Loading...
HomeMy WebLinkAbout8.22.13_Minutes_201503101259586669 Town of Nantucket NANTUCKET MEMORIAL AIRPORT 14 Airport Road Nantucket Island, Massachusetts 02554 Thomas M. Rafter, A.A.E., Airport Manager Commissioners Phone: (508) 325-5300 Daniel W. Drake, Chairman Fax: (508) 325-5306 Arthur D. Gasbarro, Vice Chair David C. Gray, Sr. Andrea N. Planzer Jeannette D. Topham Special AIRPORT COMMISSION MEETING August 22, 2013 The meeting was called to order at 4:00 PM by Chairman Daniel W. Drake, with the following Commissioners present, Vice Chair Arthur D. Gasbarro, David C. Gray, Sr., and Jeanette D. Topham. Andrea N. Planzer was absent. The meeting took place in the Temporary Airport Manager’s Office, 126A Old South Rd. Airport employees present were Thomas M. Rafter, Airport Manager, Ashley Christ, Business Manager, Noah Karberg, Environmental Coordinator, and Janine Torres, Office Manager. Mr. Drake asked for any comments on the Agenda. Hearing none the Agenda was approved. 062513-1 Re-Align and Widen Taxiway Connector – Accept Revised FAA Grant Offer of $606,000 – Mr. Drake reminded the Commission of the previously accepted Grant Offer for this project was $516K. Mr. Rafter added, per the FAA’s instruction, the original Grant Offer was voided so that the additional labor cost associated with correcting the RW edge markings associated with the RW33 Extension Project could be incorporated. The corrective painting will be completed through this new project. Motion to accept the FAA Grant Offer of $606,000 for FAA Airport Improvement Project 3-25- 0033-058-2013 made by Mr. Gasbarro. Second by Mr. Gray and Passed Unanimously. 082213-1 FY2015 TON Capital Request Review & Discussion – Mr. Rafter presented six (6) items to be presented to the TON Capital Committee indicating the total approximate cost to the Airport of $273K may seem extreme; but all the items are needed: Replace ARFF Vehicle (Airport 1). Estimated cost to Airport is $42,500 Replace Operations Vehicle (Airport 11). Estimated cost to Airport is $60,000 IT Infrastructure (Server/Computers/VOIP Phone). Estimated cost to Airport is $31,000 Airport Security Upgrades (Door egress/Fencing/Training Program). Estimated cost to Airport is $17,200 Aircraft Ramp Rehabilitation (Commercial Ramp). Estimated cost to Airport $25,000 Environmental Stewardship (Truck/Skid Mounted Sprayer, IGA). $97,500 8.22.13 Special Airport Commission Minutes Page 2 of 2 After brief discussion, Mr. Gasbarro made a Motion to approve the FY2015 Capital Requests. Second by Mr. Gray and Passed Unanimously. Discussion moved to the Long Term Capital needs initially presented at the August 13th meeting. After discussion, it was determined a new GPU should be planned in later years. Mr. Rafter will verify if VALE funds would cover a GPU. Shoreline Incursion will be planned after the year 2020 with an approximate cost of $5M. Mr. Topham made a Motion to approve the Long Term Capital Needs as amended. Second by Mr. Gray and Passed Unanimously. Public Comment None. Motion to adjourn by Mr. Gray. Second by Ms. Topham and Passed Unanimously. Meeting adjourned at 4:28 PM. Respectfully submitted, ____________________________ Janine M. Torres, Recorder Master List of Documents 8/22/13 Agenda FAA Grant Offer dtd 8/15/13 FAA Grant Offer dtd 7/17/13 FY2015 Capital Request Cost Summary FY2015 Capital Request Submission Sheet: ARFF Vehicle FY2015 Capital Request Submission Sheet: Ops Vehicle FY2015 Capital Request Submission Sheet: IT Upgrades FY2015 Capital Request Submission Sheet: Security Upgrades FY2015 Capital Request Submission Sheet: Ramp Rehab FY2015 Capital Request Submission Sheet: Environmental Long Term Capital Needs Spreadsheet