Thursday, March 24,2022
This meeting was held via remote participation using ZOOM and YouTube.
Called to order at 2:30 pm by Mr. Visco.
Staff in attendance: R. Santamaria, Health Director; K. LaFavre, Health Agent;J. Hedden, Health Agent; C.
Flynn, Health Agent;J.Visco,Health Agent;T. Norton,Town Minutes Taker
Attending Members: Stephen Visco;Malcolm MacNab,MD,PHD;James Cooper;Meredith Lepore
Absent Members: Melissa Murphy, Select Board
I. ANNOUNCEMENTS
II. PUBLIC COMMENTS-ANY MEMBER OF THE PUBLIC MAY ADDRESS COMMISSIONERS AT THIS TIME
1. None
III. APPROVAL OF MINUTES
1. February 17,2022
Action Motion to Approve. (made by: Mc) (seconded) '
Roll-call vote Carried 4-0//Cooper,MacNab,Lepore, and Visco-aye r
IV. DIRECTOR'S REPORT
1. At Town Meeting we have a several articles that should be discussed on April 8th. The first article will add a
couple of people-public info and contaminant review-and refund Artell Crowley's position. Another article is
the Plastic Ban. Lastly is the Short-term Rental Bylaw;he'll have copies of those articles.
V. BOH APPLICATIONS REVIEW
1. Variance request for 11 Osprey Way,82-3, 56.02 A& 64.04B Maximum flow rate.
Sitting Visco,MacNab, Cooper,Lepore
Documentation Supporting documents and plans, staff recommendations.
Representative Dan Mulloy, Site Design Engineering ,
Discussion Mulloy-Looking for a bedroom-credit variance to expand to 6 bedrooms using I/A technology.
Visco-He's had the chance to look at this.
Santamaria-No objections.
Action Motion to Approve. (made by: Cooper) (seconded)
Roll-call vote Carried 4-0//Cooper,MacNab,Lepore, and Visco-aye
2. Variancc request.for 30 Wanoma Way, 92.4 234,property line setbacks.
Sitting _ Visco,MacNab, Cooper,Lepore '
Documentation Supporting documents and plans, staff recommendations.
Representative Don Bracken,Bracken,Engineering
Discussion Santamaria-This permit has been approved and accidentally added to this agenda.
Action No action required
Roll-call vote N/A
•
Page 1 of 3
BOH Minutes for March 24,2022,adopted Apr.21
3. Variance Request for 5 Sheep Commons, 54-278, nitrogen loading Local BOH Reg 64.04 B. 1 &2.
Sitting Visco,MacNab, Cooper,Lepore
Documentation Supporting documents and plans, staff recommendations.
Representative Don Bracken,Bracken Engineering
Discussion Bracken—This is the last vacant lot in the subdivision,which was created in 1989..Most of these
lots were given 4-bedroom septic approvals after 1997. A similar variance was granted in 2017.
The lot is over 27,0000 square feet (sf) and with and I/A system, it will comply with Title 5. This
is within the Nantucket Harbor Watershed District.
LaFavre—Under current regulations,they would get only 2 bedrooms; she did some research and
there is another lot given an extra bedroom. All other lots are 3 or 4 bedrooms. Given the history
and land there should be no issue with granting the variance.
Action Motion to Approve. (made by: Cooper) (seconded)
Roll-call vote Carried 4-0//Cooper,MacNab,Lepore, and Visco-aye
4. Variance Request for 6 Nichols Road, 92.4-65; 15.405 (1)(a) set back to property line.
Sitting Visco,MacNab, Cooper,Lepore
Documentation Supporting documents and plans, staff recommendations.
Representative Don Bracken,Bracken Engineering
Discussion Bracken—This is a septic upgrade to I/A triggered by future renovations; there is no increase in
bedrooms. This is a private road with ownership to the center of the road; the septic is sited next
to the road but is designed for H-20 to withstand normal traffic.
Cooper—Asked who has say in what happens to the private road.
Bracken—Everyone has rights to use the road;no permission from other residents is required for
the positioning system.
Lepore—Asked how being in the road would affect the system should the road be widened.
Bracken—That's why it was designed to handle normal traffic, so they could widen the road over
this.
Action Motion to Approve. (made by: Cooper) (seconded)
Roll-call vote Carried 4-0//Cooper,MacNab,Lepore, and Visco-aye
5. Variance for 105 Tom Nevers Road, 91-25,nitrogen loading aggregate plan
Sitting Visco,MacNab, Cooper,Lepore
Documentation Supporting documents and plans, staff recommendations.
Representative Gerald Buzanoski, for the owner
Ken G,llicksen, Reade, Gnllicksen, Hanley, & Gifford LLP
Discussion Buzanoski—The system is approved for 3 bedrooms; his client wants to construct a 4-bedroom
house with the property 1,000' shy for allowance of the 4th bedroom. We propose to supplement
that by taking an easement on 107 Tom Nevers Road.
Cooper—Suggested it would be simpler for the owner to transfer the 1000 sf to 105 and be done
with it.
Buzanoski — Both lots are pre-existing, nonconforming; doing that would make 107 less
conforming than it is.
Visco—107 is a 22,000sf lot which would support only a 3-bedroom septic with I/A.
LaFavre — Requested that in the recorded document 105 be limited to 4 bedrooms and 107
limited to 3 bedrooms.
Buzanoski—That would be one of the requirements for that section of Title 5.
Visco—This has been done in other places;it's not an unusual request.
Lepore—Could 107 request a 4th bedroom.The GIS says that house already has 4 bedrooms.
Buzanoski—That's a 3-bedroom dwelling. The ownership of 105 and 107 is 2 distinct entities but
the same people;it's easy to grant the easement. Both systems will be I/A.
Action Motion to Approve with bedroom restrictions outlined by Ms. LaFavre. (made by: Cooper)
(seconded)
Roll-call vote Carried 4-0//Cooper,MacNab,Lepore, and Visco-aye
Page 2 of 3
BOH Minutes for March 24,2022,ado eted A'r.21
VI. BOH BUSINESS
=--------1. PFAS Update
Sitting Visco,MacNab, Cooper,Lepore
Discussion Santamaria—We are adding a position to work with contamination issues.
The school turf has been put on hold for further discussion;it might go to straight grass.We want
to see more data on the turf.
The Town and Airport have done a lot of work on PFAS to the point that, based upon
discussions with the State and consultants, it's better for the Town to slow down until the State
laws catch up. The Select Board has voted to put the expansion of the water system-west of the
Airport on their Town Meeting Article.
On Monday, the PFAS Action Group has secured a study on fire-fighting gear for how much
retardant and water proofing is on the equipment and the amount of PFAS it sheds; the professor
will be here on the 28th.
Lepore — Asked about the environmental impact on the 5-gallon spill at the Airport; that's
concerning for people nearby who aren't being put on Town water.
She thinks it would be important for BOH to make a statement on putting a hold on the Turf;it's
being pushed by the vendor. .
Santamaria—On the spill, he doesn't know of any impact;.they kept the spill out the asphalt.
He recommends against any statements regarding the Turf. He also recommends not using words.
such as pushing sales, bad science, etc. regarding that discussion. There is talk of legal action if we
don't curb. that type of language. We need cold, hard, empirical evidence before issuing a
statement.
MacNab—He supports Mr. Santamaria's recommendation.
Visco—This is so new and there aren't enough studies on the newer products.
2. COVID-19 Update
Sitting Visco,MacNab, Cooper,Lepore
Discussion Santamaria— Sewer reports consistently show less than 5 cases per day. Right now, we are base-
line Zero.This time last year we had a significant outbreak.
The newest subvariant,BA.2 has become dominant in the US, though there are increased number
of cases, the number of hospitalizations are not increasing.
The.,CDC director issued a statement that we are getting closer to the end of the pandemic. Sewer
testing will move to every two weeks. COVID is here to stay but is moving into the "influenza"
category with a seasonal ebb and flow.
3. MacNab —.As daffodils come out, ticks come out. With the inundation of COVID, we pushed tick-borne
diseases aside. The MIT team working on genetic mice and will be on Island to share their progress.
Santarnaria—We saw a spike in tick-borne diseases over the last two years.
VII. ADDITIONAL DOCUMENTS USED
1. Draft BOH Minutes February 17, 2022
VIII. ADJOURN
Action Motion to Adjourn at 3:09 prn. (made by: MacNab) (seconded)
Roll-call vote Carried 4-0//Cooper,MacNab,Lepore, and Visco-aye .
Submitted by:
Terry L. Norton .