Loading...
HomeMy WebLinkAbout2013-1-24 Minutes for January 24,2013,adopted Feb. 5 32°`a art, HISTORIC DISTRICT COMMISSION ��' 2 Fairgrounds Road �(\�c '`�1 Nantucket, Massachusetts 02554 \'°OAAItc. www.nantucket-ma.gov Commissioners:Linda Williams(Chair),Dawn Hill Holdgate(Vice-Chair),Kevin Kuester,John McLaughlin,David Barham Associate Commissioners: Diane Coombs,Jascin Leonardo Finger Staff: Mark Voigt,JamrmGrieo —MINUTES— Z January 24,2013-OLD BUSINESS —t --+, 4 Fairgrounds Road,Second Floor Meeting Room-1:00 pm g , m Called to order at 1:00 p.m. rn C) Staff in attendance: M.Voigt,HDC Administrator;T.Norton,Town Minutes Taker rn Attending Members: Williams, Hill-Holdgate, McLaughlin, Barham. Kuester, Leonardo-Finger o •-• < Absent Members: Coombs * 3 rn Late Arrivals: Williams 2:16 p.m. z Early Departures: Hill Holdgate 1:59 p.m.; McLaughlin 3:48 p.m. r N Agenda adopted by unanimous consent rn O I. PUBLIC COMMENTS-ANY MEMBER OF THE PUBLIC MAY ADDRESS COMMISSIONERS AT THIS TIME Nonc II.CONSENT 1. Vento,Jerry-59035 91 Low Beach Road-SAB Rev. COA 58783 75-31 F.Dail■ 2. Rosenberg, Kurt&Alex-59036 22 Bailey Road Shed 55-504 Self 3. Minella,Philip-59037 10 Gingy Lane Color change 41-844 W.Yost 4. Sullivan,Brian-59038 60 Cliff Road Color change 30-65 B.Wilson 5. Nielson, Carl-59039 18 Nichols/50 Wanoma Way Material change:reroof wood 92.4-190 V.Oliver 6. Myers,Alan&Patricia-59040 30 Kelley Road Shanty(shed) 54-297 Self 7. Shamrock RT-59041 39 W Miacomet Road Material change: reroof 81-147.1 Self 8. Gregory, Edward P-59042 60 Wanoma Way Rev. COA 57435 92-13 Thornewill,Dsgn 9. Torres, Richard R.-59043 5 Yompasham Lane Hardscaping 55-535 Dragon,Charles 10.Clarkson, Lorin-59044 17 %2 Miacomet Avenue Material change: roof 67-212 J.Libby 11.Johnson, Linda-59045 49 Goldfinch Drive Shed 68-552 J.Gonfrade 12.Gray Jr.,Parker-59046 47A Fairgrounds Road Shed 67-304 Permits Plus 13.Pollack, Harry& Sharon-59047 9 Washing Pond Road Rev. COA 58584C 40-92 Jardins Intl 14.Woolverton,Theresa-59048 11 Woodbury Lane-HSAB Outdoor shower 41-550 M.Ahern 15.Sachman, Steve&Alexia-59049 132 Surfside Road Material change: roof 80-252 Boukus 16.Thitat Maytawee,et al-59050 13C Maryann Drive Shed 68-985 J.Murray 17.Hills,Carolyn-59051 6A Pine Tree Road Porch 68-217(part) Self 18.Kampf, Mark-59052 3 Williams Street Rev. COA 58645 55-427.1 V.Oliver 19.Center St Acquisitions-59053 4 Chestnut Street Rev. COA 55269:color 42.3.1-68.1 Emeritus 20.Bowen,Michael-59054 16 Vestal Street Color change 42.3.3-92 S.Aloisi 21.Creech,Darcy-59055 29 Union Street-HSAB Material change:reroof 42.3.2-180 J.Lydon Sitting McLaughlin, Barham, Kuester, Hill-Holdgate(acting), Leonardo-Finger Alternates None Recused McLaughlin Item 10 Documentation File with associated plans,photos and required documentation Representing None Public None I. Concerns None Motion Motion to Approve Items 1-9(Barham)//Motion to Approve Items 10-21 (Barham) Vote Carried 5-0//Carried 4-0/McLaughlin recused Certificate# 59035 to 59055 HSAB-Historic Structures Advisory Board SAB-`Sconset Advisory Board ra-Tuckernuck Advisory Board MAB-Madaket Advisory Board Page 1 of 13 Minutes for January 24,2013,adopted Feb. 5 III.OLD BUSINESS 1. 21 Lincoln Ave.NT 21 Lincoln Avenue—HSAB Renovations:main house 30-40 Botticelli&Pohl Sitting Kuester, Hill-Holdgate,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Lisa Botticelli,Botticelli&Pohl—Reviewed changes per previous concerns. Ray Pohl, Botticelli&Pohl—present photos of existing at table. Public None Concerns (1:05) Leonardo-Finger—North elevation,new chimney is oddly placed. Rebuilt chimney should use existing brick. Double French doors and balcony treatment not appropriate. Would like to see"Whale"detail maintained in shutters. East elevation,would like to see"J"window to match existing dormer window. South Elevation,door does not fit with period of house but is better than 4-panel with sidelights. Kuester—Agrees.Not in favor of the balcony at all. Hill Holdgate—Agree.North elevation,2nd-floor door should be a 4-light so panes match windows. First-floor French doors are not appropriate."Whale"detail should remain in shutters. East elevation 4-light doors not appropriate. East elevation 2"G"windows should not be shuttered. Motion Motion to Hold for revisions.(Kuester) Vote Carried 3-0 Certificate# 2. 21 Lincoln Ave.NT 21 Lincoln Avenue—HSAB Move/demo shed 30-40 Botticelli&Pohl Sitting Kuester, Hill-Holdgate,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing None Public None Concerns None Motion Motion to Hold to track with main house.(Kuester) Vote Carried 3-0 Certificate# 3. 21 Lincoln Ave.NT 21 Lincoln Avenue—HSAB Move on-site,partial demo 30-40 Botticelli&Pohl Sitting Kuester, Hill-Holdgate,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing None Public None Concerns None Motion Motion to Hold to track with main house.(Kkuester) Vote Carried 3-0 Certificate# 4. Maury,Larry 10 Candlehouse Lane—HSAB Hardscaping: fences 55.4.4-51 V.Oliver Sitting McLaughlin, Barham,Kuester, Hill-Holdgate, Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Val Oliver—Present project. Picket fences are common in the area. Public None Concerns (1:19)HSAB comments read. Barham—Okay with Type II along Candlehouse Lane. 6-foot fence at rear is excessive and is a hybrid between a 5&1 and a 4&1. Lattice running vertical is more traditional. Kuester—Nothing to add. Leonardo-Finger—Not in favor of picket along Candlehouse Lane;most of that road is split rail or open. Motion Motion to Approve as submitted. (McLaughlin)Not carried Motion to Approve through staff with substitution of a 4&1 fence across rear not to exceed 5 feet,natural to weather and lattice oriented vertical/horizontal.(Barham) Vote Carried 4-1/Leonardo-Finger opposed Certificate# 590056 HSAB—Historic Structures Advisory Board SAB—`Sconset Advisory Board —Tuckernuck Advisory Board MAB—Madaket Advisory Board Page 2 of 13 Minutes for January 24,2013,adopted Feb. 5 5. Steamship Authority 1 Steamboat Wharf—HSAB Hardscaping: lighting changes 42.4.2-14 B.Cloutier Sitting McLaughlin, Barham, Kuester, Hill-Holdgate, Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Bill Cloutier,SSA—Change lighting fixtures to orient down light vertically. Public None Concerns (1:24)Kuester—Should be finished to match existing lighting. Barham—Think the"spider mount"would be more appropriate in grey to match the finish on the poles. McLaughlin—No concerns. Leonardo-Finger—Nothing to add. Motion Motion to Approve through staff at three locations shown on site plan with the single"spider mount"at top of 20-foot pole both finished in grey.(Barham)(Staff to collate the files) Vote Carried Unanimously Certificate# 59057 6. Steamship Authority 1 Steamboat Wharf—HSAB Hardscaping:replace fender 42.4.2-14 B.Cloutier Sitting McLaughlin, Barham, Kuester, Hill-Holdgate, Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Bill Cloutier,SSA—Rebuilding steel fender frame with black plastic material on head dolphins. Wood dolphins are damaging emergency doors on the ferries. Public None Concerns (1:32A) Kuester—Would favor a version that maintains the wood support structure. Leonardo-Finger—Don't think the rubber is appropriate,should remain wood. McLaughlin—No concerns. Hill Holdgate—Dolphins are industrial on an industrial water front.No concerns. Barham—Would like to see wood with a sacrificial rub rail. Would like to hold over for research into some alternative more esthetically in keeping for the Island's front door. Motion Motion to Hold for revisions. (Barham)not carried Motion to Approve.(Kuester) Vote Carried 3-2/Leonardo-Finger&Barham opposed Certificate# 59058 7. O'Reilly,Sara 9 N. Water Street—HSAB Add dormer,remove chimney 42.4.2-103 G. Wing Sitting McLaughlin,Barham, Kuester, Hill-Holdgate, Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing None Public None Concerns None Motion Motion to Hold for representation and historical documentation.(Kuester) Vote Carried Unanimously Certificate# 8. Gorasic,Joe 21 Warren Street—HSAB Replace roof 55.4.1-43 P.McGrady Sitting McLaughlin, Kuester,Hill-Holdgate, Leonardo-Finger Alternates None Recused Barhalm Documentation File with associated plans,photos and required documentation Representing Patricia McGrady Public None Concerns (1:41)Kuester—Not in favor of architectural in the Old Historic District(OHD)on an old house. Leonardo-Finger —Agree. Would like to know age of house. Hill Holdgate—No locus map and photo of only one side. Motion Motion to Approve through staff as three-tab.(Kuester) Vote Carried 4-0 Certificate# 59059 HSAB—Historic Structures Advisory Board SAB—`Sconset Advisory Board TAB—Tuckernuck Advisory Board MAB—Madaket Advisory Board Page 3 of 13 Minutes for January 24,2013,adopted Feb. 5 9. Upland Capital Corp. 21 Broad Street—HSAB Addition/demolition 42.4.2-76 Emeritus Sitting McLaughlin, Barham, Kuester, Hill-Holdgate, Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Matt MacEachern, Emeritus Development—Present project as differs from previous approval. Public None Concerns (1:45)HSAB comments read. Barham—Now demolishing both the back wing and the carriage house at the back. What was the age of the house?(answer: Carriage house was built in the 1950s/1960s;ell was added on in 1872 then structure was used as a rooming house.)Will have a lot of visibility from North Water Street and Ash Lane. Footprint and elevation are higher and greater than main structure as viewed form Ash Lane. Scale and mass are serious concerns.The long wall at the same height does not feel like additive massing and overwhelms the original structure. It should reflect vernacular of main structure. Kuester—Nothing to add. Leonardo-Finger—Agree. McLaughlin—Length of roof is 68 feet,exceeding the 50-foot guideline,and West elevation length is 128 feet. Agree with Barham. Hill Holdgate—Feel this kind of addition would have been a traditional treatment as to its becoming a hotel. Detail concerns include: ganged windows facing N Water Street and height,could be reduced a little so that it looks more additive. Motion Motion to Hold for revisions. (Kuester) Vote Carried Unanimously Certificate# Hill Holdgate depart 10. Kans Holdings LLC 10 Charles Street—HSAB New dwelling 29-91 CWA Sitting McLaughlin, Barham, Kuester(acting chair), Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Chip Webster,Chip Webster Associates—Present project. In flood plain so lifted. Public None Concerns (2:00)HSAB comments read. McLaughlin—Gable dormers not appropriate;dormers should be flush. Greek revival window heads are not appropriate. Casements should be double hung 2-over-2.Front door should be a standard 6 panel. Barham—Height 29.5 feet, is too tall for the neighborhood;plate heights could be reduced. Roof pitches are not called out. Does not have a single vernacular.Not in favor of 2"°-floor porch on front of structure;both porches are deep in relation to the house.2nd-floor"A"windows are too large. Double-ganged windows are not appropriate. Leonardo-Finger—Agree. Out of scale and too tall for the area. Kuester—Agree with what's been said.Needs more traditional additive massing. Motion Motion to Hold for revisions.(Leonardo-Finger) Vote Carried Unanimously Certificate# 11. Kans Holdings LLC 10 Charles Street—HSAB Move/demo existing 29-91 CWA Sitting McLaughlin, Barham, Kuester(acting chair), Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Chip Webster,Chip Webster Associates- Public None Concerns (2:10)HSAB comments read.Need historical information. McLaughlin—Would like it held for historical information. Barham—This existing structure speaks to the traditional character of the neighborhood.Need to fmd a way to allow people to add onto these small structures or construct new dwellings that speak to the character of the area and still meet flood plain requirements.This structure is simple and understated as opposed to the proposed new dwelling,which is busy. Motion Motion to Hold for historical information and neighborhood context photos.(Leonardo-Finger) Vote Carried Unanimously Certificate# HSAB—Historic Structures Advisory Board SAB—`Sconset Advisory Board CAB-Tuckernuck Advisory Board MAB—Madaket Advisory Board Page 4 of 13 Minutes for January 24,2013,adopted Feb. 5 Williams arrived 12. Hingham Savings 35 Main Street—HSAB Renovation 42.3.1-210 L.Gdurden Sitting McLaughlin, Williams,Barham,Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Robert Gaughen,President Hingham Institution for Savings—Present project and reviewed changes per HSAB comments. Vincent Sorentino,BRL Architectural Patrick Gaughen,Hingham Institution for Savings William Dunovan,Hingham Institution for Savings Public None Concerns (2:14)HSAB comments read. McLaughlin—There is nothing like the proposed raised panels along Main Street,it should remain flush.Prefer window Option C.Ganged dormer windows should be separated. Leonardo-Finger— With the windows,transoms,doors and signs,there are a lot of squares on the front of the building. Windows should have larger panes.Not in favor of the dormer;but if it is to be built,would prefer it have larger casings. Kuester— Agree with Leonardo-Finger. Color scheme is okay. Panels on either side of the sign are too much.Not in favor of the dormer.Barham—Opposed to the dormer. 33 &35 Main Street are clearly a pair and should share architectural expressions. 33 Main Street has columns and entablature;those have been lost on 35 Main Street. Would like to see that architrave reinstated along the top of the columns and capitals and columns reinstated either side of the door. Horizontal transoms as they exist are not appropriate.Architrave and columns can stand out but should be the same color.Williams—Agree with having it brought back to its original state.No concerns with the dormer. Motion Motion to Hold for revisions.(Kuester) Vote Carried Unanimously Certificate# 13. Hingham Savings 35 Main Street—HSAB New sign: projecting sign 42.3.1-210 L.Gdurden Sitting McLaughlin, Williams, Barham, Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Robert Gaughen,President Hingham Institution for Savings Vincent Sorentino,BRL Architectural Patrick Gaughen,Hingham Institution for Savings William Dunovan,Hingham Institution for Savings Public None Concerns None at this time. Motion Motion to Hold to track with renovations.(Kuester) Vote Carried Unanimously Certificate# 14. Hingham Savings 35 Main Street—HSAB New sign:wall sign 42.3.1-210 ???? Sitting McLaughlin,Williams,Barham, Kuester, Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Robert Gaughen,President Hingham Institution for Savings Vincent Sorentino,BRL Architectural Patrick Gaughen,Hingham Institution for Savings William Dunovan,Hingham Institution for Savings Public None Concerns McLaughlin—Panels on side of sign should go away. Barham-Panels right and left of the sign in the architrave should go away. Motion Motion to Hold to track with renovations.(Kuester) Vote Carried Unanimously Certificate# H ' —Historic Structures Advisory Board -`Sconset Advisory Board —Tuckernuck Advisory Board MAB—Madaket Advisory Board Page 5 of 13 Minutes for January 24,2013,adopted Feb.5 15. TON/NCS 7 Shadbush Road New building 78-4 NCS Sitting McLaughlin,Williams,Barham,Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Diana Brown Brad Fleming—Present project. John Schwanbeck Public None Concerns (2:43)McLaughlin&Leonardo-Finger—No comments. Kuester—Asked what is driving the height.(answer: large boats and indoor travel crane.)29 feet and 100 feet long is very large.Would like to see part of the structure stepped down. Barham—Okay with height,but eave height needs to drop;the roof pitch is too shallow.Okay with painted metal. Would like a more conventional window used.Williams—The pitch should be steeper. Motion Motion to Approve through staff with roof at 2 pitch and overhead doors painted to match sidewall.(Kuester) Vote Carried 4-1/Barham opposed Certificate# 59060 16. Trist,Theresa 117 Pleasant Street New roof walk 55-267.6 Self Sitting McLaughlin,Williams,Barham,Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Matt MacEachern,Emeritus Development—Present project. Public None Concerns (2:51)McLaughlin—Highly visible and nothing like this has ever been approved.Others who asked for it were denied.Not appropriate. Leonardo-Finger—Roof walk sits on top of two dormers.Not appropriate for the building. Kuester—Not architecturally appropriate:not on the main mass and has exterior stairs and not an appropriate neighborhood for either treatment.Barham—Agree with Kuester and straddle dormers with a post at the corner of a dormer,the platform is framed 6 inches up from ridge. Inappropriate.Williams—Okay with roof walk on this structure and there are others in the mid-island area.Construction needs to be more appropriate. Believe stairs are not visible. Motion Motion to Hold for revisions.(Barham) Vote Carried Unanimously Certificate# 17. Sorenson,Soren 21 Woodbine Street Hardscaping:pool and fence 80-321 Emeritus Sitting McLaughlin,Williams,Barham,Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Matt MacEachern,Emeritus Development—Present project.Was previously approved. Public None Concerns (2:57)Staff—If this had been properly coordinated,we would have been able to determine if substantial changes have taken place or if it was a simple renewal. Motion Motion to Hold for previous application.(Kuester) Vote Carried Unanimously Certificate# 18. Sorenson,Soren 21 Woodbine Street Hardscaping:tennis court 80-321 Emeritus Sitting McLaughlin,Williams,Barham,Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Matt MacEachern,Emeritus Development —Present project.Was previously approved. Public None Concerns Same as for pool and fence. Motion Motion to Hold for previous application.(Kuester) Vote Carried Unanimously Certificate# Break 3:02 to 3:12 p.m. —Historic Structures Advisory Board El—`Sconset Advisory Board —Tuckernuck Advisory Board MAB—Madaket Advisory Board Page 6 of 13 Minutes for January 24,2013,adopted Feb. 5 Discussion about applications being held to other meetings due to lack of quorum or at request of applicant. 19. Norris,Mark 51 Vestal Street(Lot 3A) New dwelling 41-185.4 Emeritus Sitting McLaughlin,Williams,Barham,Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Matt MacEachern,Emeritus Development—present project. Mark Norris Public None Concerns (3:02)McLaughlin—Shingle it and remove the cupola. West elevation dormer not appropriate if visible. Discussion about positioning of house in relation to abutters and visibility.Leonardo-Finger—West elevation dormer should be broken into two.Awnings should be hopper windows and open inward,which would be more in keeping with design. Kuester—Would like it pushed farther away from the door. Don't like the cars parked in the front.4 French doors,dormers and pool will be visible.Cupola isn't believable in this neighborhood. Barham—Would like to see a topographical;agree it should move farther back from the road. South elevation left side,double dormer with the"B" units up-stage the statement being made by the board-and-batten unit;okay with rear dormer;if the front is a head- room issue,a gambrel roof for that mass might work better;"B"windows on first floor should be"C"type windows to look more barn like.Okay with the dormer over dining room but horizontal window panes should be more traditional and could be higher on the roof. West elevation jogs are 8 or 9 inches and should be more distinct;they will be visible due to forward position.Cupola should be centered.Williams—Okay with parking in front,but should cut back the scale.Agree with Barham about West elevation massing.Little cross gables don't work along the additive massing;should try another treatment.Can only approve the cupola if the board and batten stays. South elevation dormers,the"B"window on the right should be a"C".Don't like the cross gable on the front.On the transom windows,change to three panes for more vertical orientation. Broken back on the left might work. Moving it toward the back will expose more foundation. Motion Motion to Hold for revisions and topographical information.(Kuester) Vote Carried Unanimously Certificate# 20. Desert Island LLC 13 Derrymore Road New dwelling 41-125 Thornewill Dsgn Sitting McLaughlin,Williams,Barham,Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Carrie Thomewill,Thornewill Design—Present project. Public None Concerns (3:39)McLaughlin—South elevation,should have gable dormers.Cellar stairwell is not shown on the plans. Leonardo-Finger—South elevation front door sidelights should be 3 panes instead of 2.Kuester—too large for neighborhood and main mass and front entrance don't read well. Should have a chimney. Believe the West elevation will be visible,double French should be a single. Prefer wood shingles or 3-tab;if it is to be architectural,should be dual black. Barham—The building seems to sprawl,asked distance from Delaney Road in relation to its neighbor. (answer: neighbor is 26 to 28 feet from Delaney.)In terms of ground cover,there is no yard and so feels out of balance.Air-conditioning units(A/C)face Derrymore Rd.Ceiling height in main mass exceeds 8 feet.From the South elevation,the three parts of the house don't go together;windows in main mass are too small and windows in wings are too large thus dominating the main mass. Large wall face on center section makes the mass feel very large. The 2-over-2 window style does not match design.Williams—French door should not face Delaney.Agree about windows on South elevation. South elevation right wing is 24 feet and main mass is 30;right wing is too long. South elevation length is 72 feet;structure needs to be shortened.Agree about the South elevation perceived height. Slider West elevation inappropriate. Motion Motion to Hold for revisions.(Kuester) Vote Carried Unanimously Certificate# —Historic Structures Advisory Board InE—`Sconset Advisory Board —Tuckemuck Advisory Board MAB—Madaket Advisory Board Page 7 of 13 Minutes for January 24,2013,adopted Feb.5 McLaughlin depart. 21. Glenherst West RT 137 Cliff Road New dwelling 30.8-259 Permits Plus Sitting Williams,Barham,Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Mark Poor,Permits Plus—Present project in general. Public None Concerns (3:48)Barham—Would like to see it dropped 18 to 24 inches;from the water side it is on a platform,over fenestrated,N elevation wings windows in the hyphens need to be narrower and similar with flankers,exceeds guidelines for percentage of glazing allowed on a wall. Roof line will be important and the large chimneys will be handsome;dormers on flankers are too high and too wide;long shed dormers linked by ribbons of windows is a need to be broken and separated by shingling. However,the roof walk access is through a door into a faux chimney,which is not approvable;need to come up with another access. Kuester—Agree,except for chimneys. Some window forms are atypical to Nantucket. Leonardo-Finger—Agree about over fenestration and agree with Kuester about the chimneys and window shapes.Williams—The top of the structure will be visible from Tupancy and the water. The two large gambrels side by side will look massive.There are hipped roofs and gables and gambrels mixed together. There are two 80-foot unbroken ridge lines and they are not approvable;50-feet is the maximum allowed.Dormers connected to hip dormers are not approvable. 18-foot tall window is not approvable.This design is a 100%departure from the guidelines.Tupancy and the water count toward visibility from publicly traveled ways. Motion Motion to Hold for revisions.(Kuester) Vote Carried Unanimously Certificate# 22. Lampe,John John Adams Lane(Lot 1) New dwelling 30-170.1 Self Sitting Williams,Barham,Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing John Lampe—Present project. Public None Concerns (4:13)Kuester—In this rural area,grey softens the house.Few issues with the house itself,but do have concerns about the placement.East elevation right window is a concern,but might not be visible.Leonardo-Finger—Roof walk needs to work with the chimney better;historically if you don't have a chimney,you don't have a roof walk. Agree about the sighting and concerned about visibility of the pool.East elevation should be single sidelights. Barham—Chimney doesn't meet code.Only two windows line up vertically;the windows should align vertically. East elevation the dormers and portico are overwhelmingly large for the wall into which they are mounted;main mass needs to be wider.Portico roof pitch is too steep.Rear shed is off-center to mass and might be visible.Too many dormers for white trim. South elevation should be more formal.Williams—If the house is oriented east and west,the pool can go behind it.Front door should face Cliff Road. Dormers are all ganged;only the main mass facing the road should be gable dormers.Trim is too heavy for a rural area.Not in favor of gable over front door and too many lights related to the door.Fenestration is chaotic;need to simplify window types. Main mass disappears on the West elevation.North elevation,Octagon window might be visible for John Adams Lane but doesn't work with a simple gable structure.Most of the eaves are at the same height. Motion Motion to Hold for revisions.(Barham) Vote Carried Unanimously Certificate# 23. Lampe,John John Adams Lane(Lot 1) New garage/apartment 30-170.1 Self Sitting Williams,Barham,Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing John Lampe Public None Concerns None at this time. Motion Motion to Hold to track with main house.(Barham) Vote Carried Unanimously Certificate# yea —Historic Structures Advisory Board BE-`Sconset Advisory Board —Tuckernuck Advisory Board MAB—Madaket Advisory Board Page 8 of 13 Minutes for January 24,2013,adopted Feb. 5 24. Lampe,John John Adams Lane(Lot 1) New pool 30-170.1 Lampe,John Sitting Williams, Barham,Kuester, Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing John Lampe Public None Concerns None at this time. Motion Motion to Hold to track with main house.(Barham) Vote Carried Unanimously Certificate# 25. Robinson 9 N Beach Street Move/demo 42.4.1-91 Permits Plus Sitting Williams, Barham,Kuester, Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Mark Poor,Permits Plus—Present project. Public None Concerns (4:31)No concerns except leaving lot in unfinished state. Motion Motion to Approve.(Kuester) Vote Carried 3-0/Barham abstain Certificate# 59061 26. Barrett,Bernard 40 King Street—SAB Addition: Studio 73.4.2-118 McMullen Sitting Williams, Barham, Kuester, Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Nathan McMullen—Present project. Public None Concerns (4:34)SAB comments read. Barham—Facing the road,the new wing steps in 6 inches. Would like to see a 1-foot break on the front and more of a difference in the roof slopes. Motion Motion to Approve. (Leonardo-Finger)not carried Motion to Hold for revisions.(Leonardo-Finger) Vote Carried Unanimously Certificate# 27. Barrett,Bernard 40 King Street—SAB Addition:House 73.4.2-118 McMullen Sitting Williams, Barham, Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Nathan McMullen—Present project. Present owner says it was built in 1971. Public None Concerns (4:38)Staff—House dated to 1938. Leonardo-Finger—Like the way the front facade as it is now.This is a Sears kit-house so predates 1971. Kuester—Agree. Barham—At the second-story level it comes too far forward and should be pulled back to help the original front stand out.The 3-type window is too big and panes are too large. Williams—Believe the design is appropriate,but the windows are a little off. Motion Motion to Hold for revisions.(Kuester) Vote Carried Unanimously Certificate# HSAB—Historic Structures Advisory Board SAB,—`Sconset Advisory Board Tuckernuck Advisory Board MAB—Madaket Advisory Board Page 9 of 13 Minutes for January 24,2013,adopted Feb. 5 28. Jelleme,Carl 3 Pilgrim Court New dwelling 41-612 Emeritus Sitting Williams, Barham, Kuester Alternates None Recused Leonardo-Finger Documentation File with associated plans,photos and required documentation Representing Matt MacEachern, Emeritus Development—Present project. Public None Concerns (4:44)Barham—Would like to see this with the garage drawings. West elevation will be visible. Would also like context of what is going on next door. Williams—Roofline and massing need to be simplified; South elevation massive dormer and"tongue"are not approvable;too many ganged windows;nothing aligns;North elevation 2"d- floor dormer is too large. Motion Motion to Hold for revisions,further information and the garage application.(Barham) Vote Carried Unanimously Certificate# 29. 5 Quaise LLC 5 Quaise Pastures Road New dwelling 26-21 Botticelli&Pohl Sitting McLaughlin,Williams,Barham, Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Lisa Botticelli Public None Concerns (3:13)None at this time. Motion Motion to Hold for next old-business meeting at applicant's request.(Kuester) Vote Carried Unanimously Certificate# 30. 5 Quaise LLC 5 Quaise Pastures Road New garage 26-21 Botticelli&Pohl Sitting McLaughlin,Williams,Barham, Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Lisa Botticelli Public None Concerns (3:13)None at this time. Motion Motion to Hold for next old-business meeting at applicant's request.(Kuester) Vote Carried Unanimously Certificate# 31. Coffin St LLC 30 Coffin Street(Lot 3)—SAB New dwelling 73.4.1-24 Botticelli&Pohl Sitting McLaughlin, Williams, Barham, Kuester, Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Lisa Botticelli Public None Concerns (3:13)None at this time. Motion Motion to Hold for next old-business meeting at applicant's request.(Kuester) Vote Carried Unanimously Certificate# 32. Sconset House Rt 6 Center Street—SAB Dormers 73.1.3-31 Botticelli&Pohl Sitting McLaughlin,Williams, Barham, Kuester, Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Lisa Botticelli Public None Concerns (3:13)None at this time. Motion Motion to Hold for next old-business meeting at applicant's request.(Kuester) Vote Carried Unanimously Certificate# HSAB—Historic Structures Advisory Board SAB_ —`Sconset Advisory Board T BB_ —Tuckernuck Advisory Board MAB—Madaket Advisory Board Page 10 of 13 Minutes for January 24,2013,adopted Feb. 5 33. Hedgebury 8 LLC 8 Hedgebury Lane New dwelling 41-596 Workshop/APD Sitting Williams,Barham,Kuester, Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing James Krapp, Workshop/APD—Present project. Public None Concerns (4:49) Barham—The height poles seem too close to Madaket Road;the height would be okay,but not that close to the bike path. The premise was that the pool houses would look light small cottages fronting on Madaket Road;but this pressed hard up on the road makes the statement of being the rear of the property. Gable to the road feels too tall. Chimneys are drawn in different locations on different elevations. Kuester—Agree with Barham about the pool house.The main house is too close to Hedgebury; it is farther forward than the neighbors and seems to be taller. There are no roof walks in this area and don't want to see it get started,most certainly not a skirted roof walk. Leonardo-Finger—Agree with what's been said. Williams—This is too large.The eaves are too high all the way around;the eave height is hidden behind a porch and two vertical gables. Six-foot wings are not appropriate additive massing;two gables forward are inappropriate;too vertical;ganged windows facing Hedgebury are inappropriate; white trim is not appropriate for as it is designed. This is a transition dormer between Town and rural so structures should feel low. Motion Motion to Hold for revisions.(Kuester) Vote Carried Unanimously Certificate# 34. Hedgebury 8 LLC 8 Hedgebury Lane Second dwelling 41-596 Workshop/APD Sitting Williams, Barham, Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing James Krapp, Workshop/APD- Public None Concerns (4:59)See main house. Motion Motion to Hold to track with main dwelling. (Kuester) Vote Carried Unanimously Certificate# 35. Hedgebury 8 LLC 8 Hedgebury Lane Shed 41-596 Workshop/APD Sitting Williams,Barham,Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing James Krapp,Workshop/APD- Public None Concerns (4:59)See main house. Motion Motion to Hold to track with main dwelling.(Kuester) Vote Carried Unanimously Certificate# 36. Poole,Jim 43 Main Street—SAB Revisions 73-8 V. Oliver Sitting McLaughlin, Williams, Barham, Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Val Oliver Public None Concerns (3:13)None at this time. Motion Motion to Hold for next old-business meeting at applicant's request.(Kuester) Vote Carried Unanimously Certificate# HSAB—Historic Structures Advisory Board SIB—`Sconset Advisory Board —Tuckernuck Advisory Board MAB—Madaket Advisory Board Page 11 of 13 Minutes for January 24,2013,adopted Feb. 5 37. Carruthers 38 Burnell Street—SAB Revisions 73-123 B.Meerbergen Sitting McLaughlin, Williams,Barham,Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Brook Meerbergen Public None Concerns (3:13)None at this time. Motion Motion to Hold for next old-business meeting at applicant's request.(Kuester) Vote Carried Unanimously Certificate# 38. China Lake R.T. 1 Blackfish Lane—SAB Revisions 73-104 B.Meerbergen Sitting McLaughlin, Williams,Barham, Kuester, Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Brook Meerbergen Public None Concerns (3:13)None at this time. Motion Motion to Hold for next old-business meeting at applicant's request.(Kuester) Vote Carried Unanimously Certificate# 39. China Lake R.T. 1 Blackfish Lane—SAB Garage to track with dwelling 73-104 B.Meerbergen Sitting McLaughlin, Williams, Barham,Kuester, Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Brook Meerbergen Public None Concerns (3:13)None at this time. Motion Motion to Hold for next old-business meeting at applicant's request.(Kuester) Vote Carried Unanimously Certificate# 40. Bryan, Deborah 82 Millbrook Road Revisions: dwelling 79-212 BPC Sitting McLaughlin,Williams,Barham,Kuester,Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing None Public None Concerns (3:13)None at this time. Motion Motion to Hold to beginning of Jan.29 Meeting due to lack of quorum.(Kuester) Vote Carried Unanimously Certificate# 41. Upland Capital 20 Straight Wharf—HSAB Alteration 42.3.1-86 Emeritus Sitting McLaughlin, Williams, Barham, Kuester, Leonardo-Finger Alternates None Recused None Documentation File with associated plans,photos and required documentation Representing Matt MacEachern, Emeritus Development Public None Concerns (3:13)None at this time. Motion Motion to Hold to beginning of Jan.29 Meeting due to lack of quorum.(Kuester) Vote Carried Unanimously Certificate# HSAB—Historic Structures Advisory Board SAB `Sconset Advisory Board TAB—Tuckernuck Advisory Board MAB—Madaket Advisory Board Page 12 of 13 Minutes for January 24,2013,adopted Feb. 5 Following items held for Jan. 29 meeting. 42. Shay, Lowell 23 Clarendon Road Addition 76.1.3-112 S. Payne 43. Manisky 74 West Chester Street Revisions 41-475 NAG 44. Tofalli 122 Main Street Addition: house 42.3.3-100 McMullen 45. Lipp 2 Sesachacha Road Addition 21-88 BPC 46. Lipp 2 Sesachacha Road Partial demo 21-88 BPC 47. Lipp 2 Sesachacha Road Garage 21-88 BPC 48. 36 Burnell LLC 15 Blackfish Lane Revisions:new dwelling 73-108 Workshop/APD 49. Dolins,Mark 15 Stone Post Way Revisions: house 73.3.2-73 Workshop/APD 50. Dolins,Mark 15 Stone Post Way Revisions:garage 73.3.2-73 Workshop/APD 5 I. 39 Hulbert LLC 39 Hulbert Avenue Rev. COA 58797 19-19 Botticelli&Pohl 52. Sunset Hill LLC 15 Hallowell Lane Renovation 30-10 Botticelli&Pohl 53. Frankel,Frank 5 Beaver Street—HSAB Fenestration change 55.4.1-98 Emeritus IN'. IIDC Ill SINI:SS Review Minutes Jan 15,2013 Approve Minutes Sep 4,2012&Jan 8,2013—Held 60 Day Deadlines Panner, 11 Crooked Ln, new dwelling—Motion to Extend (Barham)Carried 3-0 Panner, 11 Crooked Ln, new garage—Motion to Extend(Barham)Carried 3-0 Other Business Organizational Meeting: Thursday,January 31,2013 at 5:00pm,4 Fairgrounds Rd,2"d-Floor Conference Room. Please submit agenda items by January 22. Commission Comments None Motion to Adjourn: 5:14 p.m. Submitted by: Terry L.Norton HSAB—Historic Structures Advisory Board SAB—`Sconset Advisory Board —Tuckernuck Advisory Board MAB—Madaket Advisory Board Page 13 of 13 ,y� — ? CERTIFICATE NO: i O I.1 DATE ISSUED: /l a 4 f 1J Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It Is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970,for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ from the approved application.Violation may impede issuance of Certificate of FOR OFFICE USE ONLY Of:CUpancy. PROPERTY DESCRIPTION Date application received: 1,1(-0 13 Fee Paid:$as.— TAX MAP N°; 7S PARCEL N°. p 3 I Must be acted on by: /at la..l 1 Street&Number of Proposed Work: q/ Li w OeetGy Pee . Extended to*, Owner of record: . eC1 11en I Approved ✓✓✓ Disapproved: i Mailing Address: R I Z-O.LI d�rC-h Roca Chairman ���^[D G.LS^`7 Nw1d, Jk l fr1A- CI/35Y Member: _ Contact Phone#:S6/-dial-SW'7 E-mail: Member: AGENT INFORMATION(if applicable) Member: - __ Member: Name: u // Notes-Comments-Restrictions-Conditions Mailing Address: / g 0 K �rOgd /1.1401.410. /4.4 Contact Phone#:SO$-610-./0 9 Y E-mail:f', CQdw,3 ,Id" _____ ____________ DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. ❑New Dwelling Addition ❑Garage ❑Driveway/Apron ❑Commercial ❑Historical Renovation ❑Deck/Patio ❑Steps ❑Shed ❑Color Change ❑Fence ❑Gate ❑Hardscaping ❑Move Building ❑Demolition (Revisions to previous Cert.No.1111111111 Pool(Zoning District- ) ❑Roof ❑ Other Size of Structure or Addition: Length: rea.as Sq.Footage 1st floor: Go. P7 Decks/Patio: Size: ❑1st floor ❑2nd floor Width: ii.9.), Sq.footage 2nd floor: Size: ❑1st floor ❑2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade: North NO A=s - bowl') Last West Height of ridge above final finish grade: North ADO A'S -.. . _ - Additional Remarks REVISIONS' 1.East Elevation Historic Name: Original Date: (describe) 2.South Elevation 3.West Elevation X Original Builder: /� I,� hew w nc S..6o )7 4.North Elevation LSu np out- gold;-7of1 add / Is there an HDC survey form for this building attached? ❑Yes ❑N/A re 'e. ci1il9 dJ 44c/ i.,i 4C ' -Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed li : . ❑Block Parged ❑Brick(type) ❑Poured Concrete Li Piers Masonry Chimney: ❑Block Parged ❑Brick( _ ❑Other Roof Pitch: Main Mass /12 Secondary Mass Dormer /12 Other Roofing material 0 Asphalt: ❑3-Tab 0 Architectural Fence: Height: _ ❑Wood (Type: Red Cedar,White Cedar,Shakes,etc.) Type: _ _._ Length: Skylights(flat only): Manufacturer R3tfg Opening _ Size Location Manufacturer Rodgh Open Size Location__ Gutters: ❑Wood U Aluminum ❑Copper ❑Leaders(material) _. Leaders(material and size): _- Sidewal l:!$White cedar shingles - ❑Clapboard(exposure: inches) Front❑ Side fl ❑Other Trim:A.Wood ❑Pine ❑Redwood ,O Cedar ❑Other B.Treatment M Paint ❑Natural to weather ❑Other C.Dimensions: Fascia I' Rake Soffit(Overhang) — Corner boards w p Frieze 6/1 Window Casing y It Door Frame y rr Columns/Posts:Round=Square Windows':X Double Hung ❑Casement ❑All Wood ®Other Reuse E.654+4, on Nolen sr',k_ ❑True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer /yQltir%1 Doors'(type and material): ❑TOL JB[SDL Front ('e USe. a l.S'71 Rear Side Garage Door(s): Type Material Hardscape materials: Driveways - _ Walkways Walls •Note: Complete door and window schedules are required. COLORS f Sidewall NT1.1/ _ Clapboard(if applicable) /VIA Roof N/A Trim ►,,,A„ie Sash_ 1,1)0!t, ,1 _ Doors IiAS� t, Deck _ N/A Foundation �_v//7 Fence Nl� _-_ Shutters /vh 'Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the pldns contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and compl.•'- _rms and conditions of this application.I hereby agree that the submission of any revisions So this/application will initiate a new sixty-day review period. Date 01 to I 1_AJ3 _ Signature of owner of record_ __ _. -I . ____-_. Signed under penalties of perjury CERTIFICATE NO: L t,3(p DATE ISSUED:____)'i}-q P:04.3 Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly ggrecoPlease see othertsidapplicant or submittal familiar requiirementsFIncomplete l applications will note be reviewed by the HDC.submittal of application.and Resolves vescofnMass a11970,for proposed uworkaasldscribed herein and plans, gs made for issuance of a Certificate of and photographs accompanying this arpplicat on and made a part rhereoffby reference. The certificate is valid for three years from date of issuance.No structure may differ F fl OFFICE USE ONLY from the approved application.Violation may impede issuance of Certificate of Occupancy. PROPERTY DESCRIPTION Date application received: Ile ` Fee Paid:$ TAX MAP N°: SC PARCEL N°. 5O q Must be acted on by: 3 I a- >o t.3 Street&Number of Proposed Work: 22- gaA-4-.3 P--_ Extended to: t."4-03 Approved: Disapproved: Owner of record: per` �DS�" (XL�-{fin Chairman: "I/f A f Mailing Address: 27- �+,�"� �' Ni) *v J c�4r /r 07-SS-4 Member:-- - k' eitt 4. Member:__ --- — Contact Phone#:rJ c�6^6fSb^`tlsa E-mail: �� Member:___ AGENT INFORMATION(if applicable) Member: -- • f Name: -� -- Notes-Comments-Restrictions-Conditions Mailing Address: 2:7-- ...- - tJ c u.c..k0C i b`A.OX OzSS - Contact Phone#: ' OTS-CoYD-t*t50 E-mail:L ._@.„`r...:,1.C6't DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. U New Dwelling ❑Addition ❑Garage ❑Driveway/Apron ❑Commercial ❑Historical Renovation ❑Deck/Patio ❑Steps ®Shed ❑Color Change ❑Fence ❑Gate ❑Hardscaping ❑Move Building ❑Demolition ❑Revisions to previous Cert.No. ❑Pool(Zoning District ) . ❑Roof ❑Other Size of Structure or Addition: Length: t2' Sq.Footage 1st floor: t -O' Decks/Patio: Size: ❑1st floor ❑2nd floor Width: 10/ Sq.footage 2nd floor: Size: ❑1st floor ❑2nd floor Sq.footage 3rd floor: _ Difference between existing grade and proposed finish grade: North South- East West Height of ridge above final finish grade: North South East_ West pgditional Remarks REVISIONS' 1.East Elevation Historic Name: 2.South Elevation (describe) Original Date: 3.West Elevation Original Builder: 4.North Elevation Is there an HDC survey form for this building attached? _Yes -N/A 'Cloud on drawings and submit photographs of existing elevations. rr DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed {p-_ S Block Ll Block Parged ❑Brick(type) L:Poured Concrete ❑Piers Masonry Chimney: ❑Block'Parged LI Brick(type) _ - ❑Other __--_ Roof Pitch: Main Mass____T-/12._ -Secondary Mass _ -/12__._ Dormer /12 Other __- Roofing material:'Asphalt: ❑3-Tab LArchitectural Fence: Height: i Wood (Type: ; r,White Cedar,Shakes,etc.) Type: Length: Skylights(flat only): Manufacturer_ - ____Rough Opening _. Size Location Manufacturer ._. ___Rough Opening - Size Location Gutters: ❑Wood ❑Aluminum ❑Copper ❑Leaders(material)__-- - -- Leaders(material and size) -- - -- — Sidewall:2 White cedar shingles _ - ❑Clapboard(exposure: —inches) Front❑ Side❑ ❑Other - - Trim:A.Wood V)Pine ❑Redwood ❑Cedar ❑Other -- - B.Treatment Li Paint ®Natural to weather ❑Other - - - - C.Dimensions: Fascia Rake Soffit(Overhang) Corner boards _ .. Frieze Window Casing 2' &M' Door Frame 3r1((e.g' Columns/Posts:Round Square Windows': ❑Double Hung 0 Casement ❑All Wood '0 Other Art ■ ❑True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer _ __- Doors'(type and material): VTOL ❑SDL Front iftrJ.-- Rear Side— Garage Door(s): Type Material- ---- Hardscape materials: Driveways . _ Walkways Walls - 'Note: Complete door and window schedules are required. COLORS Sidewall Clapboard(if applicable)__-_ - Roof - - - Trim - Sash Doors Deck _ __ Foundation__- Fence _ Shutters - - "Attach manufacturer's color samples if color is not from HOC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and comply ith the and conditions of this application.I hereby agree that the submission of any revisions to this application will initiate a new sixty-day review period. (/n Date I I c( /Cs _ - Signature of owner of record _ - Signed under penalties of perjury r h� CERTIFICATE NO: _ P V 3 7 DATE ISSUED:_ l I 3 Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly oPleasneseee that the other side for submittal requirements.Incomplete guidelines, p etle pplicat ons will not be reviewed by ther'HDC.submittal of application. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970,for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ from the approved application.Violation may impede issuance of Certificate of "v \J Occupancy. PROPERTY DESCRIPTION Date application received.� s7- Fee Paai TAX MAP N°: 41 PARCEL N°. a44-/ Must be acted on by: Street&Number of P/q/poed Work:/J/0 f�/Al 6 y L" Extended to: // Owner of record: !hr//rP /"line l0. Approved: i_ Disapproved: Mailing Address: h o. /343 Chairman: ■ — Nan✓uo1(Pf, MA Member. Contact Phone;r: X8-332`8//S E-mail:/38r ngy®aol•c eM Member: Member: AGENT INFORMATION(If applicable) Member: Name: 1e� I Mailing Address: e .r-,2R R ynro R D Notes-Comments-Restrictions-Conditions /VA Airr4cteEr, /"/.4 ir z S-y Contact Phone#: 7#3-6 3S-'/71 9 E-mail:ay JGh 2do1,0 aol.co.w DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. ❑New Dwelling ❑Addition ❑Garage ❑Driveway/Apron ❑Commercial O Historical Renovation ❑Deck/Patio ❑Steps ❑Shed NI Color Change ❑Fence ❑Gate ❑Hardscaping ❑Move Building ❑Demolition al Revisions to previous Cert.No. 57 362 7 ❑Pool(Zoning District ) ❑Roof Other _ Size of Structure or Addition: Length: Sq.Footage 1st floor: Decks/Patio: Size: __1 1st floor ❑2nd floor Width: Sq.footage 2nd floor: Size:_ _El 1st floor ❑2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade: North South East West Height of ridge above final finish grade: North _ South East_ __ West Additional Remarks REVISIONS' 1.East Elevation Historic Name: 2.South Elevation Original Date: (describe) 3.West Elevation Original Builder- 4.North Elevation Is there an HDC survey form for this building attached? ❑Yes ❑N/A 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed ❑Block El Block Parged ❑Brick(type) __- -- C3 Poured Concrete C Piers Masonry Chimney: ❑Block Purged ❑Brick(type) U Other - Roof Pitch: Main Mass /12 Secondary Mass /12 Dormer_J12 Other Roofing material: 0 Asphalt: 0 3-Tab ❑Architectural Fence: Height: ❑Wood (Type: Red Cedar,White Cedar,Shakes,etc.) Type: Length: Skylights(flat only): Manufacturer x Rough Opening Size Locaton Manufacturer Rough Opening _ Size Location Gutters: U Wood ❑Aluminum ❑Copper 0 Leaders(material) - Leaders(material and size): -- Sidewall:❑White cedar shingles ❑Clapboard(exposure: inches) Front 0 Side 0 ❑Other Trim:A.Wood ❑Pine ❑Redwood ❑Cedar ❑Other B.Treatment ❑Paint O Natural to weather ❑Other C.Dimensions: Fascia Rake Soffit(Overhang) Corner boards Frieze Window Casing . Door Frame Columns/Posts:Round Square Windows': ❑Double Hung O Casement ❑All Wood ❑Other ❑True Divided Lights(muntins),single pane 0 SDL's(Simulated Divided Lights) Manufacturer Doors'(type and material): ❑TDL ❑SDI Front Rear Side Garage Door(s): Type Material Hardscape materials: Driveways Walkways Walls •Note: Complete door and window schedules are required. COLORS Sidewall Clapboard(if applicable) Roof Trim - Sash__ _ _ Doors gpnL )[e,+ GrrABa it%.b Deck _ Foundation Fence . _ _ Shutters—.-.. . •Attach manufacturer's color samples if color is not Irom HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and co e • i th- erm conditions of this application.I hereby agree that the submission of any revisions to this application will initiate a new sixty-day review period. / Date //eV'/i_3 Signature of owner of record �- -- --- `z�"'`�''i ------- - - - Signed under penalties of perjury CERTIFICATE NO: 9.O DATE ISSUED: /7?"/ 4)7.2/.,...). Application to the Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended applicant familiar . Building with Nantucket prior submittal of application.lea> other side submittal applications not be reviewed by thHDC This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970,for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ FOR OFFICE USE ONLY from the approved application.Violation may impede issuance of Certificate of Occupancy. PROPERTY DESCRIPTION Date application received: i l I t 3 Fee Paid:$ ?f•OP TAX MAP N°: O PARCEL N°. bS Must be acted on by: 311)-113 Street&Number of Proposed Work: �L�+ n e��•(.f �c Extended to: / Owner of record( Y'0," "t ` A----•\...1\ ��∎�Ot\--- Approved: `/ Disapproved: `♦ Chairman: Cal-CV, Mailing Address: a\-1-`�`)-\��,jC�f`�rc! S�. n °� WC \\• , C+\g136-4' Member: Member: Contact Phone#: E-mail: AGENT INFORMATION(if applicable) Member: t Member: Name: s w.a�e. ). �__ — .,y10 �4• Notes-Comments-Restrictions-Conditions Mailing Address: ''.O• ,.1s3\..S Contact Phone#:Z2-(a) "a&a4 0E-mail:1:SN 1 ct DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. ❑New Dwelling 0 Addition ❑Garage ❑Driveway/Apron LI Commercial ❑Historical Renovation ❑Deck/Patio ❑Steps ❑Shed Color Change ❑Fence ❑Gate ❑Hardscaping ❑Move Building ❑Demolition ❑Revisions to previous Cert.No. ❑Pool(Zoning District ) ❑Roof ❑ Other Size of Structure or Addition: Length: Sq.Footage 1st floor: Decks/Patio: Size: ❑1st floor ❑2nd floor Width: Sq.footage 2nd floor: Size: ❑1st floor ❑2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade: North South East West Height of ridge above final finish grade: North South - East West Additional Remarks 'tc•- sc-c ? v-� tea\ REVISIONS' 1.East Elevation " - Historic Name: \ ' - _ ,^- S� ll Original Date: . \ (describe) 2.South Elevation t`f"r t� ��2C� �) 3.West Elevation ∎.,,Q-`p� �,o Cs2212,/ Original Builder: 4.North Elevation -nwto Is there an HDC survey form for this building attached? ❑Yes ❑N/A 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed ❑Block ❑Block Parged ❑Brick(type) ❑Poured Concrete ❑Piers Masonry Chimney: ❑Block Parged ❑Brick(type) ❑Other ___ Roof Pitch: Main Mass /12 Secondary Mass /12 Dormer . /12 Other Roofing material: ❑Asphalt: 0 3-Tab itectural Fence: Height: Wood (Type- Red Ceda lte Cedar,Shakes,etc.) Type: Length: _ Skylights(flat only): Manufacturer Rough Opening Size Location_ Manufacturer Rough Opening _ Size Location __ Gutters: ❑Wood ❑Aluminum ❑Copper ❑Leaders(material) _ Leaders(material and size):_ Sideway:El White cedar shingles .._ ❑Clapboard(exposure: inches) Front❑ Side❑ i 11 Other Trim: A.Wood ❑Pine ❑Redwood ❑Cedar ❑Other B.Treatment ❑Paint ❑Natural to weather ❑Other C.Dimensions: Fascia _ Rake Soffit(Overhang) _ Corner boards Frieze Window Casing _ Door Frame Columns/Posts:Round Square Windows': ❑Double Hung ❑Casement ❑All Wood ❑Other ❑True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer Doors'(type and material): ❑TDL J SDL Front Rear Side Garage Door(s): Type __._. Material Hardscape materials: Driveways _ Walkways —__ Walls 'Note: Complete door and window schedules are required. COLORS `, ' ' Sidewall ___-_ . ___.__- Clapboard(if applicable) _ _ Roof `'F. a� W�C�W Trim -___ __ - Sash _ Doors Deck Foundation __ _ Fence - - Shutters .' •Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and comply with the terms and conditions of this application.I hereby agree that the submission of any revisions to this application will initiate a new sixty-day review period. Date ,•1 ________-_ Signature of owner of recd _--_— _ _ - Signed under penalties 01 perjury CERTIFICATE NO: ._CV a V 9 DATE ISSUED: t l-/1)-61-1 Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a !!! CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. Acts and is a contractual 7 filled hn s ap pr f Re olves ofMass. 1970,for proposed worrk asdescribed herein application on plans, and photographs accompanying this and under ade a arthereofby reference. The certificate is valid for three years from date of issuance.No structure may differ FOR OFFICE USE ONLY �' it Vu' Cl 19 from the approved application.Violation may impede issuance of Certificate of Occupancy. PROPERTY DESCRIPTION Date application received: 111013 Fee Paid:$ V2 4" 'fAX MAP N°: c2•A PARCEL N°. 190 Must be acted on by: 3/1 2 t 3 Street&Number of Proposed Work: 1, ; ..P r' Extended to: ,----------•t �+�V�� yl Approved: Disapproved: l Owner of record: l_i1Wl/1 �`)(C-vi - ` - 0\C1—t-V1 �n r,r.,' I > Chairman: r 1 Mailing Address: ,JV 11Wv�t�1 Member: 1\N v _ l' Member: Contact Phone#:01'3)PJI05"'�53'I t-mail: —_ - Member: AGENT INFORMATION(if applicable) Member: Name:__.. A IA s✓ Notes-Comments-Restrictions-Conditions Mailing Address: P_ I./ P -- Contact Phone#( A-41-311 E-mail: DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. ❑New Dwelling ❑Addition ❑Garage Li Driveway/Apron ❑Commercial ❑Historical Renovation ❑Deck/Patio ❑Steps Ci Shed ❑Color Change ❑Fence Li Gate ❑Herds ng ❑Move Building ❑Demolition ❑Revisions to previous Cert.No. - ❑Pool(Zoning District ) ' Roof ❑ Other [c l' eat -— �t. I�Cf�7> 4- Size of Structure or Addition: Length: Sq.Foo age 1st floor: Decks/Patio: Size: El 1st floor ❑2nd floor Width: Sq.footage 2nd floor: Size: ❑1st floor ❑2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade: North South— East West Height of ridge above final finish grade: North- South East West additional Remarks REVISIONS' 1.East Elevation ' Historic Name: ' (describe) 2.South Elevation Original Date: 3.West Elevation Original Builder: 4.North Elevation Is there an HDC survey form for this building attached? ❑Yes ❑N/A 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed ❑Block ❑Block Parged ❑Brick(type) ❑Poured Concrete ❑Piers Masonry Chimney: ❑Block Parged ❑Brick(type) _ ❑Other Hoof Pitch: Main Mass /12 Secondary Mass /12 Dormer /12 Other Roofing material: ❑Asphalt: ❑3-Tab ❑Architectural Fence: Height: IXWood (Type: Red Cedar,White Cedar,Shakes,etc.) Type: Length: Skylights(flat only): Manufacturer Rough Opening Size Location_ ' Manufacturer Rough Opening Size Location Gutters: ❑Wood Li Aluminum ❑Copper ❑Leaders(material) _ Leaders(material and size): Sidewall: White cedar shingles ❑Clapboard(exposure: inches) Front❑ Side❑ ❑Other ' Trim:A.Wood ❑Pine ❑Redwood ❑Cedar ❑Other B.Treatment ❑Paint ❑Natural to weather ❑Other C.Dimensions: Fascia Rake Soffit(Overhang) Corner boards Frieze ' Window Casing Door Frame Columns/Posts:Round Square Windows': Cl Double Hung ❑Casement '❑All Wood ❑Other ❑True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer ' Doors'(type and material): ❑TDL ❑SDL Front Rear Side Garage Door(s): Type - Material Hardscape materials: Driveways Walkways Walls •Note: Complete door and window schedules are required. • COLORS ' Sidewall-- _. — Clapboard(if applicable) Roof_ANAL9n N '�,1p T �W Trim_ Sash Doors y_ Deck -.-__._ -_ Foundation _ Fence Shutters 'Attach manufacturer's color samples it color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the -cifications or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and comply ith the ter and conditions of this application.I hereby agree that the submission of any r vi_signs to this application will initiate a new sixty-day review period. Date"1/� Signature of owner of record f i—• Signed under penalties of perjury Nor` \ 111 CERTIFICATE NO: _. .79__Li_ C) DATE ISSUED: !/ /�/� Application to the HISTORIC DISTRICT COMMISSION,Nantucket.Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970,for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ FOR OFFICE USE ONLY from the approved application.Violation may impede issuance of Certificate of PO Occupancy. PROPERTY DESCRIPTION n Date application received: I t I .p�1O13 Fee Paid:$ q I TAX MAP N°: 5-(--( PARCEL N°. it 7 n9 Must be acted on by: .3'1 -I.'1DI_ Street&Number of Proposed Work: '.Q k�r-!G.tC.Y AS • �/��p Extended to: Owner of record: I�YE/ZI YAT3Z[�i yQ ��e4cC1' Approved: - Disapproved: Mailing Address: T.0-- >D X. A&54- Chairman: VIII A -A-G4-1 Dion- trattr�D— 44- 65.0e 2Member: p/ Member Contact Phone R: cte 6'44.3 91 E-mail: MYEILQ At A l00c 'A�i" Member: AGENT INFORMATION(if applicable) Member: Name: St/1Qt,-1 Gbt ►44 - Notes-Comments-Restrictions-Conditions Mailing Address: ' -0• get- 2a�`7 j�- Contact Phone#: ?Zoe t. T y(/6 E-mail:_i_-BC9,ac wS— DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. Li New Dwelling ❑Addition 0 Garage Li Driveway/Apron -'Commercial ❑Historical Renovation ❑Deck/Patio ❑Steps lik,Shed L)Color Change ❑Fence ❑Gate ❑Hardscaping ❑Move Building Demolition ❑Revisions to previous Cert.No. I H Pool(Zoning District_) ❑Roof ❑Other Simi-Ti _1L D_'Si Rd• Size of Structure or Addition: Length: 2.0' Sq.Footage 1st floor: 2_4O Decks/Patio: Size: ❑1st floor ❑2nd floor Width: f dtn: 12 Sq.footage 2nd floor: Size: 0 1st floor 0 2nd floor Sq.footage 3rd floor: /1 Difference between existing grade and proposed finish grade: North IC)/ '1- so' outh East West Height of ridge above final finish grade: North i- f South R r East J3' West /3 Additiona Rem l arks REVISIONS' 1.East Elevation Historic Name: 2 Original Date: (describe) 2.South Elevation 3.West Elevation Original Builder: 4.North Elevation Is there an HDC survey form for this building attached? Yes J N/A 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed 14 p ❑Block ❑Block Parged ❑Brick(type) Foured Concrete F1 Piers Masonry Chimney: ❑Block Parged ❑Brick(type) .__- ❑Other ---- Roof Pitch: Main Mass 9 /12 Secondary Mass -/12 Dormer 112 Other Rooting material: Asphalt: ❑3-Tab gArchitectural Fence: Height: 0 Wood (Type: _ 1Aihite Cedar,Shakes,etc.) Type: Length:_ Skylights(flat only): Manufacturer Rough Opening Size _ Location Manufacturer Rough Opening Size Location Gutters: Li Wood ❑Aluminum ❑Copper ❑Leaders(material) _ Leaders(material and size): Sidewall: White cedar shingles ❑Clapboard(exposure: - _ inches) Front❑ Side❑ II LI Other-__- Trim: A.Wood ❑Pine ❑Redwood XCedar ❑Other B.Treatment ❑Paint KNatural to weather ❑Other - III C.Dimensions: Fascia e �;I Rake _ Soffit(Overhang) Corner boards 54t Frieze /(JQ Window Casing sly hi, Door Frame�f Jay Columns/Posts:Round Square Windows': Double Hung ❑Casement ❑AIIWood ❑Other _-')l CI True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer A04E/f EW (10Q Doors'(type and material): ❑TDL 7SDL Front 9 4&M4" Pifigtear Side Garage Door(s): Type Material Hardscape materials: Driveways __ _ Walkways Walls •Note: Complete door and window schedules are required. COLORS Sidewall _ Clapboard(if applicable) Roof 6'RA- Trim '�' j�L4.pJi2�i-- r7J Sash dS TON C. .. . Doors_5,A U4 IE Lt/F047 lt< Foundation Fence__. Shutters__ - Deck _--_— - _ Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and co with the terms and•••• of thi . lication.I hereby agree that the submission of any revisiops this application will initiate a new sixty-day review period. / Signature of owner of record ,`�--1' A _ __ Signed under penalties of perjury Date //2 Zc? V % CERTIFICATE NO S'q(7 L DATE ISSUED: )1D-Y a-01 Application to the HISTORIC DISTRICT COMMISSION.Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HOC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970.for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ FOR OFFICE USE ONLY from the approved application.Violation may impede issuance of Certificate of Occupancy. • PROPERTY DESCRIPTION pP ) Date application received:- ) b 1 l3 Fee Paid:s-2-5-•TAX MAP N°: I___ _ PARCEL N°. 1 1 c •) Must be acted on by:- `31_i 1'1-1 DO Street&Number of of Propos ork: �c`L 1��-�1y)GCO�y\i Q k _ Extended to: Owner of record: \ ~` ri-(AV.\i 1 I�4, c Approved' Disapproved: Mailing Address: `�'0' Icy a1-2S _ Chairman: 1.' _1A A _ O`' voon. �t eri K449 _ Member: sk Contact Phone#:93%.-'901 16W% E-mail ' 7 rzwi Q*ev,,so,Member: _ - - ---- Member: —AGENT INFORMATION(if applicable) Member: --- --- Name:_- Notes-Comments-Restrictions-Conditions Mailing Address: -- - - � -- Contact Phone#: E-mail: DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. ❑New Dwelling ❑Addition ❑Garage ❑Driveway/Apron ❑Commercial Li Historical Renovation ❑Deck/Patio ❑Steps ❑Shed • ❑Color Change ❑Fence ❑Gate ❑Hardsc 'ng Move Building em9lition ❑Revisions is tto�pre�v-ious pert.No.oe ❑Pool(Zoning District ) ❑Roof A Other e�o.,.&!A�g� e"ekr A oo`1 Size of Structure or Addition: Length: Sq.Footage 1st floor: -i Decks/Patio: Size: ❑1st floor ❑2nd floor Width:_--- Sq.footage 2nd floor: Size: ❑1st floor ❑2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade. North- ___ South East West Height of ridge above final finish grade: North _— South -_— East West_ _ Additional Remarks REVISIONS' 1.East Elevation Historic Name: 2 Original Date: (describe) 2.South Elevation 3.West Elevation Original Builder: 4.North Elevation Is there an HDC survey form for this building attached'? ❑Yes ❑N/A 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed_ _ ❑Block El Block Parged ❑Brick(type) - L Poured Concrete '.J Piers Masonry Chimney: ❑Block Parged ❑Brick(type) __ ❑Other _- Roof Pitch: Main Mass___/12 Secondary Mass /12 Dormer /12 Other Roofing material: ❑Asphalt: 0 3-Tab XArchitectural Fence: Height: _- L Wood (Type: _R.ed Cedar,White Cedar,Shakes,etc.)- Type: -- 14' Length:— — Skylights(flat only): Manufacturer . Rough Opening_- -- Size—__ Location_ ___ Manufacturer Rough Opening_ Size Location _ Gutters: L..Wood LI Aluminum ❑Copper ❑Leaders(material) _ Leaders(material and size):. ---- -- — Sidewall:❑White cedar shingles _ __ ❑Clapboard(exposure:_ inches) Front❑ Side L.__ ❑Other — — - Trim: A.Wood ❑Pine ❑Redwood ❑Cedar ❑Other B.Treatment _1 Paint ❑Natural to weather ❑Other C.Dimensions: Fascia Rake _ Soffit(Overhang) Corner boards Frieze Window Casing Door Frame_ Columns/Posts:Round _Square Windows': ❑Double Hung ❑Casement Li All Wood ❑Other —_ —-- — ❑True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer Doors'(type and material): ❑TDL ❑SDL Front Rear _ Side .- Garage Door(s): Type Material Hardscape materials: Driveways _ Walkways —_ -._Walls •Note: Complete door and window schedules are required. �s COLORS Vr'bi / Sidewall _ Clapboard(if applicable) Roof e1�orreOq Doors Sash_—_ Trim _ __. - -—--- — Deck _ Foundation Fence_. _ _ Shutters •Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications• the plans containe • this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and •• • it term .• onditions of this a i lion.I hereby agree that the submission of any revi54on p this V)-application will initiate a new sixty-day review period. \ . .- Dale � � Signature of owner of record - - "--�"-- .-.._-_,_ Signed under penalties of perjury CERTIFICATE NO:_�0 7 a' DATE ISSUED:_ )j 1 g/1 Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a 1 CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970.for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years born date of issuance.No structure may differ from the approved application.Violation may impede issuance of Certificate of FOR OFFICE uSE ONLY occupancy. PROPERTY DESCRIPTION Date application received: f Jlo/I 3 _Fee Paid:S z5'''-° TAX MAP N°:_'2- __ PARCEL N°._ /3 _ Must be acted on by: I L�.�13 - _. - ___ �j� Extended to:-_ / __ — Street&Number of Proposed Work: �p wQ�t.-f3111 0.- _ _ - ,`/ G pp oved:��y'�K`= Disapproved: Owner of record: G d W 2r I ?- et/'to G O✓ _. _ M CI J A r C Chairman: Mailing Address: -- Member: / Member: Contact Phone#: 7,61- 72 3-Sk E-mail: AGENT INFORMATION(if applicable) Member: , Member: Name:_--- Y Jk(L,rL__._ � _ L I._ _ - Mailing Address:_ l tl- Notes-Comments-Restrictions-Conditions I1Gt Ou__1 Op OW`u(A _. ----- _ --- ---- - Contact Phone#: _SOT -' `T 3f(1/E-mail:___ ._ _. ___ -- DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. ❑New Dwelling ❑Addition ❑Garage ❑Driveway/Apron :l Commercial ❑Historical Re n Deck/Patio ❑Steps ❑Shed ❑Color Change ❑Fence ❑Gate ❑Hardscaping ❑Move Building 0 Demolition evisions o previous Cert.No.. 5'] )' S' ❑Pool(Zoning District_ ) ❑Roof ❑ Other _.__ - f 11')J 12. _- --_. -- Size of Structure or Addition: Length:_______-_ Sq.Footage 1st floor: Decks/Patio: Size: ❑1st floor ❑2nd floor Width:___ Sq.footage 2nd floor: Size: ❑1 st floor ❑2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade North South East Weal Height of ridge above final finish grade: North- .__ South _ East West __. Additional Remarks REVISIONS' 1.East Elevation t O v �l� V i O!)f i✓Y Historic Name- V e 2 v p t-n 1i-M r (describe) 2.South Elevation f.(�PR's �-}� Original Date: P Ec ye- G o t-1 M CG7V 2-_ -t, /-Jo UJ- 3.West Elevation Original Builder: 4.North Elevation O/'-'f &A"f {t�- - S tE. P R�4 Is there an HDC survey form for this building attached? ❑Yes ❑N/A At PPR.e V Ed G o P I Es e-i'le t-CS*rJ 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed_ ❑Block CJ Block Parged Li Brick(type) L Poured Concrete Li Piers Masonry Chimney: G Block Parged ❑Brick(type)_ _._ —__ ❑Other Roof Pitch: Main Mass /12_- Secondary Mass_____/12.___ Dormer__/12 Other Roofing material: ❑Asphalt: ❑3-Tab ❑Architectural [Fence: Height: ❑Wood (Type: Red Cedar,White Cedar,Shakes.etc.) Type: . Length: - Skylights(flat only): Manufacturer _ Rough Opening _ Size Location_ _. Manufacturer .Rough Opening Size Location Gutters: Li Wood !._Aluminum ❑Copper ❑Leaders(material) - ._ Leaders(material and size):____ — Sidewall: LI White cedar shingles-_ -_-- 0 Clapboard(exposure:_.___ inches) Front❑ Side a_.. -_ ❑Other _ Trim: A.Wood ❑Pine ❑Redwood ❑Cedar ❑Other___-____ B.Treatment L]Paint ❑Natural to weather ❑Other — ---- C.Dimensions Fascia _-. -. Rake_ Soffit(Overhang) _ Corner boards-.- _ Frieze- Window Casing Door Frame ____ Columns/Posts:Round____Square ____ Windows': ❑Double Hung ❑Casement ❑All Wood ❑Other__-__ ❑True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer _- Doors'(type and material): ❑TDL ❑SDL Front ____ -Rear __ - _ Side Garage Door(s): Type__—_ Material Hardscape materials: Driveways - __ _ __ Walkways Walls Note: Complete door and window schedules are required. COLORS Sidewall Clapboard(if applicable) Roof Trim_ Sash -- _ Doors - Deck_- _-_-__ - Foundation Fence Shutters 'Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and comply with the terms and conditions of tthis application.I hereby agree that the submission of any revisions to thib application will initiate a new sixty-day review period. /` L i�jT�C`��' / �,� Mf g pe I y Date._. L 1 — Signature of owner of record(��� '`6 /� 7W Heil under nettles of r ur CERTIFICATE NO: \ n DATE ISSUED: //2,--y/1 Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It Is strongly recommended lease seetotherrside flor submittal�requiirement Hncomp guidelines,applications will notaberrevie in wed by thedHOC.submittal of application. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970,for proposed work as described herein and on plans.drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ FOR OFFtC USE ONLY from the approved application.Violation may impede issuance of Certificate of Occupancy. / 3 Fee Paid:$ __ PROPERTY DESCRIPTION Date application received: / i(� TAX MAP N°: OOSS PARCEL N°. S•3 S' Must be acted on by: 3/1.4 13 .�ntreet&Number of Proposed Work: S ' ø tM t t�SkAM �V Extended to: Owner of record: r`k On vi-rd 'R- l o t< Approved: � Disapproved: Mailing Address: 1-L3 Cedtir Call. W Chairman: fin/� � �OLC.A-I"th� Sr. Seat PIA o nhl Member: Contact Phone#:Si?))P 1'JS3�-1 E-mail: �T0M- eats II E , Member: . N4 0 AGENT INFORMATION(if applicable) H ■ Co■'tt Meritber: - Member: Name:. CJ L S,_ Imo_1)1A_XV_-_ 0 6 q o Notes-Comments-Restrictions-Conditions r p Mailing Address: X Y iVAN'1uck4 t AM• OLssy Contact Phone#: So$-a.). 34y0 E-mail: COrAra/ eo-C1S}- NeF • DESCRIPTION OF WORK TO BE PERFORMED See rev- e for required documentation. ❑New Dwelling ❑Addition 0 Garage IX•Driveway 0 El Commercial E Historical Renovation y Dec iir ❑Steps ❑Shed ❑Color Change 0 Fence ❑Gate ,Albtardscaping ti Move Building r'Demolition 7.Revisions to previous Cert o. _ 0 Pool(Zoning District_) ❑Roof ❑ Other Size of Structure or Addition: Length: Sq.Footage 1st floor: Deck at Size: /0)C 10 ❑1st floor ❑2nd floor Width: Sq.footage 2nd floor: Size: ❑1st floor ❑2nd floor Sq.footage 3rd floor: _ Difference between existing grade and proposed finish grade: North South _ East West Height of ridge above final finish grade: North South East -. ___ West Additional Remarks REVISIONS' 1.East Elevation Historic Name: ' (describe) 2.South Elevation Original Date: 3.West Elevation Original Builder: 4.North Elevation Is there an HDC survey form for this building attached? ❑Yes ❑N/A 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed ❑Block ❑Block Parged ❑Brick(type) _ S Poured Concrete ❑Piers Masonry Chimney: L7 Block P.arged ❑Brick(type) ❑Other - ' Roof Pitch: Main Mass_ /12 Secondary Mass /12 Dormer /12 Other Roofing material: ❑Asphalt: 0 3-Tab ❑Architectural Fence: Height: ❑Wood (Type: .. White WA Cedar,Shakes,etc.) Type: Length: Skylights(flat only): Manufacturer Rough Opening Size Location Manufacturer Rough Opening Size Location Gutters: ❑Wood O Aluminum O Copper ❑Leaders(material) Leaders(material and size): Sidewall:0 White cedar shingles—_ ❑Clapboard(exposure: _inches) Front❑ ' Side❑ ❑Other — ' Trim:A.Wood ❑Pine ❑Redwood ❑Cedar 0 Other B.Treatment O Paint 0 Natural to weather ❑Other C.Dimensions: Fascia_ Rake Soffit(Overhang) Corner boards Frieze Window Casing Door Frame Columns/Post:Round Square ' Windows': ❑Double Hung ❑Casement ❑AII Wood ❑Other ❑True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer Doors'(type and material): ❑TDL ❑SDL Front Rear Side Garage Door(s): Type Material ' Hardscape materials: Driveways-At'CON' E c.Ck Avcr Walkways R(i CIC 5 N pAVb' Walls Note: Complete door and window schedules are required. P COLORS Sidewall Clapboard(if applicable) -__ __ Roof -- __ Trim _._ _ Sash_ . - Doors Deck Foundation Fence _ _- Shutters ( •Attach manufacturer's color samples if color is not from HDC approval list. Am, III I hereby authorize the agent named above to act on my behalf to make chang>-in the.+r Os or t - •lens contained in this application in order to bring the applica- lion into compliance with the HDC guidelines.I hereby agree to abide by and c'mply t and conditions of this application.I hereby agree that the submission of any revisions to this application will initiate a new sixty-day review period. (Si------- 'Date 4�Fj/_13_- _ Signature of owner of •- , ...s- Signed under penalties of perjury II CERTIFICATE NO: I b 1 DATE ISSUED: �/ y/( Applidation to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass,1970,for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ FOR OFFICE USE ONLY from the approved application.Violation may impede issuance of Certificate of Occupancy. // PROPERTY DESCRIPTION Date application received: Ito 13 -_Fee Paid:$c�s.— TAX MAP N°: tr 7 PARCEL N��°. aia lit Must be acted on by:—_ i 3 Street&Number of Proposed Work::,,, 7�_11zgcc w' -__- Extended to: — Owner of record: Lorin C/ on _- Approved: ■ Disapproved' l Chairman: _ ovCriv` Mailing Address: /f2/ _ 2 e�� , O v Member: ��QQ Member: Contact Phone#:5,g.4y2-006 E-mail: Member: _ AGENT INFORMATION(if applicable) �- Member: .__ -- Name: ∎G104_A„e[ — 36 S/ Notes-Comments-Restrictions-Conditions Mailing Address:- __. - j14cAiJ xe ms-g/ Contact Phone#:rV. - 0 E-mail: .14by---a"h_ 1 DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. ❑New Dwelling ❑Addition ❑Garage ❑Driveway/Apron ❑Commercial O Historical Renovation ❑Deck/Patio Li Steps LI Shed ❑Color Change ❑Fence ❑Gate ❑Hardscaping J Move Building -/�❑Demolition ,{ Re isions to previous Cert.No. ❑Pool(Zoning District_-_ ) Roof ko Other__ n�PP»>c.[h—J%4s��Q—,Ctcch clU'a 1. Size of Structure or Addition: Length: _- Sq.Footage 1st floor: Decks/Patio: Size: ❑1st floor ❑2nd floor Width: Sq.footage 2nd floor: _ Size:— ❑1st floor ❑2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade: North South .__ East West Height of ridge above final finish grade: North -. South __ _ East West Additiona Remarks REVISIONS' 1.East Elevation Historic Name: 2 Original Date: /733 (describe) 2.South Elevation 3.West Elevation Original Builder: 4.North Elevation Is there an HDC survey form for this building attached? ❑Yes ❑N/A 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed_ J Block ❑Block Parged J Brick(type) —Poured Concrete Piers Masonry Chimney: ❑Block Parged LI Brick(type) _ ❑Other Root Pitch: Main Mass____/12 Secondary Mass /12 - Dormer /12 Other Roof ing material: gi Asphalt: ❑3-Tab IgiArchilectural Fence: Height: ._ ❑Wood (Type: White Cedar,Shakes,etc.)__ Type: Length: Skylights(flat only): Manufacturer Rough Opening Size Location Manufacturer Rough Opening Size Location Gutters: L7 Wood ii Aluminum ❑Copper ❑Leaders(material)___ Leaders(material and size):._ —_-_ Sidewall:❑White cedar shingles _ LI Clapboard(exposure: _inches) Front❑ _Side❑ ❑Other -- Trim:A.Wood ❑Pine ❑Redwood ❑Cedar ❑Other - --- B.Treatment ❑Paint ❑Natural to weather ❑Other C.Dimensions: Fascia Rake Soffit(Overhang) Corner boards Frieze Window Casing. Door Frame Columns/Posts:Round_ Square Windows': Li Double Hung ❑Casement ❑All Wood ❑Other -- - Li True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer Doors'(type and material): ❑TDL ❑SDL Front _ Rear_ Side Garage Door(s): Type _ Material Hardscape materials: Driveways Walkways-- Walls __ 'Note. Complete door and window schedules are required. COLORS Sidewall - ..- _ _-.... Clapboard(if applicable) Roof —�� Trim---- - Sash Doors -- — ----- -- Deck ___ Foundation - Fence Shutters__. __- Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and comply wi the term n conditions of this application.I hereby agree that the submission of any revisionsfo I is application will initiate a new sixty-day review period. Date //i3 /„J ___ Signature of owner of record ..__.__ Signed under penalties of perjury CERTIFICATE NO: S.---96 741 DATE ISSUED: �1/�- Application to the HISTORIC DISTRICT COMMISSION,Nantucket.Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It Is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket In Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a Resolves of Mass.,1970,for agreement proposed work as described herein andio plans,drawings and for issuance of a photographs accompanying this pplication and made Chapter ail hereof byereference. The certificate is valid for three years from date of issuance.No structure may differ FOR OFFICE USE ONLY horn the approved application.Violation may impede issuance of Certificate of o 0 Occupancy. /PROPERTY DESCRIPTION Date application received: ii i4//43 Fee Paid:$z5- TAX MAP N°: 40pip S PARCEL N°. ' `��^ Must be acted on by:3//2//,j Street&Number of Proposed Work: If 4 l I-0�v `,NG� S t Extended to: 1 'Marl r \Q -�cel•i Approved: ✓ Disapproved: Owner of record: is 1�l J&Y1�,/n� 1`� / }-1�'1 Mailing Address: !ice LQ C i 14& 1�� Chairman: . ¶>' J 'V AO- '\ -E. O x,°106- Member: - Contact Phone#: I QtO`,47;Y1 1 o 3 '€ Member: Member: AGENT INFORMATION(if applicable) Member: Name: e • r. . '!: • . ,1 Mailing Address: O. S r 5'53 0ass`7 Notes-Comments-Restrictions-Conditions 2 Contact Phone#:'5 8•=6.6179 E-mail:�j'ON)�'►C��ur\ - -_ 1Yi)Ai l,C9v-, DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. ❑New Dwelling ❑Addition ❑Garage ❑Driveway/Apron ❑Commercial ❑Historical Renovation ❑Deck/Patio ❑Steps Shed ❑Color Change 0 Fence 0 Gate ❑Hardscaping 0 Move Building 0 Demolition 0 Revisions to previous Cert.No. ❑Pool(Zoning District ) ❑Roof ❑ Other Size of Structure or Addition: Length: IC)A Sq.Footage 1st floor: it) Decks/Patio: Size: / ❑1st floor ❑2nd floor Width:�� Sq.footage 2nd floor: Size: 4 ❑1st floor ❑2nd floor Sq.footage 3rd floor: LI Difference between existing grade and proposed fne gradeG //JSouth t ,WeS/S/�/ttt N7th Height of ridge above final finish grade: North ' _ �^v Sornh?L� East�/A West 'Y /� Additional Remarks / REVISIONS' 1.East Elevation Historic Name: (describe) 2.South Elevation Original Date: ' 3.West Elevation Original Builder: 4.North Elevation Is there an HDC survey form for this building attached? _Yes ii NIA 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED � � Foundation: Height Exposed____ n Block Block Parged `Brick(type) ll ^ ❑+Poured Concrete ❑ Masonry Chimney: ❑Bioock urged ❑Brick(type) _ i Otiuer (� `- "" Q N • + ' C Roof Pitch: Main Mass le) /12 Secondary Mass /12 Donner 712 Other Roofing material: ❑Asphalt: 0 3-Tab Architectural To W\1'4,1 l{ F1�1(o “IDOSI Fence: Haig t: ❑Wood (Type: Red Cedar,White Cedar,Shakes,etc.) Type: Length: Skylights(flat only): Manufacturer Rough Opening • I Size ovation Manufacturer_-- - Rough Opening /= Size Location Gutters: ❑Wood ❑Aluminum U Copper ❑Leaders(material) Leaders(material and size): Sidewall:OryVhite cedar shingles LL�_ke,)I_ a N S ❑Clapboard(exposure: inches) Front❑ Side❑ ❑Other Trim:A.Wood ❑Pine ❑Redwood 1S(Cedar ❑Other i� B.Treatment Paint ❑Natural to weather ❑Other e A i `1 Eir C.Dimensions: Fascia 1 X"f Rake ` ),6 Soffit(Overhang) I ,. N Corner boards it if Frieze Aar Window Casing ( K 14 Door Frame ,X14, Columns/Posts:Rou _Square Windows': I Double Hung 0 Casement ❑AlIWood 0 Other gco' CO 3/3 qI I&lossSIZP. ItTrue Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufa Curer ii Doors'(type and material): ❑TOL ❑SDL Front 6 2.1)4 C Ufael4 VRear Side Garage Door(s): Type Material Hardscape materials: Driveways , Walkways Walls 10 'Note: Complete door and window schedules are required. _- • tr n COLORS r ITl_Yl `�r(l{f o�� Sidewall AU—,i�� Ye� � ‘ A - Clapboard(if applicable),_ Roof /! I�ll9 `Z S V-A�O\Z. Trim ,=r y� _ e► Sash Doors ��L,1�� Deck_ --c-C401"1‘: n OQ-. Foundation Fence Shutters 'Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifi �►Imns or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and co with th:/�T/a • •ikons of this application.I hereby agree that the submission of any revision to thi ap lication will initiate a new sixty-day review period. µ �� Date /S / — — Signature of owner of record _ Signed under penatties of perjury CERTIFICATE NO: ._\. L C)y_2 DATE ISSUED: I)-)- 1/411 I,� , Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970,for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ FOR OFFICE USE ONLY #33 0 (I from the approved application.Violation may impede issuance of Certificate of P�is fro Occupancy. PROPERTY DESCRIPTION Date application received: 1/1V /3 Fee Paid:S�• TAX MAP N°: __ PARCEL N°. -5e;="--/ Must be acted on by:_ 3//2/R3 �� Extended to: _----------/ / Street&Number of Proposed Work:.�7N �i4i� 0U.c/', c�J. Approved: Disapproved Owner of record: OrVIL�,E4�_1S[•- �j�� /fir TEST v� Chairman: G�/�_�-� \ O`c'fis' / - Mailing Address: 24'� _r?�L�LGU1rF ,---„f„,,,-,_z- Member: Member: Contact Phone#: Lv _2% zY' E-mail:jF:e4.7,7r-'cerk:O.i 44.,- Member: AGENT INFORMATION(if applicable) Member: - Name:_ -./L �1"7"S /4-2.‘k „, /,,/,.- Notes-Comments-Restrictions-Conditions Mailing Address:_ //�_ 3 r3, ,,,�� Contact Phone#:a lo'11F'G:,e,3 E-mail: -. ,?::?-,e-C,Ts E-mail, -'- 6.? DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. ❑New Dwelling ❑Addition ❑Garage ❑Driveway/Apron ❑Commercial ❑Historical Renovation ❑Deck/Patio ❑Steps ❑Shed 0 Color Change ❑Fence ❑Gate ❑Hardscaping ❑Move Building 'Deemmo�n ❑Revisions to previous Cert.No. ❑Pool(Zoning District__) ❑Roof ❑ Other - - Size of Structure or Addition: Length: - Sq.Footage 1st floor: s f yx- Decks/Patio: Size: ❑1st floor ❑2nd floor Width: Sq.footage 2nd floor: Size: ❑1stfloor 0 2n floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade: North South__ East West _ Height of ridge above final finish grade: North — South East West Additional Remarks REVISIONS' 1.East Elevation Historic Name: (describe) 2.South Elevation Original Date: 3.West Elevation Original Builder: 4.North Elevation Is there an HDC survey form for this building attached? ❑Yes ❑N/A 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed ❑Block ❑Block Parged ❑Brick(type) _ ❑Poured Concrete ❑Piers Masonry Chimney: ❑Block Parged ❑Brick(type) ❑Other_ __- -_ Roof Pitch: Main Mass /12 Secondary Mass__--_112 Dormer /12 Other Roofing material: 0 Asphalt: 0 3-Tab L7 Architectural Fence: Height: ❑Wood (Type: Red Cedar,White Cedar,Shakes,etc.)_ Type: Length: Skylights(flat only): Manufacturer_ Rough Opening Size Location Manufacturer _ _ Rough Opening Size Location Gutters: ❑Wood 0 Aluminum ❑Copper ❑Leaders(material) Leaders(material and size):_ —__ Sidewall:❑White cedar shingles _ 0 Clapboard(exposure: inches) Front❑ _Side❑ ❑Other __ Trim:A.Wood ❑Pine ❑Redwood ❑Cedar ❑Other B.Treatment ❑Paint ❑Natural to weather ❑Other - - - C.Dimensions: Fascia Rake Soffit(Overhang) Corner boards Frieze __- Window Casing Door Frame_- Columns/Posts:Round Square Windows': ❑Double Hung ❑Casement ❑All Wood Li Other OTrue Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer _ - Doors'(type and material): ❑TDL ❑SDL Front Rear Side Garago Door(s): Type Material - Hardscape materials: Driveways Walkways Walls •Note: Complete door and window schedules are required. COLORS Sidewall _ Clapboard(if applicable)__.-- _ Roof - Trim -_ Sash Doors Deck Foundation Fence_ Shutters 'Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans cont ned in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and comply t e terms and condit)o»s of t s application.I hereby agree that the submission of any revisions to this application will initiate a new sixty-day review period. /� , / Signed under penalties of perjury -- /A /ti. /? Signature of owner of record comply ---- - C DATE ISSUED: CERTIFICATE NO: - /®� d Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket In Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970,for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ from the approved application.Violation may impede issuance of Certificate of Occupancy. FOR OFFICE USE ONLY PROPERTY DESCRIPTION Date application received: /1/te'13 Fee Paid:$2�- _ TAX MAP N°: 40 PARCEL N°. 9a. Must be acted on by: 3/1 I-12.0 f Street&Number of Proposed Work: 9 W N Hi;1'6 P0•140 Rol Extended to: Owner of record:. HAn aY c S'�h9R.oni Pp«9c� Approved: 1\(' ,�� _ ;S prov F Mailing Address: 9 w Atrey-/•ve /�o.,,p i4d. Chairman:-� " �'`' _aC`/ C�11 1 ,Yel"7yt-1.-e7 fr.,,, o -rry Member: - Telephone: (on island) _(off island) Member:_ AGENT INFORMATION(if applicable) Member: ____ --- Name: 7/we-0,ir-I /ti.i , Member: 4-4 ✓r-t29 y',"T Pr. Notes-Comments-Restrictions-Conditions Mailing Address: /W1—vc-r T H•,9 0'z-r5 f -- Telephone: Cif-2'42'-17 3 r (on island) (off island) DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. New Dwelling Addition ❑Garage Garage/Apartment .Commercial _Historical Renovation _._Deck ,Steps ❑Shed . Color Change _Fence -Gate Paving Move Building —Demolition rrRevisions to previous Cert.No. Sd-'Sa't/ C Other(please specify) Size of Structure or Addition: Length: Sq.Footage 1st floor Decks: Size: —1st floor 2nd floor Width: Sq.footage 2nd floor: Size: —1st floor 2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade: North South East West Height of ridge above final finish grade: North South__ East West Additional Remarks R a I • 1.East Elevation Historic Name: (des •e) 2.South Elevation Original Date: 3.West Elevation Original Builder: 4.North Elevation Is there an HDC survey form for this building? Yes .._No 'Cloud on drawings and submit photographs of existing elevations. r 77. DETAIL OF WORK TO BE PERFORMED Poured Concrete Piers Foundation: Height Exposed ❑Block Block Parged _Brick(type) Masonry Chimney: _Block Psrged ❑Brick(type)_ Other Roof Phch: Main Mass /12 Secondary Mass /12 Dormer /12 Other Roofing material: L,Asphalt Manufacturer Fence: Height: =J Wood (Type: Red Cedar,White Cedar,Shakes,etc.) Type:. ❑Other Manufacturer .". Length: Skylights(flat only): Manufacturer Rough Opening Size Location Manufacturer Rough Opening Size Location Gutters: ❑Wood(type) ❑Alu urn =Copper• Leaders(material and size): Sidewall:E.White cedar shingles ❑Clapboard(exposure: inches) Front 0 Side n G Other _- Trim: A.Wood Pine .Redwood ❑C=.. i Other B.Treatment Paint Stain-solid O•.atural to weather _._Clear oil finish C.Dimensions: Fascia Rake Soffit(Overhang) Corner boards Frieze Window Casing Door Frame_ Columns/Posts:Round_Square Windows': - Double Hung C- ement li All Wood L Other - True Divided Lig. (muntins) ❑SDL's(Simulated Divided Lights) Doors'(type and material): Front Rear _-_ Side Garage Door(s): Type Material, Landscape materials: Driveways _ _ Walkways Walls •Note: Complete door and window schedules are required. COLORS Sidewall .__ _ Clapboard(if applicable) Roof Trim Sash Doors--_—_-- Deck Foundation Fence _. Shutters _ _ •Attach manufacturer's color samples it color is not from HD prove!list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans contained in this application in order to bring the application into compliance with the HDC guidelines.I hereby agree to abide by and comply with the terms and conditions of this application.I hereby agree that the submission of any revisions to this application will initiate a new sixty-day review per ./,l Date //`// Lei '� Signature of owner of record �Q Signed under penalties of perjury CERTIFICATE NO:_s-9 0(41---- DATE ISSUED: i/)--Li 1)-o?3 Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It Is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantycket In Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970,for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ from the approved application.Violation may impede issuance of Certificate of FOR OFFICE USE ONLY Occupancy. PROPERTY DESCRIPTION Date application received: )/110 PO I Fee Paid:$ a-J TAX MAP N°: 1-1 I PARCEL N°. SSO -- Must be acted on by: /1:1 t?'°13 Street&Number of Proposed Work: I( Ulotoat i 1 t,MA Extended to: Owner of record: �i9 Woo t_%)sit-TOP-1 Approved:"''� Disapproved Mailing Address: H W OoW (,e 'i Chairman:�r/t/Li- ` OVA-C .. N Y}wNC.t,-c-j 5-" 'et Member:_-_ Contact Phone#: E-mail: - Member: AGENT INFORMATION(if applicable) Member: Name:, /9 NE RN Member. _ 1-604 1-604 ti L OD Notes-Comments-Restrictions-Conditions Mailing Address: Po Nn ft/ryc -r 147 /9 Contact Phone#: SW-322 3''n 3 P E-mail:d-`e. -'o c` ^•"' • DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. L,New Dwelling ❑Addition ❑Garage C Driveway/Apron C Commercial O Historical Renovation ❑Deck/Patio ❑Steps Ll Shed Li Color Change ❑Fence ❑Gate ❑Hardscaping ❑Move Building ❑Demolition ❑Revisions to previous Cert.No. L Pool(Zoning District ) ❑Roof Other (51-t,rvD X 12- Sr H-o`k- C A' c(.6-' 1 A/6 T ) Size of Structure or Addition: Length: ' Sq.Footage 1st floor: Decks/Patio: Size: ❑1st floor ❑2nd floor Width:Wi Sq.footage 2nd floor: Size: ❑1st floor ❑2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade: North South East West Height of ridge above final finish grade: North _ South East West Additional Remarks REVISIONS' 1.East Elevation Historic Name: Original Date: (describe) 2.South Elevation Original Builder: 3.West Elevation • 4.North Elevation Is there an HDC survey form for this building attached? ❑Yes ❑N/A 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed ❑Block ❑Block Parged ❑Brick(type) ❑Poured Concrete Li Piers Masonry Chimney: ❑Block Parged ❑Brick(type) -_ ❑Other Roof Pitch: Main Mass /12 Secondary Mass 112- __ Dormer /12 Other - -__ - Roofing material: ❑Asphalt: ❑3-Tab ❑Architectural Fence: Height: ❑Wood (T • ite Cedar,Shakes,etc.)_ Type: • r Length: -_ Skylights(flat only): Manufacturer ^ Rough Opening Size Location - Manufacturer ' • Rough Opening Size Location Gutters: U Wood ❑Aluminum ❑Copper ❑Leaders(material) Leaders(material and size): _ Sidewall:❑White cedar shingles ❑Clapboard(exposure: inches) Front❑ Side❑ ❑Other Trim:A.Wood ❑Pine ❑Redwood 0 Cedar ❑Other • B.Treatment ❑Paint ❑Natural to weather ❑Other _ C.Dimensions: Fascia Rake Soffit(Overhang) Corner boards_ Frieze Window Casing Door Frame Columns/Posts:Round Square Windows': ❑Double Hung ❑Casement ❑All Wood ❑Other ❑True Divided Lghts(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer _ _ Doors-(type and material): ❑TDL ❑SDL Front . Rear Side Garage Door(s): Type Material _ Hardscape materials: Driveways _ Walkways Walls 'Note: Complete door and window schedules are required. COLORS Sidewall _ _ Clapboard(if applicable) _. _-- Roof ------- -------- -- Trim- Sash Uoors Deck----- - _. Foundation ----------- ----- -- - - - Fence --- - Shutters 'Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and comply,with the terms and conditions of this application.I hereby agree that the submission of any revisions to this application will initiate a new sixty-day review period. . Date 1/ i/ 14,13 . - Signature of owner of record ..'\.,`.21;,'''''''}Ck Sinned under cenanies m neru uv CERTIFICATE NO:57 0`/ DATE ISSUED: �f a11/.0 Application to the HISTORIC DISTRICT COMMISSION,Nantucket.Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. . NOTE:It is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. Resolves l a contractual 9ag7r0,for and must ork aslddescrcribednhe An a�ndloontplans,drawings and for photographs of a accompanying this Appropriateness and under made a part rhereoffby the referen e. Resolves of Mass.,1970,for proposed The certificate is valid for three years from date of issuance.No structure may differ FOR OFFICE USE ONLY from the approved application.Violation may Impede issuance of Certificate of 'pa PROPERTY DESCRIPTION Date application received: It IL.# 13 __ Fee Paid:Sag___ - TAX MAP N°: tO PARCEL N°. 1,21/ Must be acted on by: 31113 -- -. Street&Number of Proposed Work: ,W1,-- J104 po• Extended to: / Approved: � ✓ Disapproved: \\ Owner of record: �,ls:t�L �� / atil�) Chairman: `!t i I _ - ---- . Mailing Address: 1�J?i� "� �1 .��/_� �{,,,Ny,r�7f' Af-r t12tjcJ:1 Member: - — --- T Member: Contact Phone 04)7;4,4;4tj?, ) E-mail: Member: AGENT INFORMATION(if applicable) y, rte`, `'.t, Member: Name: 77 fAS"6 S Notes-Comments-Restrictions-Conditions Mailing Address: 1‘9 CA IV' Contact Phone a'f 50 10-61.11. E-mail: DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. [I)New Dwelling ❑Addition ❑Garage ❑Driveway/Apron ❑Commercial ❑Historical Renovation ❑Deck/Patio ❑Steps `_I Shed U Color Change U Fence ❑Gate ❑Hardscaping ❑Move Building ❑Demolition v7 U Pool(Zoning District ) loot ❑ cA Other � -r1 (e4 3 vs 10 A A41 1 - Size of Structure or Addition: Length: Sq.Footage 1st floor: Decks/Patio: Size: 1st floor ❑2nd floor Width: Sq.footage 2nd floor: Size: ❑1st floor ❑2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade: North- South East West - — Height of ridge above final finish grade: North South East Wei -- Additional Remarks REVISIONS' 1.East Elevation Historic Name: (describe) 2.South Elevation Original Date: 3.West Elevation Original Builder: 4.North Elevation Is there an HDC survey form for this building attached? ❑Yes ❑N/A 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed— _ ❑Block ❑Block Parged ❑Brick(type) _ U Poured Concrete L!Piers Masonry Chimney: ❑Block Purged (i Brick(type) — ❑Other — Root Pitch Main Mass /12 Secondary Mass X12_ Dormer 112 Other --- Roofing material: pAsphalt: 0 3-Tab XArchitectural Fence: Height:_ Li Wood (Type ' White Cedar,Shakes,etc.) Type: Length: — Skylights(flat only): Manufacturer ` Rough Opening Size Location__ Manufacturer • Rough Opening Size Location Gutters: U Wood U Aluminum ❑Copper ❑Leaders(material) — Leaders(material and size): . Sidewall:❑White cedar shingles ❑Clapboard(exposure: inches) Front❑ Side❑ ❑Other — Trim:A.Wood ❑Pine ❑Redwood ❑Cedar ❑Other - B.Treatment ❑Paint ❑Natural to weather ❑Other _ C.Dimensions: Fascia Rake Soffit(Overhang) Corner boards Frieze Window Casing Door Frame Columns/Posts:Round_Square Windows': ❑Double Hung ❑Casement ❑All Wood ❑Other ❑True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer • Doors'(type and material): ❑TDL ❑SDL Front Rear Side Garage Door(s): Type Material Hardscape materials: Driveways Walkways Walls •Note: Complete door and window schedules are required. - COLORS tom]���1 '.,'�! Sidewall Clapboard(if applicable) Roof M,I '•' mil' Trim Sash Doors Deck _ ___ Foundation Fence Shutters •Attach manufacturer's color samples if color is not from HOC approval list. I hereby authorize the agent named above to act on my behalf to make changes he specifications or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and co ply with th•ter-r. .••conditions of this application.I hereby agree that the submission of any revs ions ty this application will initiate a new sixty-day review period. ♦ 6�i�_ Signed under penalties nl pequry Date .. _ _ _-- Signature of owner of record �► - - CERTIFICATE NO: ,rf,r4 0 O DATE ISSUED: I/,,,.y//3 Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HOC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be tilled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970.for proposed work as described herein and on plans.drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ from the approved application.Violation may impede issuance of Certificate of Occupancy. FOR OFFICE USE ONLY ig.zbp3 td itvjnr AMR! kl PROPERTY DESCRIPTION /� Date application received: /l it,'f 1 R Fee Paid:$2S t0 TAX MAP N°: Pa& PARCEL N°./►`T�SS Must be acted on by: 3/12413 Street&Number of Proposed Work: I3C eRv A n bra. Extended to: ..- Owner of record: (ha i& 4 Vayia W BO El / Approved: _ /Disapproved: l • Mailing Address: tg 4-�' � IA'IeY anti 1>� Chairman: n�`��v NtrM� NAn'ei,7417 AU-VI Member: Contact Phone ff.(5N-3322455 E-mail: Member: Al GENT INFORMATION(if applicable) Member: Name: -T121 NT ClrlOr y - __ _, Member. �D$ 7 K4 Notes-Comments-Restrictions-Conditions Mailing Address: )0a n c o f/ A oasgc/ — Contact Phone#: S`ce'221..I`/70 E-mail:---- — DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. New Dwelling Addition ❑Garage _Garage/Apartment Commercial ._ Historical Renovation Deck Steps 4-Shed Color Change Fence ate Paving ._'Move Building __Demolition Ti Revisions to previous Cert.No. .Roof - Other Size of Structure or Addition: Length: I Sq.Footage 1st floor: Decks: Size: —!1st floor __2nd floor Width: �j I Sq.footage 2nd floor Size: Ti 1st floor _. 2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish glade: North O South 0 East C West CO Height of ridge above final finish grade: North g I South 131 ( East F3 I I West f 3 r' Additional Remarks REVISIONS' 1.East Elevation listonc Name. . •....ni♦ - - aer' 2.South Elevation..._. Original Date: 3.West Elevation Original Builder. 4.North Elevation ,e. a --,_ is tore an HOC s_-.e, : : '�SNlitfng'alladred? _ Yes 'WA--''''Cloud on drawings and submit photographs of ex slog elevations. II DETAIL OF WORK TO BE PERFORMED Poured Concrete `hers Foundation Height Exposed ---. __Block Block Parged ❑Brick(type) ,)GP Masonry Chimney: Block Pfrged -Brick(type) _Other - Roof Pitch-. Main Mass Q /12 Secondary Mass_ /12 Dormer X12 Other Roofing material: ysphalt: .(.- -Tab Architectural Fence: Height: Wood (Type: Red Cedar,White Cedar,Shakes,etc.) Type: Length: Skylights(flat only): Manufacturer _Rough Opening Size Location Manufacturer Rough Opening Size Location -- - Gutters: Wood Aluminum l •Copper Leaders(material) Leaders(material and size): kWh Sidewall: ite cedar shingles __- E Clapboard(exposure: inches) Front-_ Side i i i Other Trim: A.Wood . Pine ❑Redwood IE'Cedar Other B.Treatment I pfraint ❑Natural to weather r / C.Dimensions: Fascia /)(e ,!Rake /Y. Soffit(Overhang) Comer boards PiG Frieze Window Casing /ICY Door Frame t a LI Columns/Posts:Round Square Windows': ible Hung ❑Casement ❑All Wood _Other ❑True Divided Lights(muntins) IB'SrDL's(Simula�te"d Divided Lights) Manufacturer Doors'(type and material): Front IP'1Gkne( 'Pt f�1.c c5 Rear Side Garage Door(s): Type--_ Material Hardscape materials: Driveways Walkways- Walls •Note: Complete door and window schedules are required. I f COLORS Sidewall Ll11 rte It elm Sh I 1,14 i{r Clapboard(if apptcable) - - Roof V/'OLU►�J ^ i irC � 1O ose Trim fill r�It — _ Sash_--C i ?1�.. Doors [�J/a/she Deck_ Foundation Fence Shutters- •Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans contained in this application in order to bring the application into compliance with the HDC guidelines.I hereby agree to abide by and comply with the terms and conditions of this application.I hereby agree that the submission pf y revisions to this application will initiate a new sixty-day review period,. j�� .,fit^ Date 1�6 — Signature of owner of record X 1"C'• w'x� I""'``'lzt` Skirted under penalties of Penury _ _ //)"y/d-0j3 CET :ATE NO: S f OS l DATE ISSUED: Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970.for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ from the approved application.Violation may impede issuance of Certificate of F•R OFFICE USE ONLY Occupancy. PROPERTY DESCRIPTION // ( Date application received:_ • •/3_-- Fee Paid:S TAX MAP N°:_ h 8 AA PARCEL N . 21 7(Pnar•1_). Must be acted on by: Street&Number of Proposed Work:6Q/-% 'f ve 'Tee 1\aud, _ Extended to: Owner of record: A.re\ h ■i1% ?,-)D Approved: ✓ Disapproved' Mailing Address: L /' �17■rte-,_rre-e. v.�C — Chairman: ' c�M �) Nti1n4-sAGk0-t 1'1 At OZ 554 Member:----_- - --- Member: Contact Phone#: Z2T .3-10 3 _E-mail: Member: AGENT INFORMATION(if applicable) - Member: Name: wnAC_. --- —-- - Notes-Comments-Restrictions-Conditions Mailing Address: Contact Phone#: _ -__ E-mail. DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. ❑New Dwelling ❑Addition ❑Garage L_Driveway/Apron ❑Commercial ❑Historical Renovation Li Deck/Patio ❑Steps ❑Shed ❑Color Change ❑Fence ❑Gate Hardscaping ❑Move Building C Demolition ❑Revisions to previous Cert.No. ❑Pool(Zoning District.—_._) ❑Roof Other__ j?-ntGV1 Size of Structure or Addition: Length: 1°1-O Sq.Footage 1st Iloor: 22 5F Decks/Patio: Size:-_- ❑1st floor ❑2nd floor Width:__12; Sq.footage 2nd floor: - Size: - ❑1st floor ❑2nd floor Sq.footage 3rd floor:_- Difference between existing grade and proposed finish grade: North E.,-, 41‘i.,\. South iSi s, East Ext,f`,_ West E's t e)5. Height of ridge above final finish grade: North�� SouthsM✓_ Eas -.x Nest EjGt;d•�1 U Additional Remarks v O REVISIONS' 1.East Elevation Historic Name. 2.South Elevation Original Date: (describe) 3.West Elevation = }qt..; 2.2 al,by ?. - Original Builder: 4.North Elevation Is there an HDC survey form for this building attached? :A Yes N/A 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED • Foundation: Height Exposed 0 Block L Block Parged ❑Brick(type) - L Poured Concrete Piers Masonry Chimney: C Block farged C Brick(type) - ❑Other - —__ Roof Pitch: Main Mass/ - /12 - Secondary Massa A /12 fore, Dormer /12 Other -_. __. _ ___ • Roofing material: tl Asphalt Li 3-Tab Li Architectural Maki Fence: Height:-/�ia 2 -to cjct� r►, Li Wood (Type: Red Cedar,White Cedar,Shakes,etc.) Mak l+ EXIJ't Type: Makin EXi S)6 e Length: S 1-Q 4 Skylights(flat only): Manufacturer �^ _-_ _Rough Opening - Size - Location - Manufacturer Rough Opening Size Location • Gutters Wood 0 Aluminum 0 Copper ;,.Leaders(material)_. ^ -- -. ._- Leaders( - and size): — - _ - -.-- -- ----- --- ---- Sidewdl:e ceda•shingles —__—_ ❑Clapboard(exposure: inches) Front IT Side U- ❑Other - — �/ ---- ------ - Trim: A.Wood Pine ...Redwood l edar Other __ ---_ B.Treatment O Paint Natural to weather ❑Other C.Dimensions: Fascia 1 X(, ___ Rake 1 Kl Soffit(Overhang) 3 Comer boards= _ Frieze - • Wirielew Gesino 'Fran*•])c1 Door Frame 2N4 CALL Columns/Pasts:Relnd—_Square(-x(a Windows': --_i Double Hung 0 Casement CAC Wood ::Other r_ - — True Divided Lights(muntins).single pane SDL's(Simulated Divided Ligh:s) Manufacturer :: t 1 Doors'(type and material): E TDL :,SDL Front �Xi 1-ey Rear ' c -v'•C Side Kew 3-0't ?NI/1M w+ Garage Door(s): Type-__ - Material -_ - _ Hardscape materials: Driveways ' Walkways - Walls - *Note: Complete door and window schedules are required. - _ _ ., ` COLORS Sidewall 1 a1 1�Wr{AIL Clapboard(if applicable) 1_- ` Roof '' t vaa�{� C)cTn�'\o. • Trim 1 l �w .k•-;,(1.• Sash- Al pea/M4 o _ Doors--tot `k kf ra a.y V-. Deck l a :ALL s. Foundation = _ Fence-lQ�yy.,,/r%__ _ Shutters- 'Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in t specifications or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and com witphhe terms and conditions of this application.I hereby agree that the submission of any revisions to is ap lication will initiate a new sixty-day review period. V Date- _t I�(t �t T. Signature of owner of record ,t oc'-` " _ - Signed under penalties of perjury CERTIFICATE NO: ._C-( os- DATE ISSUED: i)2 //3 Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HOC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970,for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ horn the approved application.Violation may impede issuance of Certificate of FOR OFFICE USE ONLY Occupancy. PROPERTY DESCRIPTION Date application received: CY-2 9"/3 Fee Paid:S 76i- TAX MAP N°: 5_S PARCEL N°. l�4r�Z- I Must be acted on by: d 3-12.-l3 vV i _ Street 8 Number of Proposed Work: 3 �7 l ii• Extended to:. . — Owner of record: 'UMW,*1/444CZ Approved: - Disapproved: - Mailing Address: J a 4 M Y' Chairman: J�/��� !� �b' n--r' Ue / ,iVY. Dri D Member: • Member: Contact Phone k:( 42 0 i—4 E-mail: / AGENT INFORMATION(if applicable) Member: • Member: Name:_ Notes-Comments-Restrictions-Conditions Mailing Address: _ O ??6�,t g. ■ s_,.A ..,. ' ' .•L/;,i Contact Phone#:Cr � 1,_E-mail: DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. ❑New Dwelling 0 Addition ❑Garage ❑Driveway/Apron ❑Commercial ❑Historical Renovation ❑Deck/Patio ❑Steps ❑Shed ❑Color Change ❑Fence ❑Gate L Hardscaping ❑Move Building ❑Demolition Revisions to previous Cert.No. 5-8 Li Pool(Zoning District ) ❑Roof Li Other Size of Structure or Addition: Length: _I� _ Sq.Footage 1st floor: Decks/Patio: Size: 'Lt., ❑1st floor ❑2nd floor Width: �L Sq.footage 2nd floor: Size: ❑1st floor ❑2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade: North South East West Height of ridge above final finish grade: North 1,1I(c_- South .tZO thfc) East Lk 't L West (f16-2o�;ICS Additional Remarks t REVISIONS" 1.East Elevation .. °Po No-r VI/S141 Historic Name: - ' ' i Original Date: (describe) 2.South Elevation 11? ft� A6j4 50 a' lC b• J r(eiJE 3.West Elevation � / ►p1\evJ' f'1/4 i 1r FalOn.15 G Original Builder: y,�„flwD 6. i�r .t 4.North Elevation %'P^_ 'v1 Is there an HDC survey form for this building attached? ❑Yes ❑WA "Cloud on drawings and submit photographs of existing elevations. Vfaf,(i a 4' •4 DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed Pr �) ❑Block ❑Block Parged ❑Brick(type) [ Poured Concrete Piers Masonry Chimney: 0 Block Purged ❑Brick(type) ❑Other �� Roof Pitch: Main Mass=1 /12 Secondary-Mass /12 Dormer_5_____/12 Other._ Roofing material: ,Asphalt: lit 3-Tab ❑A(dlitsctural Fence: Height: ❑Wood (T hite Cedar,Shakes,etc.)_ Type: Length: Skylights(flat only). Manufacturer ' Nigh Opening 114 Size Location Manufacturergh Opening_ (1A11s1) Size Location ' Gutters: ❑Wood ❑Aluminum 0 Copper• ❑Leaders(material) Leaders(material and size): --- -- Sldewall: White cedar shingles ❑Clapboard(exposure: -- inches) Front❑ Side Fl ❑Other Trim:A.Wood ❑Pine ❑Redwood 0 Cedar ❑Other B.Treatment �)t Paint ❑Natural to weather ❑Other - - _ C.Dimensions: Fascia 8 Rake - Soffit(Overhang) Corner boards Frieze Window Casing 1 ZCt Door Frame Columns/Posts:Round Square Windows': IX Double Hung ❑Casement ❑All Wood ❑Other True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer Pj05 ilaGN-Z312.t3Q6S<- Doors'(type and material): ❑TDL ❑SDL Front Q .fttatf,16/ Rear ~.4' Side gIT ' ' Garage Door(s): Type Material Hardscape materials: Driveways Walkways -- Walls •Note: Complete do• and window schedules are required. ' WA// r COLORS ���r Si.:-all _._ Clapboard(if applicable) J _ Roof �P11 ).. ' /y�'(�//�, h��, Trim N1/( t - Sash ��` -------- --- Doors_ VI�` G'r„"_- wiW- - Deck __ lt Foundation Fence Shutters•Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and co pl with the terms and conditions of this application.I hereby agree that the submission of any revisions to this application will initiate a new sixty-day review period. Date t 1 I U 1 V 4_ Signature of owner of record Signed under penalties of perjury CERTIFICATE NO: l OS DATE ISSUED:_ ,I Yik-3 Application to the HISTORIC DISTRICT COMMISSION.Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass..1970.for proposed work as described herein and on plans.drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ from the approved application.Violation may impede issuance of Certificate of FOR FFICE USE ONLY Occupancy. PROPERTY DESCRIPTION application 1 - �/ / Date a lication received:_ 1 In f l Fee Paid:$ TAX MAP N°:_�/. -_ . PARCEL N'. (eD F. / - Must be acted on by: II)__ -t1!3 G Extended to: -- Street&Number of Proposed Work: ��Y7LS2T7 - �7�f zG! Owner of record: ( n7Yr 674_.4L,�/ 16 0j� Approved: /1� � Disapproved: , -� / 4/31-- Chairman: CA >,1\ A Cfl Mailing Address: �� �r IC 1�i�'/�, - 1' 77,/1/1 (,7JL( Member: Member: Contact Phone#: __E-mail: AGENT INFORMATION(if applicable) Member: _ _ — — Member: -- Name: -.. -7-44-04,4_ Notes-Comments-Restrictions-Conditions Mailing Address: _— (I r., 32 .�, Afil- Contact Phone#: 4/yam E-mail: _ DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. ❑New Dwelling ❑Addition Li Garage ❑Driveway/Apron ❑Commercial ❑Historical R ovation ❑Deck/Patio �❑Steps ❑Shed color Change ❑Fence ❑Gate ❑Hardscapl g i7 Move Building L Demolition visions to previous Cert.No-. Z c 7 ❑Pool(Zoning District ) ❑Roof ❑ Other _�F I E GLA-YTB)c -,1/41&i∎3 6,Tky Size of Structure or Addition: Length: jl- Sq.Footage 1st floor: - Decks/Patio: Size: ❑1st floor ❑2nd floor Width:_ Sq.footage 2nd floor: Size: ❑1st floor ❑2nd floor Sq.footage 3rd floor-__- Difference between existing grade and proposed finish rade: North _ South East -_ West Height of ridge above final finish grade: North /J1�-___ South East - West Additional Remarks REVISIONS' 1.East Elevation Historic Name: (describe) 2.South Elevation / � �k�- Original Dale: C - 3.West Elevation G L`k ,S 9 T. SAbect-a�6.R Original Builder: N't'.L� 4.North Elevation Is there an HDC survey form for this building attached? ....Yes N/A 'Cloud on drawings and submit photographs of existing elevations. 1-)D DETAIL OF WORK TO BE PERFORMED Foundation: Height xp ed Li Block LI Block Parged I_1 Brick(type) __-_-_-._ ❑Poured Concrete ❑Piers Masonry Chimney: ❑Block Purged ❑Brick(type) ❑Other Roof Pitch: Main Mass- /12 Mass - 112_ -_- Dormer /12 _ Other Roofing material: ❑Asphalt: 0 3-Tab ❑Architectural Fence: Height:___._ ❑Wood (Type: , .,;,,,,,. ter,White Cedar,Shakes,etc.). _.- _ Type: Length: Skylights(flat only) Manufacturer Rough Opening Size -- Location__ Manufacturer Rough Opening._ Size Location_ Gutters: U Wood IJ Aluminum ❑Copper ❑Leaders(material)___ _ Leaders(material and size): -- Sidewall:Li White cedar shingles __ ❑Clapboard(exposure: _ inches) Front❑ - Side❑ ❑Other Trim: A.Wood ❑Pine ❑Redwood ❑Cedar ❑Other — - _ --- B.Treatment ❑Paint ❑Natural to weather ❑Other —_-_ ___ C.Dimensions: Fascia—____. Rake Soffit(Overhang) - Corner boards Frieze Window Casing _ Door Frame _ Columns/Posts:Round Square Windows': ❑Double Hung ❑Casem _- _ -_ - --- ❑True Divided Lights(muntir lated Divided Lights) Manufacturer Doors'(type and material): ❑TDL __Rear - Side Garage Door(s): Type_- 1471 _. Material ___ _._ shoreline Hardscape materials: Driveway _ Walkways ____Walls 'Note: Complete door and window schedules are required. S2114R Sidewall A3 -- Clapboard�(if`applicable)_- " keT___ Roof -- — Trim _ Sash W t't ITS - - - Doors_ lh T C,.ZE: A 1------- Deck Foundation_A_L--yc2 _. _-_ Fence - -_ Shutters 6s5z-L 1, -Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and comply with the terms and con...'• s of this application.I hereby agree that the submission of any revise9 ns to this application will initiate a new sixty-day review period. Date Y r-.'J - Signature of owner of record _ __.____.__ . ...- -- ' Signed under penalties 01 perjury CERTIFICATE NO: _\ Z WV DATE ISSUED: /0._ Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970,for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ FO OFFIC USE ONLY from the approved application.Violation may impede issuance of Certificate of Occupancy. PROPERTY DESCRIPTION SCI *f__ Fee Paid:$ !- Date application received: TAX MAP N°: L1233 PARCEL N°. 9 Z Must be acted on by: Street&Number of Proposed Work: I(o \1c51:.\ ,S . Extended to: _ , Approved: Disapproved: . Owner of record: Nit a c.\ �Je-, Chairman: � A-Cf-1 Mailing Address: 311 ‘1,...,—. �.1\ 9—) Facrcrtl r LT iX,t3Vt Member: Member: Contact Phone#:„9.):3_33...1 U77...1 E-mail: rhe:0e..,e..,010.1. +t.cd•� Member:_ AGENT INFORMATION(if applicable) A1 Member: Narne:-_ licwucl Akoi�. Notes-Comments-Restrictions-Conditions Mailing Address: 2, AAL 61-. 1�1...,,Av,kc l- ,AAA o2..5sq Contact Phone#:_Doi`, Pa. 2050 E-mail: 4.4.: ',(2CoMe,s4-•vc.1- DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. LI New Dwelling ❑Addition ❑Garage ❑Driveway/Apron ❑Commercial ❑Historical Renovation ❑Deck/Patio ❑Steps ❑Shed 'Color Change ❑Fence ❑Gate ❑Hardscaping ❑Move Building ❑Demolition ❑Revisions to previous Cert.No. ❑Pool(Zoning District ) ❑Roof ❑ Other___ Size of Structure or Addition: Length: Sq.Footage 1st floor: Decks/Patio: Size: ❑1st floor ❑2nd floor Width: Sq.footage 2nd floor: _ Size: ❑1st floor 0 2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade: North South ___ East West Height of ridge above final finish grade: North— -_ South East West Additional Remarks REVISIONS' 1.East Elevation Historic Name: (describe) 2.South Elevation Original Date: 3.West Elevation Original Builder: 4.North Elevation Is there an HDC survey form for this building attached? ❑Yes ❑N/A 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed ❑Block ❑Block Parged U Brick(type) ❑Poured Concrete ❑Piers Masonry Chimney: ❑Block Parged Cl Brick(type) ❑Other Roof Pitch: Main Mass /12 Secondary Mass_ /12_ Dormer /12 Other (looting material: LI Asphalt: ❑3-Tab ❑Architectural Fence: Height: ❑Wood (Type: Red Cedar,White Cedar,Shakes,etc.) Type:. Length: Skylights(flat only): Manufacturer Rough Opening Size_ _ Location_ Manufacturer _Rough Opening Size Location Cutters: ❑Wood LI Aluminum ❑Copper ❑Leaders(material) -- Leaders(material and size): Sidewall:❑White cedar shingles ❑Clapboard(exposure:_.-- inches) Front❑ Side❑ ❑Other Trim:A.Wood ❑Pine ❑Redwood ❑Cedar ❑Other B.Treatment ❑Paint ❑Natural to weather ❑Other C.Dimensions: Fascia Rake Soffit(Overhang) Corner boards Frieze Window Casing Door Frame Columns/Posts:Round Square Windows': ❑Double Hung ❑Casement ❑All Wood ❑Other - - ❑True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer Doors'(type and material): ❑TDL ❑SDL Front _Rear Side Garage Door(s): Type Material - Hardscapo materials: Driveways Walkways Walls 'Note: Complete door and window schedules are required. COLORS Sidewall ._ Clapboard(if applicable) ___ Roof Trim - 64"/ - Sash /4,--4,-0...-k"-u-t^*-t- (--c' Doors t"--1,,,k - N�..•61-. `(A5 Deck Foundation Fence Shutters 'Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and comply wi e terms and conditions of this application.I hereby agree that the submission of any revisions to this application will initiate a new sixty-day review period. ,l. Date t_ 1b_\\3._._ ._ _ ..- Signature of owner of record _ ___- Signed under penalties of perjury I CERTIFICATE NO: �9 OS-3- DATE ISSUED: -111(/ - . Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It Is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass..1970,for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ from the approved application.Violation may impede issuance of Certificate of FOR OFFICE USE ONLY Occupancy. PROPERTY DESCRIPTION I I 4 Date application received: 3 d 3 Fee Paid:S TAX MAP N°: 2 3 2 PARCEL N°. /117 Must be acted on by: ' 3hh / 13 . Street&Number of Proposed Work:,l i `t 4%0 17 S% Extended to:__ Owner of record: O 4.4447 C 4.4 .G N Approved: ✓ Disapproved: Mailing Address: i. A4 C - Chairman: UVv1 �\ _0■G-N 4 er4A, Member: Member: Contact Phone if: E-mail: AGENT INFORMATION(if applicable) Member: _ Member: Name: -- 14t5 L%a0/2. 1- ���� Notes-Comments-Restrictions-Conditions Mailing Address: y7 ri'i r-teoe �Jel- Contact Phone I: 2-120/ /3 5) .E-mail: —- DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. Li New Dwelling ❑Addition ❑Garage ❑Driveway/Apron ❑Commercial ❑Historical Renovation ❑Deck/Patio ❑Steps ❑Shed L I Color Change ❑Fence ❑.G ❑Heaping ❑Move Building I Demolition ❑Revisions to previous Cert.No._ ❑Pool(Zoning District ) i Ufrdither _ .6..-, s • /-•.. �.:�-' -=rte.e Size of Structure or Addition: Length:- _ Sq.Footage 1st floor: _- Decks/Patio: Size: ❑1st floor ❑2nd floor Width: Sq.footage 2nd floor: Size: ❑1st floor ❑2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade: North South East West Height of ridge above final finish grade: North South East West Additional Remarks REVISIONS' 1.East Elevation Historic Name: (describe) 2.South Elevation Original Date: l itro 3.West Elevation Original Builder: 4.North Elevation Is there an HDC survey form for this building attached? Yes ❑N/A 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed ❑Block ❑Block Parged O Brick(type) L i Poured Concrete ❑Piers Masonry Chimney: ❑Block Purged ❑Brick(type) ❑Other _ Roof Pitch: Main Mass /12 Secondary Mass /12 Dormer- /12 . Other Roofing material: ❑Asph ❑3-Tab ❑Architectural Fence: Height: C (Type: • ,:ar,White Cedar,Shakes,etc.)/te.o/���'e�J� "`— Type: /'r^'� �/� Length: - Skylights(flat only): Manufacturer 71111111V Rough Opening ' Size Location Manufacturer Rough Opening Size Location_ Gutters: 0 Wood ❑Aluminum O Copper ❑Leaders(material) • Leaders(material and size): - -. Sidewall: El White cedar shingles _ __ ❑Clapboard(exposure:_ _ inches) Front❑ Side❑ L)Other Trim: A.Wood O Pine ❑Redwood ❑Cedar O Other B.Treatment 0 Paint ❑Natural to weather ❑Other C.Dimensions: Fascia Rake Soffit'(Overhang) Corner boards Frieze Window Casing Door Frame Columns/Posts:Round_Square Windows': r iI Double Hung ❑Casement ❑All Wood ❑Other - L i True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer Doors'(type and material): ❑TDL ❑SDL Front Rear Side Garage Door(s): Type Material - Hardscapematerials: Driveways :Walkways Walls •Note: Complete door and window schedules are required. . COLORS Sidewall _ - . Clapboard(if applicable) Roof - - Trim_ Sash Doors -_- -_—__-- Deck __ Foundation Fence _._ — Shutters_. •Attach manufacturer's color samples if color is not from HDC approval list. _ I hereby authorize the agent named above to act on my behalf to make changes in the specif Lions or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and comply with t terms and conditions of this application.I hereby agree that the submission of any revisions this piication will initiate a new sixty-day review period. • Date fig_ / Signature of owner of record --- ___ _._.-_-.__-._._.._-___----.-.-..-__-- Signed under penalties of perjury r CERTIFICATE NO: c-9()S-70 DATE ISSUED: - (3 Application the HISTORIC DISTR CERTIFICATEI OF APPROPRIATENESSacnusens,for a for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass..1970.for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ FOR OFFICE USE ONLY from the approved application.Violation may impede issuance of Certificate of Occupancy. PROPERTY DESCRIPTION Date application received: 1 102.X)i_3 Fee Paid:$ TAX MAP N°: 5 4- PARCEL N°._ 51 — Must be acted on by: �.'�4�13 Street 8 Number of Proposed Work:-t V (, 1�- - - Extended t0: . _WOW i Approved: _ Disapproved: )._ Owner of record:—�"tom."`_`°`_ 3 -- -- �� Chairman:_ 'L �/. L Mailing Address: 3vJ��y�l'.f tf'4 �9' �y��//-�� Lit����� A !R-/� -- -- Member: . -- _— _ -: Or Member. _ Contact Phone l r 131_V2t�J -t mail: — --- Member: AGENT INFORMATION(if applicable) ` � I` Member.__- Namo: -- �Lt�L ----------. 3D61- Notes-Comments-Restrictions-Conditions Mailing Address: _ -- IL..'. Contact Phone A v i E-mail: DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. ❑New Dwelling Li Addition ❑Garage ❑Driveway/Apron ❑Commercial Li Historical Renovation ❑Deck/Patio ❑Steps ❑Shed ❑Color Change Sri Fences ❑Gate ❑Hardscaping ❑Move Building ❑Demolition ❑Revisions to previous Cert.No. ❑Pool(Zoning District_ ) ❑Roof ❑ Other _ --- - Size of Structure or Addition: Length: Sq.Footage 1st floor: Decks/Patio: Size: L 1st floor ❑2nd floor Width:_ Sq.footage 2nd floor: Size: _ ❑1st floor ❑2nd floor Sq.footage 3rd floor:_—_ Difference between existing grade and proposed finish grade: North South _- East _ ___ West Height of ridge above final finish grade: North South. East West - -. Additional Remarks Gfi35(11�) REVISIONS' 1.East Elevation Historic Name: r∎OL f it136e(14,�t.�`iy off' (describe) 2.South Elevation ,/ Original Date: ��,O'L \t (.50 ii TjTIM- j 1!-p4iT 3.West Elevation / � Original Builder: I' r .� 4.North Elevation �I�y D y` a? Is there an HDC survey form for this building attached? r_.Yes ^N/A l- ' 'Cloud on drawings d submit photographs of existing 6Ievations. DETAIL OF WORK TO BE PERFORMED _ Foundation: Height Exposed_ J Block LI Block Parged Li Brick(type) _ Li Poured Concrete ❑Piers Masonry Chimney: I_I Block liarged ❑Brick(type) - ❑Other Roof Pitch Main Mass- /12 Secondary Mass—.._-/12 Dormer /12_ Other_ Rooting material: Li Asphalt: 0 3-Tab 0 Architectural Fence: Height:_ ❑Wood (Type: Red Cedar,White Cedar,Shakes.etc.)- -- Type: Length: Skylights(flat only): Manufacturer Rough Opening Size _ Location Manufacturer _Rough Opening- Size— Location Gutters: L 1 Wood LI Aluminum ❑Copper ❑Leaders(material) - — Leaders(material and size): _ — .- Sidewall: U White cedar shingles _ _ ❑Clapboard(exposure: inches) Front❑ Side❑ ❑Other ------ -- ------ - Trim:A.Wood Opine ❑Redwood ❑Cedar ❑Other__—___ -- -- --- ' B.Treatment ❑Paint ❑Natural to weather ❑Other — --- C.Dimensions: Fascia Rake Soffit(Overhang) -_ Corner boards _ Frieze Window Casing._— Door Frame__--_ _ Columns/Posts:Round _--Square Windows': ❑Double Hung Ll Casement ❑All Wood ❑Other --- i True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer Doors'(type and material): ❑TDL ❑SDL Front _- Rear _ _ Side Garage Door(s): Type_ _ Material — Hardscape materials: Driveways __ Walkways ._-_..___Walls •Note: Complete door and window schedules are required. COLORS Sidewall Clapboard(if applicable) _ Roof— — Doors— ----- Trim ___ Sash__.__---- - - - — - Deck__ ___ _—__ Foundation Fence CC0,.r,+P, OiltlI Shutters •Attach manufacturer's color samples if color is not from HDC approval list. U i vw' PiOa J)c, 1,4in I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans contained in this application in order to bring the applica- WI tion into compliance with the HDC guidelines.I hereby agree to abide by and c ply with the terms and conditions of this application.I hereby agree that the submission of any revisi nsto this application will initiate a new sixty-day review period. Date Signature of owner of r rd ___ Signed under penalties of perjury CERTIFICATE NO:_ -DJ DATE ISSUED: _/P- y/ Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970.for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ FOR OFFICE USE ONLY f l 1(e�� from the approved application.Violation may impede issuance of Certificate of Occupancy. PROPERTY DESCRIPTION Date application received: /pi/3 Fee Paid:$07,5-"O'1/43 TAX MAP N°: PARCEL NN°.__ /4 Must be acted on by: o9h-tn/,3 Street&Num of Proposed Work�ii'L� t 'f ite_ �r-u- — Extended to:- - _ y Approved:-1 Disapprove, Owner of record; � L`� ./ — /�,, � (\ ,�� ! Chairman: /L/�— !/ t p`4-1-1\.. -. Mailing Address:_4(2/_ p28 a/eo s /704 /4221. /r c —lnA.(YL 3 Member: ' �� i Contact Pho r_ g c2//?2I E.maii:67G41fX714Q,g....- --- C, AGENT INFORMATIR A "1 NCO Member:4L$ r I ti - - ,Membe ? Name: '/ -� >��� G���Z �w /r� Notes-,• i = is-Wrictions-Conditions Mailing Address:�j �1-._ �Ot iA.- Contact Phone#. -_.E-mail. DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. Li New Dwelling ❑Addition ❑Garage LI Driveway/Apron +p Commercial ❑Historical Renovation ❑Deck/Patio El Steps ❑Shed ❑Color Change ❑Fence ❑Gate ❑Hardscaping 7 M ve 8/uilding ❑Demolition ❑Revisions to previous Cert.No. U Pool(Zoning District—_) ❑Roof I Other_-(z �a ' i -'' _ — — Size of Structure or Addition: Length: / Sq.Footage 1st floor:_ aecks/Patio:/Size: _❑1st floor ❑2nd floor Width: Sq.footage 2nd floor: Size: ... ❑1st floor ❑2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade: North __ South _ -— East - _ West Height of ridge above final finish grade: North _-L_ /! — th ���^ East /� West - Additional Remarks(��jl���y�,,J '., �/�/�j D 9?��7Z' `�(�'�/(/�+��'�I�'l 0 f""`�' '-it j3E ISION t.East Eleva[ion Historic Name: Original Date: (describe) 2.South Elevation 3.West Elevation Original Builder: 4.North Elevation Is there an HDC survey form for this building attached? `._Yes _-.NIA 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED ,f Li iJ poured Concrete L i Piers Foundation: Height Ex sect/(/ -_- �J Block �Block Parged ❑Brick(type)_ - — Masonry Chimney: t urged L Brick(type) ❑Other Roof Pitch: Main Mas/i4-/12 __ Secondary Mass /12 Dormer /12 Other Roofing material: LU It: L,3-Tab L✓Architectural Fence: Height: 1 4. (Type: Red Cedar,White Cedar,Shakes.etc.) Type: Length: Skylights(flat only): Manufactur7//.. Rough Opening Size Location Manufacturer ,` -_Rough Opening --._ Size Location Gutters: -. li..4.. ❑Aluminum ❑Copper ❑Leaders(material) Leaders(mat. ial and size):0 — — Sidewall: ❑Whit . nirgles ❑Clapboard(exposure:_ inches) Front❑ Side❑ ❑Other /�r — Trim: A.yfo/d// ❑Pine ❑Redwood ❑Cedar El Other ---- B./TIr/eafr M ❑Paint ❑Natural to weather ❑Other .- C.Dimensions: Fascia Rake Soffit(Overhang) _ Corner boards Frieze ___ Window Casing _ Door Frame Columns/Posts:Round Square Windows': L]y� L Tru ung ❑Casement ❑All Wood ❑Other ded Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer Doors'()V 2f,material): L7 TDL ❑SDL Front Rear Side_ Garage /r(ts): Type Material -- Hardscape materials: /j7 Driveways _____ Walkways. Walls - t Note: Complete door and window schedules are required. COLORS Sidewall Clapboard(if applicable) -. Roof — Trim Sash Doors Deck Foundation _._. - Fence_.,. Shutters_ — Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and comply with I t-, s and conditions of this application.I hereby agree that the submission of any revision S�to th/is application will initiate a new sixty-day review period. / .��sa Date /.yJ/3,//�.,. - _ _ Signature of owner of record e ".- _- Signed under penalties of perjury CERTIFICATE NO: ? OS DATE ISSUED: !I /( Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. Acts and This is a Resolves cofnMass,1970 agreement proposed filled out in ink.An herein application on plans.drawings made for issuance of a Certificate of and photographs accompanying this app)application and made a partrhereoff by the The certificate is valid for three years from date of issuance.No structure may differ FOR OFFICE USE ONLY 9 ad rJ from the approved application.Violation may impede issuance of Certificate of 3 Occupancy. PROPERTY DESCRIPTION Date application received: Fee'� - Fee Paid:$o%_p'c_, TAX MAP N`:_ L - _ PARCEL N . * - _ Must be acted on by: n?/-b113 - p ./ $ 0,dy- Extended to: -_-_ Street&Number of Proposed Work: /X t�xf--� - j. ige,c f,e___e fa--0- Approved: - -._ Di oved� - Owner of record: Lz�tc��f� ►�,�/y -- n Chairman: / - �' Mailing Address:_o g` ---- . - Member: / -�� _ Member: Contact Phone#�Q� 4ek-',0� 37/_E-mailA.Cte S/i - - - -.- r� ,,,5��,&. /t.99bo �DRyr460/./ Member: AGENT INFORMATION Of applicable-) 1...4\0.- =_ Member: 1'tt r y L Name:_ SA-1, C L t " ., Ntes-Commen -Restrictions-Conditions Mailing Address:. ,.. .,4-7/.10.A t0. S f Contact Phone#: E-mail DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. U New Dwelling U Addition ❑Garage L Driveway/Apron Commercial Li Historical Renovation Deck/Patio ❑Steps ❑Shed Li Color Change D Fence D Gate ❑Hardscaping Li Move riding .�:i]Depm�olition 0 Revisions to previous Cert.No. L7 Pool(Zoning District _) D Roof l+ Other FC,/AFRi_�'Celi'll26±i G/�cr Size of Structure or Addition: Length:_ ier Sq.Footage 1st floor:_/-t-a` Decks/Patio: Size:._4 ❑1st floor D 2nd floor Width: /Z _ Sq.footage 2nd floor: Size: 1"//h ❑1st floor ❑2nd floor Sq.footage 3rd floor: 1 /4- _ South East West Difference between existing grade and proposed finish grade: North. qi►+// -- /' Sou West Height of ridge above final finish grade: N-orth t��f�,Z� � d..�n � East ,'/ /w/•� ) Additional Remarks 'MOD / -#10//v¢ /v es f /71-4C"r� l"1 bt hi 1 8t40/( COLO/\ REVISIO S' 1.East Elevation Historic Name: (describe) 2.South Elevation Original Date: 3.West Elevation Original Builder: 4.North Elevation Is there an HDC survey form for this building attached? Yes ._N/A 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED Brick(type)Height Exposed.�`� �0 ❑Block Parged r yPe) ❑Poured Concrete [ :Piers--- - Masonry Chimney: u1.y/[`�r��r���c Parged ❑Brick(type)_ _ _ __ Li Other Roof Pitch: Main Masi. /12___-Secondary Mass ._ /12___ _ Dormer- /12_ _ Other__ - _-_ _ - Roofing material [��'A/y�,�pt 0 3-Tab 0 Architectural Fence: Height L.. 4d (Type: Red Cedar,White Cedar,Shakes,etc.)- Type: / 1 Length: -- 1 Skylights(flat only): MaJQ l 9tt/y�er !Tor Rough Opening_ ___- Size Location_____ _- Manufd c er _. .__Rough Opening_.- Size Location_ -- Gutters: L 4- I 0 Aluminum, 0 Copper ❑Leaders(material) _- -- - - - Leaders(material and size): - -- --- ----- - ---- ----- - _-- ------ - --- ❑Clapboard(exposure: _ inches) Front 0 __Side❑_ Sidewall: D White cedar gI - - ❑Other „(/ -- — Trim: A.'%�( ❑Pine ❑Redwood ❑Cedar ❑Other - - - B.Tre t ❑Paint El Natural to weather ❑Other—_-_----- ----- — - - C.Dimensions: Fascia _____ Rake_ _ Soffit(Overhang) Corner boards ._ ___ Frieze_ _ _- t/ Window Casing - Door Frame -_ - Columns/Posts:Round_--_Square Windows': Uy to ung L]Casement ❑All Wood D Other I.1 T/ru r ded Lights(muntins),single pane L SDL's(Simulated Divided Lights) Manufacturer Doors'(type Rear Side erial): ❑TDL DSDL Front__-_-_ _ -- Garage Doo(s): Type __ _ ___ Material _ --- Hardscape materials:// Driveways .. -__- Walkways -___ -_Walls _ •Note: Complete door d ndow schedules are required. COLORS dG4.61� Sidewall_._ Clapboard(it applicable) ._ Roof Trim __ _ Sash- --. Doors_ Deck Foundation__.. -. Fence Shutter, _ •Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans contained in this application in order to bring the applica- lion into compliance with the HDC guidelines.I hereby agree to abide by and comply th he -r and conditions of this application.I hereby agree that the submission of any revisions to this application will initiate a new sixty-day review period. Rate /A//0106. Signature of owner of record - 1. / /' liel- Signed under penalties of pertury CERTIFICATE NO: SLR?_/ DATE ISSUED: l/�y/i Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970.for proposed work as described herein and on plans,.drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ from the approved application.Violation may impede issuance of Certificate Of FOR OFFICE USE ONLY cu cy. PROPERTY DESCRIPTION Date application received: 11 -1 1 Fee Paid:$aS•Oa AX MAP N°' SSL�� PARC L N`. Must be acted on by: ?t'I i 3 eel 8 Number of Proposed Work: Extended to: ner of record: _..: _ C- Approved: A O�Disappro • Chairman: f�'�/VL�L C-----'--.N. • Address: I �i�'��ti�� L�/i[`�— / �ATETI .4�7 ' Member: �(1 �r` I Ii/ tact Phone rte:�1Tieli-/• ethail: Membe. i t al. .1, , •.�.i L�l 5.� AGENT INFORMATION(If applicable) Member: MilIllM Member: l 4/44-- ( 24'I3 Name: _ Notes-Corn : is--estrictions-Conditions Mailing Address: / a /f e• Contact Phone;r: 4 b 325-6.965E mail. _ - — jed LT/11. DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. H New Dwelling ❑Addition ❑Garage ❑Driveway/Apron ❑Commercial ❑Historical Renovation ❑Deck/Patio ❑Steps ❑Shed L]Color Change ❑Fence ❑Gate ❑Hardscapin ❑Move Build' g y0�yD(e�molit'io�ry{� Revisions to previous Cert.No. -_ L]Pool(Zoning District-_) ' ioof ❑ Other re /? /e- 'i a 3 -� wfi•th, previous C -- Size of Structure or Addition: Length: Sq.Footage st floor: Decks/Patio: Size: LI 1st floor ❑2nd floor Width: Sq.footage 2nd floor: Size: Li 1st floor ❑2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade: North South East West Height of ridge above final finish grade: North South East West _ Additional Remarks REVISIONS' 1.East Elevation Historic Name: 2. Date: (describe) .South Elevation 3.West Elevation Original Builder: 4.North Elevation Is there an HDC survey form for this building attached? ❑Yes ❑N/A 'Cloud on drawings and submit photographs of existing elevations. .1' DETAIL OF WORK TO BE PERFORMED Foundation: Height Exposed ❑Block ❑Block Parged ❑Brick(type) ❑Poured Concrete ❑Piers Masonry Chimney: Li Block P•arged ❑Brick(type) ❑Other _ - Roof Pitch: Main Mass..__/12___ Secondary Mass /12 /12 Other _ Roof in4_materitVl! (gAsphalt: -Tab it Fence: Height: ❑Wood (Type: hite Cedar,Shakes,etc.) 1 1! .-N;(j Type: - Length: Skylights(flat only): Manufacturer Rough Opening Size_ Location Manufacturer Rough Opening _ Size Location Gutters: ❑Wood ❑Aluminum ❑Copper ❑Leaders(material) Leaders(material and size): Sidewall:❑White cedar shingles_ ❑Clapboard(exposure: inches) Front❑ Side n ❑Other — Trim:A.Wood ❑Pine ❑Redwood ❑Cedar ❑Other - — B.Treatment ❑Paint ❑Natural to weather ❑Other C.Dimensions: Fascia Rake Soffit(Overhang) Corner boards Frieze Window Casing Door Frame Columns/Posts:Round Square Windows': ❑Double Hung ❑Casement ❑All Wood 0 Other —. - ---- - ❑True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer ___ __ Doors'(type and material): ❑TDL ❑SDL Front Rear Side _ Garage Door(s): Type Material —_-- -- -- Hardscape materials: Driveways Walkways. Walls •Note: Complete door and window schedules are required. s . Sidewall Clapboard(if applicable) ifteuriLpti A-L 3L.. `- Trim Sash Doors -- Deck Foundation____ Fence ____ Shutters _ — 'Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the 5.rcificatio.s or the pl. b contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and comp, /- the t�� .••/• •, .ns of this application.I hereby agree that the submission of zany revisions 1to is plication will initiate a new sixty-day review period. �oq7 Signature of owner of record �.-�/ • Date- ___- r _ __.._ Signed under penalties of perjury I CERTIFICATE NO: �q bl D DATE ISSUED: f/!7-y/1612 Application to the HISTORIC DISTRICT COMMISSION,Nantucket.Massachusetts,for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:It is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket In Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970,for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ from the approved application.Violation may impede issuance of Certificate of 1 I?I i? FOR r FICE A E 0 LY �O Occupancy. PROPERTY DESCRIPTION Date application rtec(eiveltl:_ XIS fLl'..4 4 4 Fee Paid:$ TAX MAP N°: /6 PARCEL N°. [41 ' (9Ae flat.' Must be acted on by: I I' ?I a-(O,13 Street 8 Number of Proposed Work: S I�1A ,fL elptb Extended to: Owner of record: LJAOJTOGYOT GON4pLMt Wad; APProved: ,' /',�, ved: Mailing Address: i W(tt,JI . �P... % Chairman:z/I1��.wa ,� IJA ,a I MA OZcs.} Member: !ai_ _ • —. Contact Phone#: 7 ' WM E-mail/ 1 10 a r..fir w t t!•6.1t, Membe.I;li,f r—' I�'A''!'- AGENT INFORMATION(if applicable) Membe� _• �� Member: \IIBI����'-'', JI Name: Notes-Comme ,`Restrictions- . •itions Mailing Address. A 4...4 ' %!2 1000.0 Contact Phone#: E-mail. If DESCRIPTION OF WORK TO BE PERFORMED See reverse for required documentation. ❑New Dwelling ❑Addition 0 Garage ❑Driveway/Apron VI Commercial ❑Historical Renovation 0 Deck/Patio ❑Steps ❑Shed O Color Change 0 Fence O Gate ❑Hardscaping O Move Building ❑Demolition 0 Revisions to previous Cert.No. O Pool(Zoning District ) O Roof O Other Size of Structure or Addition: Length: MO r Sq.Footage 1st floor: SDCb Decks/Patio: Size: ❑1st floor ❑2nd floor Width: 5!1 Sq.footage 2nd floor: Size: O 1st floor O 2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish gsadeir North " South East g— -- West — •Height of ridge above final finish grade: North 21.'1 South �•` East 21 2 West 2A-7' ' Additional Remarks REVISIONS' 1.East Elevation Historic Name: Original Date: (describe) 2.South Elevation 3.West Elevation Original Builder: ' 4.North Elevation ' Is there an HDC survey form for this building attached? ❑Yes -N/A 'Cloud on drawings and submit photographs of existing elevations. q DETAIL OF WORK TO BE PERFORMED ,., Foundation: Height Exposed t� ry� ❑Block ❑Block Parged 0 Brick(type) -- K Poured Concrete ❑Piers ' Masonry Chimney: U Block Purged ❑Brick(type) ❑Other _ - Roof Pitch: Main Mass:2- /12 _Secondary Mass_ _ /12_ Dormer /12 Other Roofing material: LI Asphalt: U3-Tab Li Architectural IX a -1?-Z 147r#A-1- Fence: Height: ' ❑Wood (Type: Red Cedar,White Cedar,Shakes,etc.) Type:_ Length: Skylights(flat only): Manufacturer Rough Opening Size Location ' Manufacturer Rough Opening Size Location Gutters: 1....Wood ❑Aluminum ❑Copper 0 Leaders(material) Leaders(material and size): Sidewall:❑White cedar shingles ❑Clapboard(exposure: __inches) Front❑ Side 0 CR Other MErrAL Trim:A.Wood O Pine 0 Redwood ❑Cedar ❑Other B.Treatment 0 Paint 0 Natural to weather 0 Other C.Dimensions: Fascia Rake Soffit(Overhang) Corner boards Frieze Window Casing Door Frame Columns/Posts:Round Square Windows': O Double Hung ❑Casement ❑All Wood kpOther 'SL10113 ' J True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer { Doors'(type and material): Front METAL `ova L.kit Rear McTIt.? PNrr 444/6 Side 1A.71TL. 005 k1 III Garage Door(s): Type D �4 J.tjl Material ft 3'1-A�• G Hardscape materials: Driveways _ - - Walkways Walls_ •Note: Complete door and window schedules are required. --------- -C ---- Sidewall �1A 4/41 Clapboard(if applicable)OLORS _ Roof Trim Sash tl�(1frF Doors Z LC — —-__---- Deck Foundation IIfiflj - Fence _utters_ -- •Attach manulacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or the plans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and compl ith the terms and conditions of this application.I hereby agree that the submission of any revisions to this application will initiate a new sixty-day review period. r Date J(2JL • ZUl Z _ Signature of owner of record —- G� r Signed under penalties of perjury DATE ISSUED: /I L/ 3 CERTIFICATE NO: -�- ei 0 (° Application to the HISTORIC DISTRICT COMMISSION,Nantucket,Massachusetts.for a CERTIFICATE OF APPROPRIATENESS for structural work. All blanks must be filled in using BLUE OR BLACK INK(no pencil)or marked N/A. NOTE:II is strongly recommended that the applicant be familiar with the HDC guidelines,Building with Nantucket in Mind,prior to submittal of application. Please see other side for submittal requirements.Incomplete applications will not be reviewed by the HDC. This is a contractual agreement and must be filled out in ink.An application is hereby made for issuance of a Certificate of Appropriateness under Chapter 395 of the Acts and Resolves of Mass.,1970,for proposed work as described herein and on plans,drawings and photographs accompanying this application and made a part hereof by reference. The certificate is valid for three years from date of issuance.No structure may differ FOR OFFICE USE ONLY from the approved application.Violation may impede issuance of Certificate of Occupancy. Date application received: 1 I 3-'i 3 Fee Paid:$ S•�'v PROPERTY DESCRIPTION TAX MAP N°: -Si . 44/ fit,,I 1 PARCEL N°. Y Must be acted on by: �� �/ Extended to: `- Street&Number of Proposed Work: �-� �� v � �igapproved: Approved: � /l.`` Owner of record: __, ./262..,214g�- /a�✓,v-v� WW./„..1' ' ....111 L,'. �f A Chairman: Mailing Address:.9__,-;.i l� - Member: .�4��.�-i!� _fa1a�., / f / iW9 d�•15� vs �1 G. Member: _!Ei1 All I.1 Contact Phone#:e0/I ,T✓!o r��_E-mail: Member: \ I AGENT INFORMATION(if applicable) Member: v Name: =i - > ��-› Notes-Comments-Restrictions-Conditions Mailing Address: ��k% 33G.3 Contact Phone#:6'1 6•f/. . E-mail: R -',--', f'r--j'�!/T DESCRIPTION OF WORK TO BE PERFORMED See reverse for require documentation. ❑New Dwelling ❑Addition ❑Garage ❑Driveway/Apron ❑c m rcial ❑Historical Renovation Li Deck/Patio ❑Steps ❑Shed 41 ❑Color Change ❑Fence - ❑Gate ❑Hardscaping Move BuiJdi Demolition ❑Revisions to previous Cert.No. ❑Pool(Zoning District_) ❑Roof ❑ Other— ll Size of Structure or Addition: Length: Sq.Footage 1st floor: AF?::7 t S Decks/Patio: Size: ❑1st floor ❑2nd floor Width: _ Sq.footage 2nd floor: Size: ❑1st floor ❑2nd floor Sq.footage 3rd floor: Difference between existing grade and proposed finish grade: North -- South East West Height of ridge above final finish grade: North _ South East Additional Remarks REVISIONS' 1.East Elevation Historic Name: 2.South Elevation (describe) Original Date: 3.West Elevation Original Builder: Z1/,26-•=s /7 --) �/ 4.North Elevation Is there an HDC survey form for this building attached? ❑Yes 'N N/A 'Cloud on drawings and submit photographs of existing elevations. DETAIL OF WORK TO BE PERFORMED ❑poured Concrete ❑Piers Foundation: Height Exposed_ ❑Block ❑Block Parged ❑Brick(type) Masonry Chimney: ❑Block Parged Ll Brick(type) ❑Other — Roof Pitch: Main Mass- /12 Secondary Mass /12 Dormer /12 Other Roofing material: 0 Asphalt: ❑3•Tab 0 Architectural Fence: Height: ❑Wood (Type: Red Cedar,White Cedar,Shakes,etc.) Type: Length: Opening Skylights(flat only): Manufacturer Rough--.- 9 P 9 Size Location ' Manufacturer Rough Opening Size Location Gutters: 0 Wood Cl Aluminum ❑Copper ❑Leaders(material) Leaders(material and size):_ — ' Sidewall:0 White cedar shingles ❑Clapboard(exposure: inches) Front❑ Side❑ ❑Other Trim:A.Wood ❑Pine ❑Redwood ❑Cedar ❑Other B.Treatment ❑Paint ❑Natural to weather ❑Other C.Dimensions: Fascia Rake Soffit(Overhang) Corner boards Frieze Window Casing_ Door Frame Columns/Posts:Round_Square Windows': ❑Double Hung ❑Casement ❑All Wood Li Other ❑True Divided Lights(muntins),single pane ❑SDL's(Simulated Divided Lights) Manufacturer - Doors'(type and material): ❑TDL ❑SDL Front_ - Rear Side Garage Door(s): Type Material Hardscape materials: Driveways Walkways Walls •Note: Complete door and window schedules are required. COLORS Sidewall_ Clapboard----- Clapboard(if applicable)_._ _- - -- Roof Sash_ __ _ Doors Trim __ Fence _ Shutters Deck Foundation -- •Attach manufacturer's color samples if color is not from HDC approval list. I hereby authorize the agent named above to act on my behalf to make changes in the specifications or.he fans contained in this application in order to bring the applica- tion into compliance with the HDC guidelines.I hereby agree to abide by and comply wit the terms �d c ditions of this application.I hereby agree that the submission of any revisions to this application will initiate a new sixty-day review period. / �� Signed under penalties of perjury A /Z Signature of owner of record„' • --- ' Date_/7_�' -