HomeMy WebLinkAboutWoodard and Curran Monthly Update Jan 17, 2012_201401230916597138TOWN OF NANTUCKET, MASSACHUSETTS Monthly Update WOODARD & CURRAN 1 of 1 JANUARY 17, 2012 Projects 223970 Madaket Wastewater Treatment Facility & Collection System Phase 1 - Preliminary Design Phase Progress Last Month: Continued Endangered Species Monitoring Program. Executed Amendment No. 1 to the Madaket agreement to substitute planning activities. This Month: Submit Endangered Species Monitoring Report. Overlay Endangered Species and Archeological Evaluation Findings. Meeting with Natural Heritage and MHC once the Endangered Species Report is final to discuss potential required mitigation. Begin work under Madaket Amendment No. 1 to include Surfside WWTP Evaluation and Madaket forcemain option. Schedule Projected completion date – December 31, 2012 (Unchanged) Financial Phase 1 Budget - $348,630 Spent - $66,402 Town Action (s) Required: Forward executed Amendment No.1 once available. 224386 Wastewater Action Plan Phases 1 - 4 Progress Last Month: Continued to negotiate with SMAST staff to clarify information contained in the SMAST August 23rd Draft Technical Memorandum (model runs 1 – 3). Reviewed MEP Updated Technical Memorandum and created cover memo. Worked with BOH, MassDEP, the Administration and Town Counsel on the local ACO for failing onsite systems. Tabled (for the moment) the second Wastewater Action Plan Newsletter (to be produced prior to 2012 Annual Town Meeting. Town of Nantucket, Massachusetts Project Update January 16, 2012 WOODARD & CURRAN 2 of 2 Reviewed the MassDEP 2012 Project Evaluation Form content for the CWMP Update, working with the Administration to present a 2013 capital expenditure request for March 31, 2012 ATM consideration. This Month: Work with SMAST to finalize the Jetty-only model run for Nantucket Harbor. Continue to coordinate with the Town and SMAST on the Nantucket Harbor model runs with the goal of finalizing the updated January 4, 2012 SMAST Technical Memorandum for public release. Finalize the second Newsletter in February for use by Selectmen and Administration in preparation for 2012 ATM. Schedule Projected completion date – April 15, 2012 Financial Budget - $186,000 Spent - $170,863 Town Action (s) Required: Assist in coordination of Nantucket Harbor model runs. Assist in drafting CWMP Update presentation for FinCom / ATM. Newsworthy Laurentide Environmental LLC is in the process of preparing the endangered species survey report. MassDEP roll-out of Madaket Harbor/Long Pond TMDL What to look for this month: Issuance of endangered species survey (FAA site) report. Finalize CWMP Update scope of work and prepare Newsletter and ATM presentations.