HomeMy WebLinkAboutZA-28-14 42 Union Street, LLCTOWN OF NANTUCKET
BOARD OF APPEALS
NANTUCKET, MA 02554
MEMORANDUM
RECEIVED
?015 J�:id 8 M 12
j .;ELI
Date: January 8, 2015
To: Town Clerk
From: Eleanor Weller Antonietti, Zoning Administrator
Re: Zoning Administrator Decision #028 -14 — TECHNICAL CORRECTION
The above referenced ZONING ADMINISTRATOR Decision regarding 42 Union Street and issued
to 42 UNION STREET, LLC, was filed with the Town Clerk on December 24, 2014. Paragraph 5 on
Page 3 of the Decision requires modification to reflect a technical correction thereto. This technical
correction is limited to the insertion of a condition pertaining to a seasonal prohibition on
construction.
A corrected Page 3 of said decision is filed herewith. This minor modification will neither effect the
content of the relief contained in the decision nor the appeal period. Please attach this document to the
existing Decision so that it may be recorded in its entirety. Thank you.
Eleanor W. Antonietti,
Zoning Administrator
COMMONWEALTH OF MASSACHUSETTS
Nantucket, ss
On the � day of a , 2015, before me, the undersigned notary public, personally appeared
64 p1q.o 2 VJ . A n+e A i ?-4+-i , the above -named Zoning Administrator of Nantucket,
Massachusetts, personally known to me to be the person whose name is signed on the preceding document, and
acknowledged that she signed the foregoing instrument voluntarily for the purposes therein expressed.
Nota ublic: fN LYNELL D. VOLLAM
My Commission E �q�e Notary Public
j ' Commonwealth of Massachusetts
My Commission Expires
2 Fairgroun s Roaitcember2$, IMucket
508 - 228 -•7215 telephone
Massachusetts 02554
508 - 228 -7298 facsimile
5. Based upon the site plan entitled, "Proposed Site Plan in Nantucket,
Massachusetts" prepared by Bracken Engineering, Inc., dated December 22,
2014, showing both existing and proposed conditions on the Locus, and attached
herewith as "Exhibit A ", the Zoning Administrator finds that the proposed work
will neither increase the nonconforming nature of the structure on the Locus nor
create any new nonconformities and hereby issues the permit as requested. The
proposed extension, alteration, and change of the pre- existing, nonconforming
structure will not result in an increase to any setback nonconformity and in fact
will result in the structure and the Locus becoming less nonconforming as to side
and rear setbacks and conforming as to ground cover and parking. This approval
is subject to the following condition:
a. No exterior construction in connection with the project approved herein shall
occur between June 15 and Labor Day of any given year. 1
SIGNATURE PAGE. TO
.......... ................
1 See Memorandum to Town Clerk dated January 8, 2015