
N
LEFT SID
E
TRANSITI
O
N
OBLIQUE VIEW
REVEAL VARIES5.5'RAMP CO
N
T
R
O
L
P
O
I
N
T
A
A
SIDEWALK WIDTH
1.5%ROADWAY*
SECTION A-A
PLAIN
5.5' MIN
*SLOPE*1.5%*
WHEELCHAIR RAMP 3
STA 13+50.8 RT
NOT TO SCALE
DEC 2011
WCR-01
WHEELCHAIR RAMP 2
STA 13+51.6 LT
NOT TO SCALE
OCT 2008
WCR-03
13.45 LT
13+51.6 3'-9"CEM CONCWALK
CEM CONC
WALK
CEM CONC
GRANITE TRANSITION
PLAIN CEM CONC
RAMP CONTROL POINT
ALONG FACE OF THIS CURVE
GUTTER SLOPE MEASURED
BUILDINGS, ETC.
GRASS OR
TRANSITION LENGTH
SIDEWALK
GRANITE CURB TYPE VB - 6" REVEAL
(PER MASSDOT CONSTRUCTION
DETECTABLE WARNING PANEL
STANDARD DETAIL E107.6.5R)5.0'AT GRADE BREAK IF LESS THAN 5'.
PLACE DETECTABLE WARNING PANEL
PLACE DETECTABLE WARNING PANEL
CORNERS 6" FROM GUTTER IF
GREATER THAN 5' AT ANY POINT.
DWG:
DATE:
SCALE:SIDEWALK WIDTHGRAN TRANSITION CURB
*
WHEELCHAIR RAMP 1
STA 12+43.5 LT
NOT TO SCALE
DEC 2011
WCR-04
8.541 -0.86%5'-0"7'-8"17.75 LT
12+43.5 --
(PER MASSDOT CONSTRUCTION
DETECTABLE WARNING PANEL
STANDARD DETAIL E107.6.5R)
(PER MASSDOT CONSTRUCTION
DETECTABLE WARNING PANEL
STANDARD DETAIL E107.6.5R)
8" GRAVEL BORROW TYPE B
4" CEM CONC
8" GRAVEL BORROW TYPE B
TRANSITION LENGTH
1.5%ROADWAY*
SECTION A-A
4" CEM CONC
8" GRAVEL BORROW TYPE B
A A
NOTE:
SEE MASSDOT CONSTRUCTION STANDARD DETAIL E107.2.1R
FOR ADDITIONAL INFORMATION.
NOTE:
SEE MASSDOT CONSTRUCTION STANDARD DETAIL E107.6.0R
FOR ADDITIONAL INFORMATION.
NOTE:
SEE MASSDOT CONSTRUCTION STANDARD DETAIL E107.3.0R
FOR ADDITIONAL INFORMATION.
5.775 -1.00%20'-0"----0.0 RT
30+06.8
6 5.52 -1.00%20'-0"----0.0 LT
36+86.3
WALKHMA WALKȭ OPENIN
G
ȭ OPENING
HOT MIX ASPHALT
DETECTABLE
WARNING PANEL
DETECTABLE
WARNING PANEL
DETECTABLE
WARNING PANEL
ȭ OPENING
7.5% MA
X
SLOPE
SLOPE
7.5% MAX
7.5% MAX SLOPE
7.5%*
SLOPE SLOPE7.5%7.5%
SLOP
E 606433-HD5 (DET).DWG24-Jan-2014606433-HD5 (DET).DWG24-Jan-2014FED. AID PROJ. NO.STATE
MASS.
SHEETS
TOTALSHEET
NO.
PROJECT FILE NO.
NANTUCKET
IN-TOWN MULTI-USE PATH
----25 31
606433
CONSTRUCTION DETAILS