Loading...
HomeMy WebLinkAbout04262013 Sewer Planning Work Group MinutesSPWGMINUTES20130426.DOCX Page 1 188 madaket road 02554 Department of Public Works Town of Nantucket Massachusetts (508) 228-7244 (508) 228-7245 (508) 228-7289 FAX Sewer Planning Work Group Minutes Monday, April 26, 2013 – 9:00 am Town Building Conference Room 16 Broad Street, Nantucket, MA 1. Call to order at 9:10 by Chair, Nancy Wheatley. Chair announced that Matt Fee is newly designated as representative of B.O.S. Chair announced that Bob Williams would participate remotely by phone, due to geographic distance. Members present: Dual McIntyre, Tim Soverino, Matt Fee, Mike Glowacki, Charlie Stott, Steve Anderson. Staff assistance: DPW Director Buzanoski, Planning Director Vorce. 2. Review minutes from previous meetings. Chair announced that the minutes of prior meetings were not yet available and asked for a volunteer to take on the task of minutes. By unanimous consent, Mike Glowacki will draft minutes. 3. Review of unconnected/unbilled properties in the Sewer Districts. • DPW Director reviewed the highlights of Woodward & Curran quarterly updates to the BOS on April 24, 2013 with the power point presentation (attached). o The scope of the Town Contract with Woodward & Curran (June 2012) to update the 2004 CWMP had been expanded to include the Hummock Pond Watershed area, following a contract between the Nantucket Land Council and SMAST, which had concluded SPWGMINUTES20130426.DOCX Page 2 impairments there may be due to septic issues, storm-water issues, wildlife, or some combination. Woodward & Curran will determine whether Hummock Pond Watershed qualifies as a needs area. o Woodward & Curran had determined that the actual ratio of secondary dwellings to primary dwellings (within the sewer district) was not 2/3 as assumed for the 2004 CWMP, but 12%.  Town Administration has directed that the assumption be 25% for this update. • Discussion continued on identifying properties. o DPW Director reported that the task continues to identify those properties within the sewer district which are served by town water, but are not billed for sewer service. Presently something more than two hundred such properties are identified. The list to be available for next meeting. 4. Discussion and/or recommendations to BOS regarding policy for recovery of past charges from unbilled properties • By unanimous consent, the group approved the chair’s summary of the discussion: ‘The chair (with input from the committee) will develop a memo to the BOS, summarizing the issue, and will circulate for individual edits. Chair will recirculate a final version to the committee before forwarding to the BOS.’ 5. Discussion on options for changing current capital recovery • Deferred to next meeting Next meeting Friday May 31, 9 a.m., Town Building Conference Room. Topics: Review list of unbilled properties, Capital Recovery Options, Outreach. Contact Phone: Nancy Wheatley at 617-417-9377 or Kara Buzanoski, DPW Director 508-228-7244 Board of Selectmen Town AdministrationWOODARD & CURRANPHASE IIB / CWMP UPDATE ‐ QUARTERLY UPDATEApril 24, 2013 Phase IIB – Downtown Sewer RehabProject Status–Bids Received On Wednesday, December 12, 2012–Total Of 5 Bids Received ‐ C.C. Construction, Inc. from S. Dennis, MA Low  Bidder–C.C. Construction Bid Price ‐ $3,494,320.87 for the Base Bid and Alternate  1 Work–Bid Price ‐ Well Within the Town’s Available Budget –Construction Start Mid‐January 2013 –End May 2014–Construction Shut‐downs – Contractor Responsible for Issues & Repairs• Daffodil Days –April 2012 & 2013• May 15 to October 2, 2013• Christmas Stroll – December 2012 Phase IIB – Downtown Sewer RehabSpring 2013 Update–Main Street• Sewer Complete – Cobbles Replaced This Season–Fair Street / North Water Street• Pipe Burst Complete –Road Patched For Summer and Resurfaced In  Fall–Hussey Street / Whalers Lane• Sewer and Water Complete ‐ Road Patched For Summer and  Resurfaced in Fall–Centre Street / India Street• Sewer Complete–Quince Street• Water Complete – Sewer Completed in Fall–Sea Street / Gay Street• Manhole to be Replaced Phase IIB – Downtown Sewer RehabFall 2013 Work Plan–Broad Street / Easy Street• Sewer, Water and Stormwater–South Street• Sewer and Stormwater–Academy Lane• Sewer and Water–Ash Lane / Ash Street / East Chestnut Street• Sewer  Phase IIB Site  Map Phase IIB – Downtown Sewer RehabNew Items–The Jetties• Source of Sea Water at WWTF• Significant Source of Inflow Identified –Old Brick Manholes• Clay Pipe Replaced With Plastic Pipe by Pipe Bursting• Manholes to be Replaced–Madison Alley• Damaged, Leaking Pipe Identified• Pipe Burst Successful –Avoided Major Impacts–Issues• Existing Utilities –Unforeseen Challenges• Field Conditions –Loss of Time and Need for Additional Resources• Record Information of Service Ties – Limited• Clay Soils Encountered–Budget• Within Expectations CWMP Update StatusProgress to Date–Delineated Updated Map of Needs / Study Areas• Coordinated Town‐wide Efforts–Board of Health• Review of Records 2004 to Present–Hummock Pond Estuary Study• Implementation & Schedule–Preliminary Summer / Winter Flow Estimates• All Study  / Needs Areas / Town Sewer District Build Out Study Area  ‐ Needs Area Update Map Town Sewer District UpdateTown Sewer District (TSD)– Utilized Town’s Sewer User Billing Records• Delineate Parcels Within TSD Connected• Delineate Parcels Within TSD NOT Connected• Breakdown Future Developable ParcelsResults– Users NOT Receiving Bills• Lost Revenue• Nitrogen Load Issues in Nantucket Harbor– Town Needs to Evaluate and Correct Billing Data• Relook at Build Out Flows / Correct MEP Nitrogen Load Town Sewer  District Map Flows and Loads Update2004 CWMPCWMP UpdateDesign Flows with 2nd  DwellingsAverage Daily  FlowNeed / Study AreaWinterSummerWinterSummerMadaket169,516293,00791,850158,800WarrensLanding27,49747,56218,50032,000HummockPondSouth38,20066,070HummockPondNorth56,73097,980Somerset63,139108,79451,63089,030Monomoy69,936120,55148,89084,550Shimmo57,10798,67535,94062,150Town Sewer District Build Out358,569612,704Total Flows700,3091,203,284 Capacity Analysis UpdateSurfside Wastewater Treatment Facility– Design & Groundwater Discharge Permit  ‐ 3.5MGD– On‐Going Due Diligence to Verify• Hydraulic Capacity• Biological Treatment Capacity• Groundwater Disposal Bed Capacity– Assess Need and Potential for WWTF Expansion• CWMP Study / Needs  Areas / Existing Flows ‐ Final Flows and Loads• Madaket / Warrens Landing Cross Island Alternative  CWMP Update ‐ On‐Going Work– Hummock Pond Estuary – Sesechacha Pond– Total Maximum Daily  Loads (TMDLs)• Nantucket Harbor• Polpis Harbor• Madaket Harbor• Long Pond– Board of Health Tasks– Stormwater– Alternatives Analysis– FAA Site– Town Sewer District– Island‐Wide Water  Quality Testing– Alternatives Discussion– Ocean Outfall Moving ForwardCWMP Update–Coordinate Efforts Through DPW–Continue with MassDEP Approved Scope of Work–Coordinate Efforts With SMAST•Sesechacha Pond Study•Hummock Pond Estuary Study•Additional Model Run Scenarios–Alternatives Evaluation–Stormwater Evaluation–Surfside WWTF Evaluation–Energy Initiative–Continue Public Outreach Required Town Actions•Town Sewer District Evaluation–Sewer Connection Policy–Local Regulation 69.00 ‐ Implement and Enforce•Financing (Future)–Appropriate Policies•Fertilizer Management–Education and Implementation•Septic ACO Program–Educational  and Implementation–Needs Areas Expansion•Stormwater Management–Prepare Master Plan•Public Outreach–Consensus Building QUESTIONS & ANSWERSWOODARD & CURRANPHASE IIB / CWMP UPDATE –QUARTERLY UPDATEApril 24, 2013