Loading...
HomeMy WebLinkAbout02272012 Energy Study Committee MinutesDraft minutes of The ESC Wind Turbine Risk Assessment Subcommittee meeting on Feb 27th., 2012, 1.30 pm, Public Meeting Room, 2 Fairgrounds Road The meeting was called to order by Chairman Peter Morrison at 1:33 pm. In attendance were subcommittee members John Stover, Ken Blackshaw, Frank Kaminski, and Whitey Willauer. Also present were Selectmen Rick Atherton, Bill Tornavish, Jason Graziadei, and Lauren Sinatra. The reading of the minutes from the previous minutes was waived and motion was made, seconded, and approved to accept them. Peter Morrison’s opening statement pointed out that our task today would be to agree on the cover memo that will transmit our report of Assessed Risks to the Finance Committee. To whit, the following motion was made by Ken Blackshaw, seconded by John Stover, and passed unanimously. This Subcommittee (reporting on behalf of the Town’s Energy Study Committee) is highly confident that the information set forth in this Final Report furnishes an accurate and reliable basis for decision making. We do foresee continuing minor refinements going forward as data are updated, and we stand ready to update this Report as appropriate, but such refinements will not alter our conclusions and recommendations to you – as follows: We have used a statistical analysis of wind speed data and computer software to produce an estimate of annual energy from the power output curve of the Power Wind 900 KW turbine. Best practices analysis provides a strong basis for anticipating that a wind turbine at the Madaket site can produce the requisite performance characteristics and reliability that will produce positive cash flows throughout the 20 year planning horizon. The project’s inherent economic uncertainties pertain not to whether the project will produce a positive cash flow, but rather to the magnitude of that positive cash flow. These inherent uncertainties as to magnitude might trouble large-scale investors seeking a tightly estimated “risk-reward” metric. The Town, by contrast, needs assurance that this project will produce positive cash flows throughout its projected twenty-year project life; their magnitude is secondary. The Subcommittee has reached unanimous agreement that a Madaket Wind Turbine will produce significant positive cash flows throughout its projected twenty-year project life. Respectfully submitted by Ken Blackshaw, Secretary Pro Tem