Loading...
HomeMy WebLinkAboutMCZM Coastal Resiliency - MCZM Coastal Resiliency GrantMADAKET EROSION CONTROL PROJECT MCZM Coastal Resiliency Grant Madaket Road/Ames St Town of Nantucket Provincetown, Center for Coastal Studies MCZM Shoreline Change Maps Madaket Action Items Identified in the CMP Asphalt removed Beach nourishment permitted Eroded bank filled Sacrificial sand berm Relocate Jersey barriers Fencing/signage Plantings Monitoring MADAKET RD @ AMES STREET BEFORE MADAKET RD @AMES STREET AFTER Madaket Road/Ames Street February 2017 Erosion Control Measures in Madaket Erosion control project at intersection complete Permit from CONCOM to replace sand as needed Permits from DEP & USACOE for Sand Bank Island wide dredge plan being developed, (150K$) Hither Creek dredge disposal site on barrier beach to protect from over wash Provincetown Center for Coastal Studies (PCCS) Storm tide-pathways developed for the entire island, identifies locations of vulnerability for different levels of inundation Encourage private property owners to install erosion control measures (snow fencing, plantings, dune guard, signage) DPW to evaluate additional methods to divert run-off within the intersection Polpis Harbor Entrance Channel Dredging Sand Bank Storage Area Sand Bank Storage Area Alternative Town of Nantucket Coastal Management Plan Identified Sites Storm Tide-pathways TON GIS Hurricane Flood Inundation /GIS MCZM Ocean Management Plan